Mids - AOMR - Lot 1 - Derbyshire Desilts
Buyer: Environment Agency
Description
Desilting of Harrington Drain west of Wilsthorpe Road (36m) and culverts (18m) under Wilsthorpe Road to improve conveyancing. Desilting of Golden Brook at Far Croft to remove gravels upstream and downstream to improve conveyancing. Desilting of Repton Brook at Brook End (silted under and upstream of Brook End bridge), Askew Grove (silted upstream and downstream of Askew Grove bridge) and Pinfold Lane (silted upstream and downstream of Pinfold Lane bridge) to improve conveyancing. Desilting of Hemington Brook (north of Hemington Primary School) to remove silt and weeds and improve conveyancing. Desilting of Hemington Brook (off Church Lanel) to remove silt to improve conveyancing. Desilting of Lockington Brook adjacent to Main Street to improve conveyancing. Desilting at Hogshaw Brook (confluence of Hogshaw Brook and River Wye off Bakewell and Fairfield Road and northwest of Fairfield Road bridge), to remove debris build up to improve conveyancing.
Awarded to
CPV codes
- 45246000 — River regulation and flood control works
- CPV category
- River regulation and flood control works (45246000)
- Procurement method
- Call-off from a framework agreement
- Published
- 07 Jul 2026 14:06
- VCSE suitable
- No
- OCID
- ocds-b5fd17-f677eef8-13c2-484c-a149-780b2ef2d264
- Notice ID
- CF-0654400D8d000003VQwdEAG
- In our database since
- 17 Aug 2026