Barrow EnergyDock Floating Solar - Royal Port of Barrow
Buyer: ASSOCIATED BRITISH PORTS
Description
Associated British Ports (ABP) is exploring market capability and appetite to deliver a utility-scale floating solar array at Cavendish Dock, Barrow-in-Furness. The indicative project is a circa 32 megawatt (MW) floating solar installation occupying approximately 18 hectares with annual output capable of powering the equivalent of 10,100 homes. The market engagement will inform ABP’s procurement, packaging and contract strategy, providing insights into appropriate delivery models (including but not limited to EPC and EPC+O&M), key risks and constraints (including marine environment, moorings/anchoring, electrical and civil balance of plant and grid connection), and the supply chain’s ability to meet the programme.