Boxbay Enabling Civil Works
Buyer: LONDON GATEWAY PORT LIMITED
Description
The enabling works consist of the installation of new below ground utility ducting; new fire water pipework; new fire hydrants; and new drainage pipework along with associated access chambers. Additionally, existing electrical services and equipment will be diverted/relocated including an existing feeder pillar; an electric vehicle charger; supplies for existing yard lighting; and other small power supply requirements. To facilitate this, demolition and removal of existing yard areas will be required; excavation for the installation of the above services; and the reinstatement of new yard finishes. It is intended that the enabling works commence in April 2026 for a duration of 3 months. Civil works required include: • Installation of new utility ducting and chambers • Removal/diversion of existing electrical supplies including feeder pillars, EV charger etc. • Installation of HV cabling • Installation of Earthworks and heavy duty pavement • Installation of new surface water drainage pipework • Installation of new fire hydrants and pipework
- CPV category
- —
- Procurement method
- Competitive flexible procedure
- Published
- 23 Jan 2026 17:39
- VCSE suitable
- —
- OCID
- ocds-h6vhtk-060dd2
- Notice ID
- ocds-h6vhtk-060dd2
- In our database since
- 18 Aug 2026