Updated hourly from UK government portals and TED (EU) WhatsApp contact@tendernotify.co.uk
Back to search Find a Tender
TENDER Active Services

Integration Technical Operations Assurance & Environment (ITOAE)

Published Today
30 Oct 2026


Reference: CT4946
The East West Railway Company (the Authority) is responsible for the delivery of East West Rail (EWR), a Nationally Significant Infrastructure Project providing new and upgraded rail links between Oxford, Milton Keynes, Bedford and Cambridge. EWR Co. is responsible for leading the development, procurement and commissioning of the railway. The Authority is undertaking a procurement for an Integration, Technical, Operations, Assurance and Environmental (ITOAE) Partner to support the development and delivery of the EWR programme. Overview of the Intended Contract. The Authority is appointing a single ITOAE Partner under an NEC4 Professional Service Contract, operated as a term appointment, for a period of up to twelve (12) years, with value-for-money breakpoints at Years 3, 6 and 9. The ITOAE Partner is a single contract: it is not a framework and it is not divided into lots. Services comprise a continuous Core Services baseline across all five pillars (Integration; Technical; Operations; Assurance; and Environmental & Consents), with time-bound Authorised Services instructed as required. Relationship with the CSF and main works. The Authority is separately procuring a Client Support Framework (CSF). The Authority's position is that the ITOAE Partner will be structurally separated from the CSF and from the main works: the appointed ITOAE Partner will not be eligible to be awarded a main works contract or a place on the CSF for the duration of the ITOAE contract. The purpose of this separation is to protect the independence of integration and assurance, to mitigate real or perceived conflicts of interest, and to align with independent review findings on major programme governance (including the Stewart Review, 2025). Conditions of Participation. The conditions of participation are summarised in the Participation section of this notice and will be assessed, with full detail and scoring, in the Pre-Selection Questionnaire (PSQ) issued at the selection stage, in accordance with the Procurement Act 2023 and the Procurement Regulations 2024. Indicative Scope of Services. At this stage, the Authority has defined the high-level scope of services. These are expected to include, by pillar: Integration: support EWR's Prime System Integrator role; develop and maintain the System Integration Strategy and Master Integration Schedule; identify, manage and resolve technical, organisational and contractual interfaces; configuration control and change alignment; migration and transition planning; coordinate integration with Network Rail, TOCs/FOCs, DfT, ORR and adjacent programmes; manage integration risks and assumptions; coordinate systems integration testing and proving; and uplift EWR's integration capability. Technical: define and maintain technical frameworks, standards and design principles; provide independent technical challenge and assurance of design; support the Client's Design Authority; systems engineering (SEMP, requirements, MBSE); manage technical interfaces; digital integration (BIM / ISO 19650, Digital Spine); testing, validation and Entry Into Service readiness; capability to act as Lead Design Organisation (LDO) under NR/L2/RSE/02009 for specified areas; design maturity assessment at PACE reviews; legislation and standards management; safety cases (EN 50126/50128/50129) and Independent Safety Assessment coordination; and whole-life asset management (ISO 55000). Operations: support the Concept of Operations and Maintenance; train plan and timetable development and modelling; operational performance modelling; rolling stock (BEMU) and depot support; route compatibility and certification; Trial Running and Trial Operations; operational readiness and Entry Into Service; staff competence and route learning; and integration with Train Operators and the future Infrastructure Manager (Network Rail / GBR). Assurance: provide independent, programme-level (second-line / LOD2) assurance across all pillars; define and implement the assurance framework and schedule; coordinate design, technical and construction assurance; authorisation and certification strategies; submit evidence to regulators; track assurance actions to closure; provide a Construction Quality capability under NR/L2/RSE/02009; support GMPP reporting to DfT and NISTA; maintain the Integrated Assurance & Approvals Strategy; and assure ISO 19650, CDE and Digital Spine compliance. Environmental & Consents: coordinate the environmental and consents strategy; manage post-DCO consents and approvals; assure environmental compliance and commitments; lead carbon and sustainability (PAS 2080, BREEAM); support NPSNN compliance; manage DCO commitments and Requirements discharge; maintain the Environmental Statement and monitoring; support Biodiversity Net Gain; set and audit the Code of Construction Practice / LEMP standard; and coordinate statutory pollution, noise and species consents and licensing. This procurement will be run concurrently with others. Bidders may tender for any or all of the Lots/Contracts identified in the table shown in document ‘ITOAE - Appendix A - Package Bidding and Award Constraints’. This approach is intended to support market participation and allow bidders to put forward appropriate delivery solutions. However, submitting tenders for multiple Lots/Contracts across the Procurements does not mean a bidder will be eligible to be awarded all Lots/Contracts. Award decisions will be subject to the Lot/Contract interaction rules set out in the letter, which are intended to: • Maintain independence between assurance, management and delivery functions. • Avoid conflicts of interest. • Prevent excessive concentration of specialist services within a single organisation. • Preserve effective commercial oversight. • Ensure suppliers have sufficient capacity and capability to successfully deliver awarded contracts. Please ensure you refer to the document ‘ITOAE - Appendix A - Package Bidding and Award Constraints’ or further detail.

Full CPV breakdown

  • 71300000 — Engineering services (primary)

Notice details

Buyer type
Central government
Competition
Restricted / competitive (suppliers are shortlisted first)
Contract type
Services
Procurement method
Competitive flexible procedure
Main category
Services
Above threshold
Yes
Legal basis
UKPGA 2023/54
Notice status
Active
Submission method
https://eastwestrail.ukp.app.jaggaer.com/esop/guest/go/opportunity/detail?opportunityId=61134
Enquiries close
6 Nov 2026
Award decision expected
30 Nov 2027
Reserved / special regime
Utilities
Language
EN
Published
30 Oct 2026 17:25
OCID
ocds-h6vhtk-079509
Notice ID
CT4946

Everything the publisher included in this notice, organised by section.

Organisations

Name East West Rail Company Limited
Address › Street The Quadrant, Milton Keynes
Address › Town / city MILTON KEYNES
Address › Postcode MK9 1EN
Address › Country GB
Address › Country United Kingdom
Address › Region (NUTS) UKJ12
Contact › Email Commercial@eastwestrail.co.uk
Role buyer
Classification › Description Public authority - central government

Buyer

Name East West Rail Company Limited

Tender

Title Integration Technical Operations Assurance & Environment (ITOAE)
Status active
Item › CPV › CPV 1 › Description Engineering services
Item › CPV › CPV 2 › Description Civil engineering consultancy services
Item › CPV › CPV 3 › Description Railway engineering services
Item › CPV › CPV 4 › Description Supervision of project and documentation
Item › CPV › CPV 5 › Description Project management consultancy services
Item › CPV › CPV 6 › Description Health and safety consultancy services
Item › CPV › CPV 7 › Description Environmental services
Item › Delivery › Delivery 1 › Region (NUTS) UKH
Item › Delivery › Delivery 1 › Country GB
Item › Delivery › Delivery 1 › Country United Kingdom
Item › Delivery › Delivery 2 › Region (NUTS) UKJ
Item › Delivery › Delivery 2 › Country GB
Item › Delivery › Delivery 2 › Country United Kingdom
Item › Delivery › Delivery 3 › Region (NUTS) UKF
Item › Delivery › Delivery 3 › Country GB
Item › Delivery › Delivery 3 › Country United Kingdom
Value › Value incl. VAT £360,000,000
Value › Value £300,000,000
Value › Currency GBP
Procedure type selective
Procedure Competitive flexible procedure
Category services
Special regime utilities
Above threshold Yes
How to submit https://eastwestrail.ukp.app.jaggaer.com/esop/guest/go/opportunity/det...
Submission Terms › Electronic submission allowed
Submission Terms › Languages en
Expression Of Interest Deadline 13 Nov 2026
Questions period › End 6 Nov 2026
Award decision period › End 30 Nov 2027
Lot › Status active
Lot › Value › Value incl. VAT £360,000,000
Lot › Value › Value £300,000,000
Lot › Value › Currency GBP
Lot › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Award criteria › Criterion › Criterion 1 › Name Technical
Lot › Award criteria › Criterion › Criterion 1 › Description The overall award weighting is fixed at 70% quality and 30% commercial. The detailed sub-criteria, questions and scoring will be set out in the Invitation to Tender (ITT). In accordance with section 24 of the Procurement Act 2023, the Authority may refine the sub-criteria and questions within these weightings; the overall 70% quality / 30% commercial weighting will not change.
Lot › Award criteria › Criterion › Criterion 1 › Weighting › Weight 60
Lot › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Award criteria › Criterion › Criterion 2 › Name Commercial
Lot › Award criteria › Criterion › Criterion 2 › Description The overall award weighting is fixed at 70% quality and 30% commercial. The detailed sub-criteria, questions and scoring will be set out in the Invitation to Tender (ITT). In accordance with section 24 of the Procurement Act 2023, the Authority may refine the sub-criteria and questions within these weightings; the overall 70% quality / 30% commercial weighting will not change.
Lot › Award criteria › Criterion › Criterion 2 › Weighting › Weight 30
Lot › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Award criteria › Criterion › Criterion 3 › Type quality
Lot › Award criteria › Criterion › Criterion 3 › Name Social Value
Lot › Award criteria › Criterion › Criterion 3 › Description The overall award weighting is fixed at 70% quality and 30% commercial. The detailed sub-criteria, questions and scoring will be set out in the Invitation to Tender (ITT). In accordance with section 24 of the Procurement Act 2023, the Authority may refine the sub-criteria and questions within these weightings; the overall 70% quality / 30% commercial weighting will not change.
Lot › Award criteria › Criterion › Criterion 3 › Weighting › Weight 10
Lot › Award criteria › Criterion › Criterion 3 › Weighting › Weight type Percentage exact
Lot › Second Stage › Maximum Candidates 5
Lot › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Suitable for › SMEs Yes
Lot › Contract period › Start 3 Apr 2028
Lot › Contract period › End 31 Mar 2040
Document › Document 1 › Document type Conflict of interest
Document › Document 1 › Description Not published
Document › Document 2 › Document type Bidding documents
Document › Document 3 › Document type Tender notice
Document › Document 3 › Description Tender notice on Find a Tender
Document › Document 3 › Link https://www.find-tender.service.gov.uk/Notice/103452-2026
Document › Document 3 › Published 30 Oct 2026
Track this tender

Track this tender in your bid pipeline and set reminders.

See plans

Never miss a contract you could win

Search every UK public sector tender in one place, and get alerts the morning new ones appear.

Free to search No card needed Cancel any time
WhatsApp us