Updated hourly from UK government portals and TED (EU) WhatsApp contact@tendernotify.co.uk
Back to search Find a Tender
PIN Planned Works

Automated People Mover (APM) Infrastructure

Published 26 May 2026
26 May 2026

Primary CPV
45234000 *
Construction work for railways and cable transport systems
Location
🇬🇧 Birmingham, West Midlands
Value
£154,000,000
Contract
4.3 years Duration
19/04/2029 19/07/2033
Contract Types
45 *Construction work
Full CPV Breakdown
SME suitable
Not stated

Publisher Address

Two Snowhill, Snow Hill Queensway, Birmingham, B4 6GA, United Kingdom · UKG31

Contact

Award Criteria

Not specified

Reference: _2978
The HS2 Phase One route is from London Euston to the West Midlands and includes the development of high-speed rail stations at London Euston, London Old Oak Common, Birmingham Interchange and Birmingham Curzon Street.The proposed HS2 Birmingham Interchange Station will be situated approximately 20 km to the southeast of Birmingham city centre, close to Birmingham Airport. An Automated People Mover (APM) is required to transport passengers from adjacent areas to the Interchange Station and the wider HS2 network. The APM network will consist of a maintenance facility and four stops detailed herein: I. Interchange Station stop; II. National Exhibition Centre stop; III. Birmingham International Railway Station stop; and IV. Birmingham Airport stop. The APM has been designed as an elevated mass transit system, which will transport passengers between those stops detailed above. The APM route will consist of a 2.3km long viaduct, four stops and a maintenance facility. The Interchange Station Stop is at ground level and the three other stops and maintenance facility are on the viaduct (above ground level). The route has several major crossings to navigate, such as the M42 motorway, the West Coast Main Line (WCML) and Pendigo Lake at the National Exhibition Centre (NEC) site. The key design features of the APM Infrastructure include reinforced central concrete piers, weathered steel deck and escape walkway gratings throughout the entirety of the track. To minimise impact to the existing developed site and public roads, the entire 2.3km route is on an elevated viaduct. This is made up of a range of single and twin track at various points along the route to allow trains to pass each other.The piers range from 6 metres high to 14 metres, depending on the topography along the route. In order to maintain a consistent level for the viaduct, the columns will need to vary in height. The stops at Birmingham Airport and at Interchange Station will have a single platform face and the intermediate stops at the NEC and Birmingham International Railway Station have two platform faces. The platforms vary from 36m to 40m long and all platforms are fully covered with canopies and have step free access. The APM Infrastructure scope includes the detailed design and delivery of all piers, viaducts, APM stops, the APM maintenance facility as well as temporary works. The APM Infrastructure Contractor will be the Principal Contractor for the works and will be responsible for managing the APM Systems Contractor as well as nominated HS2 Contractors during these works. The APM Infrastructure Contractor will be responsible for managing all the interfaces and access for the works. Further details on interfacing contractors will be provided in the Tender documentation for the APM Infrastructure procurement.

Full CPV breakdown

  • 45234000 — Construction work for railways and cable transport systems (primary)

Notice details

Buyer type
Local authority
Contract type
Works
Main category
Works
Legal basis
UKPGA 2023/54
Notice status
Planned
Reserved / special regime
Utilities
Language
EN
Published
26 May 2026 12:34
OCID
ocds-h6vhtk-0519dd
Notice ID
_2978

Everything the publisher included in this notice, organised by section.

Planning

Document › Document type Planned procurement notice
Document › Description Pipeline notice on Find a Tender
Document › Link https://www.find-tender.service.gov.uk/Notice/048677-2026
Document › Published 26 May 2026

Organisations

Name High Speed Two (HS2) Limited
Address › Street Two Snowhill, Snow Hill Queensway
Address › Town / city Birmingham
Address › Postcode B4 6GA
Address › Country GB
Address › Country United Kingdom
Address › Region (NUTS) UKG31
Contact › Email scc@hs2.org.uk
Role buyer
Link https://www.hs2.org.uk/
Classification › Description Public authority - sub-central government

Buyer

Name High Speed Two (HS2) Limited

Tender

Title Automated People Mover (APM) Infrastructure
Item › CPV › CPV 1 › Description Construction work for railways and cable transport systems
Item › CPV › CPV 2 › Description Construction work
Item › Delivery › Region (NUTS) UK
Item › Delivery › Country GB
Item › Delivery › Country United Kingdom
Value › Value incl. VAT £184,800,000
Value › Value £154,000,000
Value › Currency GBP
Category works
Special regime utilities
Lot › Suitable for › SMEs Yes
Lot › Contract period › Start 19 Apr 2029
Lot › Contract period › End 19 Jul 2033
Lot › Status planned
Communication › Expected publication 5 May 2027
Amendment › Description Please note change to Tender Notice date and Contract Start date.
Status planned
Track this tender

Track this tender in your bid pipeline and set reminders.

See plans

Never miss a contract you could win

Search every UK public sector tender in one place, and get alerts the morning new ones appear.

Free to search No card needed Cancel any time
WhatsApp us