Back to search
Find a Tender
PIN
Planned Works
Automated People Mover (APM) Infrastructure
Published 26 May 2026
26 May 2026
- Primary CPV
-
45234000 *
Construction work for railways and cable transport systems
- Location
- 🇬🇧 Birmingham, West Midlands
- Value
- £154,000,000
- Contract
-
4.3 years Duration
19/04/2029 19/07/2033
- Contract Types
-
45 *Construction workFull CPV Breakdown
- SME suitable
- Not stated
Publisher Address
Two Snowhill, Snow Hill Queensway, Birmingham, B4 6GA, United Kingdom · UKG31
Contact
Award Criteria
Not specified
Related tenders
High Speed Two (HS2) Limited
All notices from this publisher Same CPV code
45234000 *
All notices with this CPV code
Reference: _2978
The HS2 Phase One route is from London Euston to the West Midlands and includes the development of high-speed rail stations at London Euston, London Old Oak Common, Birmingham Interchange and Birmingham Curzon Street.The proposed HS2 Birmingham Interchange Station will be situated approximately 20 km to the southeast of Birmingham city centre, close to Birmingham Airport. An Automated People Mover (APM) is required to transport passengers from adjacent areas to the Interchange Station and the wider HS2 network. The APM network will consist of a maintenance facility and four stops detailed herein:
I. Interchange Station stop;
II. National Exhibition Centre stop;
III. Birmingham International Railway Station stop; and
IV. Birmingham Airport stop.
The APM has been designed as an elevated mass transit system, which will transport passengers between those stops detailed above. The APM route will consist of a 2.3km long viaduct, four stops and a maintenance facility. The Interchange Station Stop is at ground level and the three other stops and maintenance facility are on the viaduct (above ground level). The route has several major crossings to navigate, such as the M42 motorway, the West Coast Main Line (WCML) and Pendigo Lake at the National Exhibition Centre (NEC) site.
The key design features of the APM Infrastructure include reinforced central concrete piers, weathered steel deck and escape walkway gratings throughout the entirety of the track. To minimise impact to the existing developed site and public roads, the entire 2.3km route is on an elevated viaduct. This is made up of a range of single and twin track at various points along the route to allow trains to pass each other.The piers range from 6 metres high to 14 metres, depending on the topography along the route. In order to maintain a consistent level for the viaduct, the columns will need to vary in height.
The stops at Birmingham Airport and at Interchange Station will have a single platform face and the intermediate stops at the NEC and Birmingham International Railway Station have two platform faces. The platforms vary from 36m to 40m long and all platforms are fully covered with canopies and have step free access.
The APM Infrastructure scope includes the detailed design and delivery of all piers, viaducts, APM stops, the APM maintenance facility as well as temporary works. The APM Infrastructure Contractor will be the Principal Contractor for the works and will be responsible for managing the APM Systems Contractor as well as nominated HS2 Contractors during these works. The APM Infrastructure Contractor will be responsible for managing all the interfaces and access for the works. Further details on interfacing contractors will be provided in the Tender documentation for the APM Infrastructure procurement.
Full CPV breakdown
- 45234000 — Construction work for railways and cable transport systems (primary)
Notice details
- Buyer type
- Local authority
- Contract type
- Works
- Main category
- Works
- Legal basis
- UKPGA 2023/54
- Notice status
- Planned
- Reserved / special regime
- Utilities
- Language
- EN
- Published
- 26 May 2026 12:34
- OCID
- ocds-h6vhtk-0519dd
- Notice ID
- _2978
Full notice record
34 detailsEverything the publisher included in this notice, organised by section.
Planning
| Document › Document type | Planned procurement notice |
| Document › Description | Pipeline notice on Find a Tender |
| Document › Link | https://www.find-tender.service.gov.uk/Notice/048677-2026 |
| Document › Published | 26 May 2026 |
Organisations
| Name | High Speed Two (HS2) Limited |
| Address › Street | Two Snowhill, Snow Hill Queensway |
| Address › Town / city | Birmingham |
| Address › Postcode | B4 6GA |
| Address › Country | GB |
| Address › Country | United Kingdom |
| Address › Region (NUTS) | UKG31 |
| Contact › Email | scc@hs2.org.uk |
| Role | buyer |
| Link | https://www.hs2.org.uk/ |
| Classification › Description | Public authority - sub-central government |
Buyer
| Name | High Speed Two (HS2) Limited |
Tender
| Title | Automated People Mover (APM) Infrastructure |
| Item › CPV › CPV 1 › Description | Construction work for railways and cable transport systems |
| Item › CPV › CPV 2 › Description | Construction work |
| Item › Delivery › Region (NUTS) | UK |
| Item › Delivery › Country | GB |
| Item › Delivery › Country | United Kingdom |
| Value › Value incl. VAT | £184,800,000 |
| Value › Value | £154,000,000 |
| Value › Currency | GBP |
| Category | works |
| Special regime | utilities |
| Lot › Suitable for › SMEs | Yes |
| Lot › Contract period › Start | 19 Apr 2029 |
| Lot › Contract period › End | 19 Jul 2033 |
| Lot › Status | planned |
| Communication › Expected publication | 5 May 2027 |
| Amendment › Description | Please note change to Tender Notice date and Contract Start date. |
| Status | planned |