Back to search
Contracts Finder
PIN
Planned
M48 SEVERN CROSSING RESURFACING EXPRESSION OF INTEREST
Published Today
6 Nov 2026
- Primary CPV
-
45233223 *
Carriageway resurfacing works
- Location
- 🇬🇧 South West
- Value
- £30,000,000
- Contract
-
5 months Duration
19/05/2027 20/10/2027
- Contract Types
-
45 *Construction workFull CPV Breakdown
- SME suitable
- Yes
Publisher Address
Suites 221 & 222 Innovation Centre, 99 Park Drive , Milton Park, Abingdon, OX14 4RY, England · South West
Contact
Award Criteria
Not specified
Reference: Amey / SBIM
• Application of the following mastic asphalt product: Permatrack Bridge Surfacing + 40% 4/10mm Agg (MA 10 10/20) with 6mm Pre-coated chippings 68PSV at a rate of spread of 6.0 to 7.5 kg/m2
• Application to achieve a mean thickness of an average of 35mm +/- 2mm locally
• Surfacing to achieve the following standard:
o Surface regularity taken on 75m lengths, the pavement surface shall be measured transversely for irregularities at 10m intervals by a 3m long straight-edge in accordance with BS8420 placed at right angles to the centre line of the road. The maximum allowable difference between the surface and the underside of the straight-edge, when placed parallel with, or at right angles to, the centre line of the road shall be 3mm. For each 75m lengths, maximum permitted number of surface irregularities shall be 9 and 1 for irregularity limits of 4mm and 7mm respectively.
o Initial texture depth: 1.5mm (minimum) to 2.0mm (maximum) for average per 1,000m or complete carriageway lane where this is less than 1,000m. Initial texture depth: Average for a set of 10mm measurement shall be 1.2mm minimum. Interval and frequency of macrotexture measurements: 10 per 200m. Texture depth shall be measured by 10 individual measurements taken at approximately 5 m spacing along a diagonal line across the lane width. Initial surface macrotexture for bituminous surface courses shall be measured using the volumetric patch method described in BS EN 13036-1.
Additional information: This is an expression of interest for planned works.
All values expressed are estimated for budget purposes.
Full CPV breakdown
- 45233223 — Carriageway resurfacing works (primary)
Notice details
- Competition
- Restricted / competitive (suppliers are shortlisted first)
- Minimum value
- £20,000,000
- Procurement method
- Competitive procedure with negotiation (above threshold)
- Notice status
- Planned
- Suitable for SMEs
- Yes
- Suitable for VCSEs
- No
- Language
- EN
- Published
- 06 Nov 2026 13:32
- OCID
- ocds-b5fd17-2b3adee9-a846-4bf3-a3a1-86361d92ab21
- Notice ID
- Amey / SBIM
Full notice record
33 detailsEverything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see
Planning
| Budget › Budget Breakdown › Contract period › Start | 1 Jan 2027 |
| Budget › Budget Breakdown › Contract period › End | 31 Dec 2027 |
| Budget › Budget Breakdown › Description | 2027/2027 |
| Budget › Budget Breakdown › Value › Value | £30,000,000 |
| Budget › Budget Breakdown › Value › Currency | GBP |
| Document › Document type | Planned procurement notice |
| Document › Description | Future opportunity notice on Contracts Finder |
| Document › Link | https://www.contractsfinder.service.gov.uk/Notice/41defe0c-7040-4e99-9... |
| Document › Published | 6 Nov 2026 |
Tender
| Title | M48 SEVERN CROSSING RESURFACING EXPRESSION OF INTEREST |
| Status | planned |
| CPV › Description | Carriageway resurfacing works |
| Item › Delivery › Region (NUTS) | South West |
| Item › Delivery › Country | United Kingdom |
| Minimum value › Value | £20,000,000 |
| Minimum value › Currency | GBP |
| Value › Value | £30,000,000 |
| Value › Currency | GBP |
| Procedure type | selective |
| Procedure | Competitive procedure with negotiation (above threshold) |
| Communication › Expected publication | 6 Nov 2026 |
| Contract period › Start | 19 May 2027 |
| Contract period › End | 20 Oct 2027 |
| Suitable for › SMEs | Yes |
| Suitable for › VCSEs | No |
Organisations
| Name | AMEY OW LIMITED |
| Identifier › Legal Name | AMEY OW LIMITED |
| Address › Street | Suites 221 & 222 Innovation Centre, 99 Park Drive , Milton Park |
| Address › Town / city | Abingdon |
| Address › Postcode | OX14 4RY |
| Address › Country | England |
| Role | buyer |
Buyer
| Name | AMEY OW LIMITED |