Updated hourly from UK government portals and TED (EU) WhatsApp contact@tendernotify.co.uk
Back to search Find a Tender
TENDER Framework Active Works

Open Framework Agreement for Housing Renewals & Adaptations

Published Yesterday
12 Nov 2026
Deadline in 17 days

Primary CPV
45000000 *
Construction work
Location
🇬🇧 Swansea, Wales
Value
£38,000,000
Contract
3 years Duration
01/02/2027 31/01/2030
Contract Types
45 *Construction work
Full CPV Breakdown
SME suitable
Not stated

Publisher Address

Civic Centre, Swansea, SA1 3SN, United Kingdom · UKL18

Contact

Award Criteria

  • Organisation and Support Structure (20%)
  • Compliance with Framework Call-off Arrangements (10%)
  • Local Sub-Contracting and Supplier arrangements (10%)
  • Health and Safety arrangements (20%)
  • Customer Care arrangements (20%)
  • Rview : Case Study Scheme Implementation (20%)
  • Interview : Case Study Scheme Implementation (20%)

Reference: CCS/25/366
Open Framework Agreement for Housing Renewals & Adaptations A1- Lot A1 : Medium sized internal Disabled Facilities Adaptations primarily bathroom conversions with associated minor builders work, typical individual project values £8,000 to £13,000, let individually by each Grant Applicant- Appoint 18 contractors unless fewer bids are received A2- Lot A2 : Medium sized External Disabled Facilities Adaptations primarily external steps , ramps and associated handrails and grab rails. Typical individual project values £3,500 to £10,000, let individually by each Grant Applicant. Appoint 5 contractors unless fewer bids are received Lot B : Disabled Facilities Adaptations, primarily large adaptations including extensions, structural alterations, attic conversions, ramps and external works; average project value £36,000, contract between grant applicant and contractor. Appoint 18 contractors unless fewer bids are received Lot C : C Housing Repair Loan works including repair or renewal of roof coverings, rendering, structural repairs, damp proofing, windows, doors and sundry repair works, maximum individual project value £35,000 let individually by each loan applicant. Appoint 3 contractors unless fewer bids are received

Full CPV breakdown

  • 45000000 — Construction work (primary)

Notice details

Buyer type
Local authority
Competition
Open competition (any supplier can bid)
Contract type
Works
Lots
4
Procurement method
Open procedure
Main category
Works
Above threshold
Yes
Legal basis
UKPGA 2023/54
Notice status
Active
Renewal
First Framework (Initial Term)-The First Framework will operate for an initial period of two (2) years (2027 to 2029) with an option to extend by one (1) year (to 2030). First Framework Reopening (Year 3) Upon expiry of the First Framework, the Open Framework scheme will be reopened to new and existing contractors through the publication of a new Tender Notice for the award of the Second Framework. Second Framework (Successor Term)- The Second Framework will operate for an initial period of two (2) years (2030 to 2032) with an option to extend by one (1) year (to 2033). Second Framework Reopening (Year 6)- Upon expiry of the Second Framework, the Open Framework scheme will be reopened to new and existing contractors through the publication of a new Tender Notice for the award of the Third Framework. Third Framework (Successor Term) The Third Framework will operate for an initial period of one (1) year (2033 to 2034) with an option to extend by one (1) year (to 2035).
Framework agreement
Yes
Framework details
Lot A1-Work will be allocated by the grant applicant’s agent, the Council, who has sole responsibility and discretion for determining the scope of work of individual projects and for assessing their value. The Council will allocate the work for Lot A1 on a rotational basis. Call off contracts are offered in strict rotation to framework contractors, a ‘Round’ is complete once each eligible Framework contractor has been offered a call off contract [whether or not they have accepted such offer]. Upon entry into this Framework Agreement, each Framework Contractor will be allocated a number from 1 to 18 for Lot A1 and in each case corresponding to their ranking following evaluation of their Framework Tender Submissions. The first Call-Off Contract will be offered to the first-placed Framework Contractor. At the time of the Call off Contract Framework Contractors can request an additional Call-off Contract (maximum Call-off Contracts of 2 per Round). Subsequent Call-Off Contracts will then be offered to the next highest placed Framework Contractor in accordance with the order of their ranking. Once a Call-Off Contract has been offered to the lowest placed Framework Contractor, a Round is complete and the process begins again with the next Call-Off Contract being offered to the first placed Framework Contractor, and so on. For the avoidance of doubt, if a Framework Contractor refuses or fails to accept the offer of a Call-Off Contract, the next Call-Off Contract in the current Round will be offered to the next Framework Contractor who has not yet been offered a Call-Off Contract in the current Round. A Framework Contractor which refuses or fails to accept an offer of a Call-Off Contract in the current round will not be offered another Call-Off Contract until the next Round. If a framework contractor refuses or fails to accept an offer on two separate occasions, then that Framework Contractor will be removed from the framework and will need to re-apply when the framework is re-opened annually for new bidder submissions. The Contractor is responsible for notifying the Council of any mitigating circumstances that may affect work allocations. Such circumstances will be reviewed by the Council and, where deemed valid, the Council may, at its discretion, revoke a strike on a one-off basis while the Contractor’s mitigating circumstances are being resolved. Where the Council considers it necessary, it also reserves the right to implement a temporary halt on call-off contract allocations during this period. Lot A2-Work will be allocated by the grant applicant’s agent, the Council, who has sole responsibility and discretion for determining the scope of work of individual projects and for assessing their value. The Council will allocate the work for Lot A2 on a rotational basis. Call off contracts are offered in strict rotation to framework contractors, a ‘Round’ is complete once each eligible Framework contractor has been offered a call off contract [whether or not they have accepted such offer]. Upon entry into this Framework Agreement, each Framework Contractor will be allocated a number from 1 to 5 for Lot 2 and in each case corresponding to their ranking following evaluation of their Framework Tender Submissions. The first Call-Off Contract will be offered to the first-placed Framework Contractor. At the time of the Call off Contract Framework Contractors can request an additional Call-off Contract (maximum Call-off Contracts of 2 per Round). Subsequent Call-Off Contracts will then be offered to the next highest placed Framework Contractor in accordance with the order of their ranking. Once a Call-Off Contract has been offered to the lowest placed Framework Contractor, a Round is complete and the process begins again with the next Call-Off Contract being offered to the first placed Framework Contractor, and so on. For the avoidance of doubt, if a Framework Contractor refuses or fails to accept the offer of a Call-Off Contract, the next Call-Off Contract in the current Round will be offered to the next Framework Contractor who has not yet been offered a Call-Off Contract in the current Round. A Framework Contractor which refuses or fails to accept an offer of a Call-Off Contract in the current round will not be offered another Call-Off Contract until the next Round. If a framework contractor refuses or fails to accept an offer on two separate occasions, then that Framework Contractor will be removed from the framework and will need to re-apply when the framework is re-opened annually for new bidder submissions. The Contractor is responsible for notifying the Council of any mitigating circumstances that may affect work allocations. Such circumstances will be reviewed by the Council and, where deemed valid, the Council may, at its discretion, revoke a strike on a one-off basis while the Contractor’s mitigating circumstances are being resolved. Where the Council considers it necessary, it also reserves the right to implement a temporary halt on call-off contract allocations during this period. Lob B-Work will be allocated by the grant applicant’s agent, the Council, who has sole responsibility and discretion for determining the scope of work of individual projects and for assessing their value. The Council will allocate the work for Lot B on a rotational basis. Call off contracts are offered in strict rotation to framework contractors, a ‘Round’ is complete once each eligible Framework contractor has been offered a call off contract [whether or not they have accepted such offer]. Upon entry into this Framework Agreement, each Framework Contractor will be allocated a number from 1 to 18 for Lot B and in each case corresponding to their ranking following evaluation of their Framework Tender Submissions. The first Call-Off Contract will be offered to the first-placed Framework Contractor. At the time of the Call off Contract Framework Contractors can request an additional Call-off Contract (maximum Call-off Contracts of 2 per Round). Subsequent Call-Off Contracts will then be offered to the next highest placed Framework Contractor in accordance with the order of their ranking. Once a Call-Off Contract has been offered to the lowest placed Framework Contractor, a Round is complete and the process begins again with the next Call-Off Contract being offered to the first placed Framework Contractor, and so on. For the avoidance of doubt, if a Framework Contractor refuses or fails to accept the offer of a Call-Off Contract, the next Call-Off Contract in the current Round will be offered to the next Framework Contractor who has not yet been offered a Call-Off Contract in the current Round. A Framework Contractor which refuses or fails to accept an offer of a Call-Off Contract in the current round will not be offered another Call-Off Contract until the next Round. If a framework contractor refuses or fails to accept an offer on two separate occasions, then that Framework Contractor will be removed from the framework and will need to re-apply when the framework is re-opened annually for new bidder submissions. The Contractor is responsible for notifying the Council of any mitigating circumstances that may affect work allocations. Such circumstances will be reviewed by the Council and, where deemed valid, the Council may, at its discretion, revoke a strike on a one-off basis while the Contractor’s mitigating circumstances are being resolved. Where the Council considers it necessary, it also reserves the right to implement a temporary halt on call-off contract allocations during this period. Lot C-Work will be allocated by the grant applicant’s agent, the Council, who has sole responsibility and discretion for determining the scope of work of individual projects and for assessing their value. The Council will allocate the work for Lot C on a rotational basis. Call off contracts are offered in strict rotation to framework contractors, a ‘Round’ is complete once each eligible Framework contractor has been offered a call off contract [whether or not they have accepted such offer]. Upon entry into this Framework Agreement, each Framework Contractor will be allocated a number from 1 to 3 for Lot C and in each case corresponding to their ranking following evaluation of their Framework Tender Submissions. The first Call-Off Contract will be offered to the first-placed Framework Contractor. At the time of the Call off Contract Framework Contractors can request an additional Call-off Contract (maximum Call-off Contracts of 2 per Round). Subsequent Call-Off Contracts will then be offered to the next highest placed Framework Contractor in accordance with the order of their ranking. Once a Call-Off Contract has been offered to the lowest placed Framework Contractor, a Round is complete and the process begins again with the next Call-Off Contract being offered to the first placed Framework Contractor, and so on. For the avoidance of doubt, if a Framework Contractor refuses or fails to accept the offer of a Call-Off Contract, the next Call-Off Contract in the current Round will be offered to the next Framework Contractor who has not yet been offered a Call-Off Contract in the current Round. A Framework Contractor which refuses or fails to accept an offer of a Call-Off Contract in the current round will not be offered another Call-Off Contract until the next Round. If a framework contractor refuses or fails to accept an offer on two separate occasions, then that Framework Contractor will be removed from the framework and will need to re-apply when the framework is re-opened annually for new bidder submissions. The Contractor is responsible for notifying the Council of any mitigating circumstances that may affect work allocations. Such circumstances will be reviewed by the Council and, where deemed valid, the Council may, at its discretion, revoke a strike on a one-off basis while the Contractor’s mitigating circumstances are being resolved.
Submission method
If you are interested in submitting a bid, please download the tender docs from https://etenderwales.bravosolution.co.uk/. Please search using ITT - 128239 . Register your company on the eTenderWales portal (this is only required once): — Navigate to the portal: — Click the “Suppliers register here” link. — Enter your correct business and user details. — Note the username you chose and click “Save” when complete. — You will shortly receive an e-mail with your unique password (please keep this secure). — Agree to the terms and conditions and click “continue”. 2. Express an interest in the project: — Login to the portal with your username/password. — Click the “ITTs Open to All Suppliers” link (these are the ITTs open to any registered supplier). — Click on the relevant ITT to access the content. — Click the “Express Interest” button in the “Actions” box on the left-hand side of the page. — This will move the ITT into your “My ITTs” page (this is a secure area reserved for your projects only). — Click on the ITT code. You can now access any attachments by clicking the “Settings and Buyer Attachments” in the “Actions” box. 3. Responding to the invitation to tender: — You can now choose to “Reply” or “Reject” (please give a reason if rejecting). — You can now use the “Messages” function to communicate with the buyer and seek any clarification. — Note the deadline for completion, then follow the onscreen instructions to complete the ITT. — There may be a mixture of online and offline actions for you to perform (there is detailed online help available). If you require any further assistance use the online help. Alternatively, the BravoSolution helpdesk can be contacted (Monday to Friday, 8:00 to 18:00) on: — E-mail: help@bravosolution.co.uk — Phone: +44 8003684850
Enquiries close
23 Nov 2026
Award decision expected
22 Jan 2027
Number of lots
4
Language
EN
Published
12 Nov 2026 09:43
Deadline
30 Nov 2026 12:00
OCID
ocds-h6vhtk-079643
Notice ID
CCS/25/366

Lots (4)

Lot A1: Lot A1 £14,400,000
Lot A1 : Medium sized internal Disabled Facilities Adaptations primarily bathroom conversions with associated minor builders work, typical individual project values £8,000 to £13,000, let individually by each Grant Applicant
1 Feb 2027 to 31 Jan 2030 · Active
Lot A2: Lot A2 £14,400,000
Lot A2 : Medium sized External Disabled Facilities Adaptations primarily external steps , ramps and associated handrails and grab rails. Typical individual project values £3,500 to £10,000, let individually by each Grant Applicant.
1 Feb 2027 to 31 Jan 2031 · Active
Lot B: Lot B £8,000,000
Lot B : Disabled Facilities Adaptations, primarily large adaptations including extensions, structural alterations, attic conversions, ramps and external works; average project value £36,000, contract between grant applicant and contractor
1 Feb 2027 to 31 Jan 2030 · Active
Lot C: LOT C £2,300,000
Lot C : C Housing Repair Loan works including repair or renewal of roof coverings, rendering, structural repairs, damp proofing, windows, doors and sundry repair works, maximum individual project value £35,000 let individually by each loan applicant.
1 Feb 2027 to 30 Jan 2030 · Active

Everything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see

Organisations

Name City & County of Swansea
Address › Street Civic Centre
Address › Town / city Swansea
Address › Postcode SA1 3SN
Address › Country GB
Address › Country United Kingdom
Address › Region (NUTS) UKL18
Role buyer
Link http://www.swansea.gov.uk/dobusiness
Classification › Classification 1 › Description Public authority - sub-central government
Classification › Classification 2 › Description Welsh devolved regulations apply

Buyer

Name City & County of Swansea

Planning

No Engagement Notice Rationale “As per section 17(1)(b) of the Procurement Act 2023, The Council has utilised its subject matter experts knowledge to identify the preferred and most relevant approach to the market given the requirements of this particular procurement activity.”

Tender

Title Open Framework Agreement for Housing Renewals & Adaptations
Status active
Item › Item 1 › CPV › Description Construction work
Item › Item 2 › CPV › Description Construction work
Item › Item 3 › CPV › Description Construction work
Item › Item 4 › CPV › Description Construction work
Value › Value incl. VAT £43,000,000
Value › Value £38,000,000
Value › Currency GBP
Procedure type open
Procedure Open procedure
Category works
Above threshold Yes
Techniques › Framework agreement Yes
Techniques › Framework agreement › Is Open Framework Scheme Yes
Techniques › Framework agreement › Maximum Participants 44
Techniques › Framework agreement › Method With and without reopening competition
Techniques › Framework agreement › Type closed
Techniques › Framework agreement › Open Framework Scheme End Date 31 Jan 2035
Submission Terms › Electronic submission allowed
Submission Terms › Languages › Language 1 cy
Submission Terms › Languages › Language 2 en
Bidding period › End 30 Nov 2026
Questions period › End 23 Nov 2026
Award decision period › End 22 Jan 2027
Lot › Lot 1 › Title Lot A1
Lot › Lot 1 › Description Lot A1 : Medium sized internal Disabled Facilities Adaptations primarily bathroom conversions with associated minor builders work, typical individual project values £8,000 to £13,000, let individually by each Grant Applicant
Lot › Lot 1 › Status active
Lot › Lot 1 › Value › Value incl. VAT £17,280,000
Lot › Lot 1 › Value › Value £14,400,000
Lot › Lot 1 › Value › Currency GBP
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Name Organisation and Support Structure
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 20
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Type quality
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Name Compliance with Framework Call-off Arrangements
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 10
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 1 › Award criteria › Criterion › Criterion 3 › Type quality
Lot › Lot 1 › Award criteria › Criterion › Criterion 3 › Name Local Sub-Contracting and Supplier arrangements
Lot › Lot 1 › Award criteria › Criterion › Criterion 3 › Weighting › Weight 10
Lot › Lot 1 › Award criteria › Criterion › Criterion 3 › Weighting › Weight type Percentage exact
Lot › Lot 1 › Award criteria › Criterion › Criterion 4 › Type quality
Lot › Lot 1 › Award criteria › Criterion › Criterion 4 › Name Health and Safety arrangements
Lot › Lot 1 › Award criteria › Criterion › Criterion 4 › Weighting › Weight 20
Lot › Lot 1 › Award criteria › Criterion › Criterion 4 › Weighting › Weight type Percentage exact
Lot › Lot 1 › Award criteria › Criterion › Criterion 5 › Type quality
Lot › Lot 1 › Award criteria › Criterion › Criterion 5 › Name Customer Care arrangements
Lot › Lot 1 › Award criteria › Criterion › Criterion 5 › Weighting › Weight 20
Lot › Lot 1 › Award criteria › Criterion › Criterion 5 › Weighting › Weight type Percentage exact
Lot › Lot 1 › Award criteria › Criterion › Criterion 6 › Type quality
Lot › Lot 1 › Award criteria › Criterion › Criterion 6 › Name rview : Case Study Scheme Implementation
Lot › Lot 1 › Award criteria › Criterion › Criterion 6 › Weighting › Weight 20
Lot › Lot 1 › Award criteria › Criterion › Criterion 6 › Weighting › Weight type Percentage exact
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 1 › Description see tender documentation
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 2 › Description see tender documentation
Lot › Lot 1 › Suitable for › SMEs Yes
Lot › Lot 1 › Suitable for › VCSEs Yes
Lot › Lot 1 › Contract period › Start 1 Feb 2027
Lot › Lot 1 › Contract period › End 31 Jan 2030
Lot › Lot 1 › Contract period › Can be extended to 30 Jan 2035
Lot › Lot 1 › Can be renewed Yes
Lot › Lot 2 › Title Lot A2
Lot › Lot 2 › Description Lot A2 : Medium sized External Disabled Facilities Adaptations primarily external steps , ramps and associated handrails and grab rails. Typical individual project values £3,500 to £10,000, let individually by each Grant Applicant.
Lot › Lot 2 › Status active
Lot › Lot 2 › Value › Value incl. VAT £17,280,000
Lot › Lot 2 › Value › Value £14,400,000
Lot › Lot 2 › Value › Currency GBP
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Name Organisation and Support Structure
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 20
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Type quality
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Name Compliance with Framework Call-off Arrangements
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 10
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 2 › Award criteria › Criterion › Criterion 3 › Type quality
Lot › Lot 2 › Award criteria › Criterion › Criterion 3 › Name Local Sub-Contracting and Supplier arrangements
Lot › Lot 2 › Award criteria › Criterion › Criterion 3 › Weighting › Weight 10
Lot › Lot 2 › Award criteria › Criterion › Criterion 3 › Weighting › Weight type Percentage exact
Lot › Lot 2 › Award criteria › Criterion › Criterion 4 › Type quality
Lot › Lot 2 › Award criteria › Criterion › Criterion 4 › Name Health and Safety arrangements
Lot › Lot 2 › Award criteria › Criterion › Criterion 4 › Weighting › Weight 20
Lot › Lot 2 › Award criteria › Criterion › Criterion 4 › Weighting › Weight type Percentage exact
Lot › Lot 2 › Award criteria › Criterion › Criterion 5 › Type quality
Lot › Lot 2 › Award criteria › Criterion › Criterion 5 › Name Customer Care arrangements
Lot › Lot 2 › Award criteria › Criterion › Criterion 5 › Weighting › Weight 20
Lot › Lot 2 › Award criteria › Criterion › Criterion 5 › Weighting › Weight type Percentage exact
Lot › Lot 2 › Award criteria › Criterion › Criterion 6 › Type quality
Lot › Lot 2 › Award criteria › Criterion › Criterion 6 › Name Interview : Case Study Scheme Implementation
Lot › Lot 2 › Award criteria › Criterion › Criterion 6 › Weighting › Weight 20
Lot › Lot 2 › Award criteria › Criterion › Criterion 6 › Weighting › Weight type Percentage exact
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 1 › Description see tender documents
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 2 › Description see tender documents
Lot › Lot 2 › Suitable for › SMEs Yes
Lot › Lot 2 › Suitable for › VCSEs Yes
Lot › Lot 2 › Contract period › Start 1 Feb 2027
Lot › Lot 2 › Contract period › End 31 Jan 2031
Lot › Lot 2 › Contract period › Can be extended to 30 Jan 2035
Lot › Lot 2 › Can be renewed Yes
Lot › Lot 3 › Title Lot B
Lot › Lot 3 › Description Lot B : Disabled Facilities Adaptations, primarily large adaptations including extensions, structural alterations, attic conversions, ramps and external works; average project value £36,000, contract between grant applicant and contractor
Lot › Lot 3 › Status active
Lot › Lot 3 › Value › Value incl. VAT £9,600,000
Lot › Lot 3 › Value › Value £8,000,000
Lot › Lot 3 › Value › Currency GBP
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Name Organisation and Support Structure
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 20
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Type quality
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Name Compliance with Framework Call-off Arrangements
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 10
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 3 › Award criteria › Criterion › Criterion 3 › Type quality
Lot › Lot 3 › Award criteria › Criterion › Criterion 3 › Name Local Sub-Contracting and Supplier arrangements
Lot › Lot 3 › Award criteria › Criterion › Criterion 3 › Weighting › Weight 10
Lot › Lot 3 › Award criteria › Criterion › Criterion 3 › Weighting › Weight type Percentage exact
Lot › Lot 3 › Award criteria › Criterion › Criterion 4 › Type quality
Lot › Lot 3 › Award criteria › Criterion › Criterion 4 › Name Health and Safety arrangements
Lot › Lot 3 › Award criteria › Criterion › Criterion 4 › Weighting › Weight 20
Lot › Lot 3 › Award criteria › Criterion › Criterion 4 › Weighting › Weight type Percentage exact
Lot › Lot 3 › Award criteria › Criterion › Criterion 5 › Type quality
Lot › Lot 3 › Award criteria › Criterion › Criterion 5 › Name Customer Care arrangements
Lot › Lot 3 › Award criteria › Criterion › Criterion 5 › Weighting › Weight 20
Lot › Lot 3 › Award criteria › Criterion › Criterion 5 › Weighting › Weight type Percentage exact
Lot › Lot 3 › Award criteria › Criterion › Criterion 6 › Type quality
Lot › Lot 3 › Award criteria › Criterion › Criterion 6 › Name Interview : Case Study Scheme Implementation
Lot › Lot 3 › Award criteria › Criterion › Criterion 6 › Weighting › Weight 20
Lot › Lot 3 › Award criteria › Criterion › Criterion 6 › Weighting › Weight type Percentage exact
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 1 › Description see tender documents
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 2 › Description see tender documents
Lot › Lot 3 › Suitable for › SMEs Yes
Lot › Lot 3 › Suitable for › VCSEs Yes
Lot › Lot 3 › Contract period › Start 1 Feb 2027
Lot › Lot 3 › Contract period › End 31 Jan 2030
Lot › Lot 3 › Contract period › Can be extended to 30 Jan 2035
Lot › Lot 3 › Can be renewed Yes
Lot › Lot 4 › Title LOT C
Lot › Lot 4 › Description Lot C : C Housing Repair Loan works including repair or renewal of roof coverings, rendering, structural repairs, damp proofing, windows, doors and sundry repair works, maximum individual project value £35,000 let individually by each loan applicant.
Lot › Lot 4 › Status active
Lot › Lot 4 › Value › Value incl. VAT £2,760,000
Lot › Lot 4 › Value › Value £2,300,000
Lot › Lot 4 › Value › Currency GBP
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Name Organisation and Support Structure
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 20
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Type quality
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Name Compliance with Framework Call-off Arrangements
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 10
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 4 › Award criteria › Criterion › Criterion 3 › Type quality
Lot › Lot 4 › Award criteria › Criterion › Criterion 3 › Name Local Sub-Contracting and Supplier arrangements
Lot › Lot 4 › Award criteria › Criterion › Criterion 3 › Weighting › Weight 10
Lot › Lot 4 › Award criteria › Criterion › Criterion 3 › Weighting › Weight type Percentage exact
Lot › Lot 4 › Award criteria › Criterion › Criterion 4 › Type quality
Lot › Lot 4 › Award criteria › Criterion › Criterion 4 › Name Health and Safety arrangements
Lot › Lot 4 › Award criteria › Criterion › Criterion 4 › Weighting › Weight 20
Lot › Lot 4 › Award criteria › Criterion › Criterion 4 › Weighting › Weight type Percentage exact
Lot › Lot 4 › Award criteria › Criterion › Criterion 5 › Type quality
Lot › Lot 4 › Award criteria › Criterion › Criterion 5 › Name Customer Care arrangements
Lot › Lot 4 › Award criteria › Criterion › Criterion 5 › Weighting › Weight 20
Lot › Lot 4 › Award criteria › Criterion › Criterion 5 › Weighting › Weight type Percentage exact
Lot › Lot 4 › Award criteria › Criterion › Criterion 6 › Type quality
Lot › Lot 4 › Award criteria › Criterion › Criterion 6 › Name Interview : Case Study Scheme Implementation
Lot › Lot 4 › Award criteria › Criterion › Criterion 6 › Weighting › Weight 20
Lot › Lot 4 › Award criteria › Criterion › Criterion 6 › Weighting › Weight type Percentage exact
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 1 › Description see tender documentation
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 2 › Description see tender documentation
Lot › Lot 4 › Suitable for › SMEs Yes
Lot › Lot 4 › Suitable for › VCSEs Yes
Lot › Lot 4 › Contract period › Start 1 Feb 2027
Lot › Lot 4 › Contract period › End 30 Jan 2030
Lot › Lot 4 › Contract period › Can be extended to 30 Jan 2035
Lot › Lot 4 › Can be renewed Yes
Document › Document 1 › Document type Bidding documents
Document › Document 1 › Link https://etenderwales.bravosolution.co.uk/
Document › Document 2 › Document type Conflict of interest
Document › Document 2 › Description Not published
Document › Document 3 › Document type Tender notice
Document › Document 3 › Description Tender notice on Find a Tender
Document › Document 3 › Link https://www.find-tender.service.gov.uk/Notice/107396-2026
Document › Document 3 › Published 12 Nov 2026
Has Recurrence Yes
Recurrence › Dates › Start 2 Jul 2030
Contract Terms › Financial Terms see tender documentation
Risk Details see tender documentation
Track this tender

Track this tender in your bid pipeline and set reminders.

See plans

Never miss a contract you could win

Search every UK public sector tender in one place, and get alerts the morning new ones appear.

Free to search No card needed Cancel any time
WhatsApp us