Back to search
Find a Tender
AWARD
Framework Complete
Autumn Response Teams Framework
Published 23 Nov 2026
23 Nov 2026
- Primary CPV
-
45234100 *
Railway construction works
- Location
- 🇬🇧 Lambeth, London
- Value
- £5,086,908
- Contract
-
3.3 years Duration
28/09/2026 30/12/2029
- Contract Types
-
45 *Construction workFull CPV Breakdown
- SME suitable
- Not stated
Publisher Address
Waterloo General Office, London, SE1 8SW, United Kingdom · UKI45
Contact
Award Criteria
Not specified
- Redacted signed contract · Contract Signed
- Conflict of Interest · Contract Signed
Related tenders
NETWORK RAIL INFRASTRUCTURE LIMITED
All notices from this publisher Same CPV code
45234100 *
All notices with this CPV code
Reference: itt_19580
Linked to - ocds-h6vhtk-069bb1 - System not allowing linking
Autumn Response Teams (ART) provide proactive and reactive mitigation to manage low adhesion risk, protect operational safety, and improve overall network performance. Autumn is historically one of the most challenging seasons for railway operations due to railhead contamination caused primarily by leaf fall. Compacted leaf matter significantly reduces wheel–rail adhesion, increasing the risk of Signals Passed at Danger (SPADs), station over-runs, braking performance issues, and consequential service disruption.
Awarded to
Full CPV breakdown
- 45234100 — Railway construction works (primary)
Notice details
- Buyer type
- Central government
- Competition
- Restricted / competitive (suppliers are shortlisted first)
- Contract type
- Works
- Winning supplier
- Large company
- Procurement method
- Competitive flexible procedure
- Main category
- Works
- Legal basis
- UKPGA 2023/54
- Notice status
- Complete
- Award status
- Active
- Framework agreement
- Yes
- Framework details
- Direct award to only supplier on the framework
- Reserved / special regime
- Utilities
- Language
- EN
- Published
- 23 Nov 2026 14:48
- OCID
- ocds-h6vhtk-06de1f
- Notice ID
- itt_19580
Organisations on this notice
Supplier Large
Whaley Road, South Yorkshire, S75 1HT, United Kingdom
es•••••
Upgrade to Pro to see
GB-PPON PWQM-8847-XRQG
Full notice record
57 detailsEverything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see
Organisations
| Party 1 › Name | NETWORK RAIL INFRASTRUCTURE LIMITED |
| Party 1 › Address › Street | Waterloo General Office |
| Party 1 › Address › Town / city | London |
| Party 1 › Address › Postcode | SE1 8SW |
| Party 1 › Address › Country | GB |
| Party 1 › Address › Country | United Kingdom |
| Party 1 › Address › Region (NUTS) | UKI45 |
| Party 1 › Role | buyer |
| Party 1 › Link | https://www.networkrail.co.uk/ |
| Party 1 › Classification › Description | Public authority - central government |
| Party 2 › Name | Amalgamated Construction Limited |
| Party 2 › Address › Street | Whaley Road |
| Party 2 › Address › Town / city | South Yorkshire |
| Party 2 › Address › Postcode | S75 1HT |
| Party 2 › Address › Country | GB |
| Party 2 › Address › Country | United Kingdom |
| Party 2 › Address › Region (NUTS) | UKE31 |
| Party 2 › Role | supplier |
| Party 2 › Business size | large |
| Party 2 › VCSEs | No |
Buyer
| Name | NETWORK RAIL INFRASTRUCTURE LIMITED |
Tender
| Title | Autumn Response Teams Framework |
| Description | Linked to - ocds-h6vhtk-069bb1 - System not allowing linking Autumn Response Teams (ART) provide proactive and reactive mitigation to manage low adhesion risk, protect operational safety, and improve overall network performance. Autumn is historically one of the most challenging seasons for railway operations due to railhead contamination caused primarily by leaf fall. Compacted leaf matter significantly reduces wheel–rail adhesion, increasing the risk of Signals Passed at Danger (SPADs), station over-runs, braking performance issues, and consequential service disruption. |
| Status | complete |
| Procedure type | selective |
| Procedure | Competitive flexible procedure |
| Special regime | utilities |
| Techniques › Framework agreement | Yes |
| Techniques › Framework agreement › Method | Without reopening competition |
| Techniques › Framework agreement › Type | closed |
| Techniques › Framework agreement › Description | Direct award to only supplier on the framework |
| Lot › Status | complete |
Awards
| Status | active |
| Category | works |
| Supplier › Name | Amalgamated Construction Limited |
| Item › CPV › Description | Railway construction works |
Contracts
| Status | active |
| Contract period › Start | 28 Sep 2026 |
| Contract period › End | 30 Dec 2029 |
| Contract period › Can be extended to | 30 Dec 2031 |
| Can be renewed | Yes |
| Renewal › Description | 1+1 years |
| Value › Value incl. VAT | £6,104,290 |
| Value › Value | £5,086,908 |
| Value › Currency | GBP |
| Above threshold | No |
| Signed | 21 Sep 2026 |
| Document › Document 1 › Document type | Contract signed |
| Document › Document 1 › Description | Redacted signed contract |
| Document › Document 1 › Link | https://www.find-tender.service.gov.uk/Notice/Attachment/A-25351 |
| Document › Document 2 › Document type | Contract signed |
| Document › Document 2 › Description | Conflict of Interest |
| Document › Document 2 › Link | https://www.find-tender.service.gov.uk/Notice/Attachment/A-25357 |
| Document › Document 3 › Document type | Contract notice |
| Document › Document 3 › Description | Contract details notice on Find a Tender |
| Document › Document 3 › Link | https://www.find-tender.service.gov.uk/Notice/110643-2026 |
| Document › Document 3 › Published | 23 Nov 2026 |