London Gateway - Second Rail Terminal Phase 2
Published 23 Nov 2026
23 Nov 2026
- Primary CPV
-
45234100 *
Railway construction works
- Location
- 🇬🇧 Thurrock, East of England
- Value
- £30,999,487
- Contract
-
1.3 years Duration
04/12/2026 19/03/2028
- Contract Types
-
45 *Construction workFull CPV Breakdown
- SME suitable
- Not stated
Publisher Address
16 Palace Street, London, SW1E 5JQ, United Kingdom · UKH32
Contact
Award Criteria
Not specified
Related tenders
LONDON GATEWAY PORT LIMITED
All notices from this publisher Same CPV code
45234100 *
All notices with this CPV code
Reference: GBLGP-MIS-2026-0043
Description
DP World is undertaking the expansion of its London Gateway Port facility at Stanford le
Hope, through the development of a new second rail terminal located to the west of the
existing eastern operational rail facility. This investment will significantly increase the
port's rail freight capacity, improve operational resilience, and support the continued
growth of DP Worlds sustainable, low carbon logistics solutions.
This expansion represents a strategic enhancement of the port's intermodal capability,
enabling faster, more efficient movement of goods across the UK and supporting national
objectives for greener freight transport. The new terminal will play a key role in
accommodating future demand and maintaining London Gateway's position as a world
class logistics and supply chain hub.
The Scope of Works covered under this tender include, but are not limited to, the following
key elements:
Permanent Way Works
Construction of new railway infrastructure to serve the second terminal including plain line
track, and associated components in a phase installation sequence delivering five new
sidings (7 to 11) to compliment the two sidings (12 and 13) already constructed during Phase 1/1A of the works, which are currently in operation. Installation and integration of
21 new switches and crossings (S&C) required to connect the new terminal to the existing
rail network corridor as well as providing more route paths for trains entering and exiting
the existing eastern rail terminal.
Civil Engineering Works
Installation of a circa 850m long reinforced concrete crane rail beam with pre-cast
concrete pile foundations and its associated mechanical chambers to allow Rail Mounted
Gantry Crane (RMGC) operations within the new terminal. Earthworks, formation
preparation, track drainage and utility diversions necessary to support the new terminal
infrastructure. Construction of numerous ancillary civils foundation bases, walkways,
cable routes and under track crossings for the new signalling, telecommunications and
electrical plant equipment, shunters cabin and REB building.
Telecommunications Works
Installation of new and relocation of existing Operational Telecoms and SiSS systems
assets including CCTV cameras, signal post and point zone telephones and the shunters
panel concentrator.
Signaling Works
Provision of new and relocation of existing signaling assets, including lineside equipment,
control system modifications in the form of new Shunters Cabin housing an updated
control panel to operate both rail terminals, and associated REB for the signaling system
interlocking. These assets will be constructed in a staged delivery to align with the
permanent way phasing, to ensure full operational compatibility. Installation of new
signaling track circuits to both the western and eastern terminals will enable operation of
both facilities from the one new control panel. Testing, commissioning and integration of
all new rail systems with existing operational infrastructure as well as update to the
Upminster IECC workstation screens.
Electrical and Plant Works
New power supplies to the various disciplines line side equipment, shunters cabin and
REB, as well as new points heating assets for both the western and existing eastern rail
terminal S&C units.
Interfaces and Integration
Management of all interfaces with existing rail infrastructure, port operations, utilities, and
third party stakeholders. Development of staging plans to minimise operational disruption
and ensure safe working adjacent to live rail and port environments. Coordination with existing port operations to ensure safe and continuous functionality during construction.
Project Goals
Upon completion, the new rail terminal will provide; increased rail served capacity for
containerised freight, enhanced operational flexibility and resilience, deliver infrastructure
capable of supporting robotic next generation RMGC equipment and improved efficiency
as well as reduce the ports carbon impact through expanded rail freight capability.
Awarded to
Full CPV breakdown
- 45234100 — Railway construction works (primary)
Notice details
- Buyer type
- Utility
- Competition
- Open competition (any supplier can bid)
- Contract type
- Works
- Winning supplier
- Large company
- Procurement method
- Competitive flexible procedure
- Main category
- Works
- Above threshold
- Yes
- Legal basis
- UKPGA 2023/54
- Notice status
- Complete
- Award status
- Pending
- Award date
- 23 Nov 2026
- Standstill period ends
- 3 Dec 2026
- Reserved / special regime
- Utilities
- Language
- EN
- Published
- 23 Nov 2026 15:14
- OCID
- ocds-h6vhtk-066c43
- Notice ID
- GBLGP-MIS-2026-0043
Organisations on this notice
Supplier Large
Sandall Lane, Kirk Sandall Industrial Estate, Doncaster, DN3 1LL, United Kingdom
ke•••••
Upgrade to Pro to see
GB-COH 01271067
Key dates
- Future Signature Date
- 4 Dec 2026 · Scheduled
Full notice record
53 detailsEverything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see
Organisations
| Party 1 › Name | LONDON GATEWAY PORT LIMITED |
| Party 1 › Address › Street | 16 Palace Street |
| Party 1 › Address › Town / city | London |
| Party 1 › Address › Postcode | SW1E 5JQ |
| Party 1 › Address › Country | GB |
| Party 1 › Address › Country | United Kingdom |
| Party 1 › Address › Region (NUTS) | UKI32 |
| Party 1 › Role | buyer |
| Party 1 › Classification › Description | Private utility |
| Party 2 › Name | TRACKWORK LIMITED |
| Party 2 › Address › Street | Sandall Lane, Kirk Sandall Industrial Estate |
| Party 2 › Address › Town / city | Doncaster |
| Party 2 › Address › Postcode | DN3 1LL |
| Party 2 › Address › Country | GB |
| Party 2 › Address › Country | United Kingdom |
| Party 2 › Address › Region (NUTS) | UKE31 |
| Party 2 › Role | supplier |
| Party 2 › Link | http://WWW.trackwork.co.uk |
| Party 2 › Business size | large |
| Party 2 › VCSEs | No |
| Party 2 › Public service mission organisation | No |
| Party 2 › Sheltered workshop | No |
Buyer
| Name | LONDON GATEWAY PORT LIMITED |
Tender
| Title | London Gateway - Second Rail Terminal Phase 2 |
| Status | complete |
| Procedure type | open |
| Procedure | Competitive flexible procedure |
| Special regime | utilities |
| Lot › Status | complete |
Awards
| Title | London Gateway - Second Rail Terminal Phase 2 |
| Status | pending |
| Date | 23 Nov 2026 |
| Value › Value incl. VAT | £37,199,384.40 |
| Value › Value | £30,999,487 |
| Value › Currency | GBP |
| Category | works |
| Above threshold | Yes |
| Supplier › Name | TRACKWORK LIMITED |
| Item › CPV › Description | Railway construction works |
| Item › Delivery › Region (NUTS) | UKH32 |
| Item › Delivery › Country | GB |
| Item › Delivery › Country | United Kingdom |
| Standstill period › End | 3 Dec 2026 |
| Contract period › Start | 4 Dec 2026 |
| Contract period › End | 19 Mar 2028 |
| Document › Document type | Award notice |
| Document › Description | Contract award notice on Find a Tender |
| Document › Link | https://www.find-tender.service.gov.uk/Notice/110675-2026 |
| Document › Published | 23 Nov 2026 |
| Assessment Summaries Date Sent | 23 Nov 2026 |
| Milestone › Type | Future signature date |
| Milestone › Due | 4 Dec 2026 |
| Milestone › Status | scheduled |