AWARD Complete

London Gateway - Second Rail Terminal Phase 2

Published 23 Nov 2026
23 Nov 2026


Reference: GBLGP-MIS-2026-0043
Description DP World is undertaking the expansion of its London Gateway Port facility at Stanford le Hope, through the development of a new second rail terminal located to the west of the existing eastern operational rail facility. This investment will significantly increase the port's rail freight capacity, improve operational resilience, and support the continued growth of DP Worlds sustainable, low carbon logistics solutions. This expansion represents a strategic enhancement of the port's intermodal capability, enabling faster, more efficient movement of goods across the UK and supporting national objectives for greener freight transport. The new terminal will play a key role in accommodating future demand and maintaining London Gateway's position as a world class logistics and supply chain hub. The Scope of Works covered under this tender include, but are not limited to, the following key elements: Permanent Way Works Construction of new railway infrastructure to serve the second terminal including plain line track, and associated components in a phase installation sequence delivering five new sidings (7 to 11) to compliment the two sidings (12 and 13) already constructed during Phase 1/1A of the works, which are currently in operation. Installation and integration of 21 new switches and crossings (S&C) required to connect the new terminal to the existing rail network corridor as well as providing more route paths for trains entering and exiting the existing eastern rail terminal. Civil Engineering Works Installation of a circa 850m long reinforced concrete crane rail beam with pre-cast concrete pile foundations and its associated mechanical chambers to allow Rail Mounted Gantry Crane (RMGC) operations within the new terminal. Earthworks, formation preparation, track drainage and utility diversions necessary to support the new terminal infrastructure. Construction of numerous ancillary civils foundation bases, walkways, cable routes and under track crossings for the new signalling, telecommunications and electrical plant equipment, shunters cabin and REB building. Telecommunications Works Installation of new and relocation of existing Operational Telecoms and SiSS systems assets including CCTV cameras, signal post and point zone telephones and the shunters panel concentrator. Signaling Works Provision of new and relocation of existing signaling assets, including lineside equipment, control system modifications in the form of new Shunters Cabin housing an updated control panel to operate both rail terminals, and associated REB for the signaling system interlocking. These assets will be constructed in a staged delivery to align with the permanent way phasing, to ensure full operational compatibility. Installation of new signaling track circuits to both the western and eastern terminals will enable operation of both facilities from the one new control panel. Testing, commissioning and integration of all new rail systems with existing operational infrastructure as well as update to the Upminster IECC workstation screens. Electrical and Plant Works New power supplies to the various disciplines line side equipment, shunters cabin and REB, as well as new points heating assets for both the western and existing eastern rail terminal S&C units. Interfaces and Integration Management of all interfaces with existing rail infrastructure, port operations, utilities, and third party stakeholders. Development of staging plans to minimise operational disruption and ensure safe working adjacent to live rail and port environments. Coordination with existing port operations to ensure safe and continuous functionality during construction. Project Goals Upon completion, the new rail terminal will provide; increased rail served capacity for containerised freight, enhanced operational flexibility and resilience, deliver infrastructure capable of supporting robotic next generation RMGC equipment and improved efficiency as well as reduce the ports carbon impact through expanded rail freight capability.

Full CPV breakdown

  • 45234100 — Railway construction works (primary)

Notice details

Buyer type
Utility
Competition
Open competition (any supplier can bid)
Contract type
Works
Winning supplier
Large company
Procurement method
Competitive flexible procedure
Main category
Works
Above threshold
Yes
Legal basis
UKPGA 2023/54
Notice status
Complete
Award status
Pending
Award date
23 Nov 2026
Standstill period ends
3 Dec 2026
Reserved / special regime
Utilities
Language
EN
Published
23 Nov 2026 15:14
OCID
ocds-h6vhtk-066c43
Notice ID
GBLGP-MIS-2026-0043

Organisations on this notice

Supplier Large
Sandall Lane, Kirk Sandall Industrial Estate, Doncaster, DN3 1LL, United Kingdom
ke••••• Upgrade to Pro to see
GB-COH 01271067

Key dates

Future Signature Date
4 Dec 2026 · Scheduled

Everything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see

Organisations

Party 1 › Name LONDON GATEWAY PORT LIMITED
Party 1 › Address › Street 16 Palace Street
Party 1 › Address › Town / city London
Party 1 › Address › Postcode SW1E 5JQ
Party 1 › Address › Country GB
Party 1 › Address › Country United Kingdom
Party 1 › Address › Region (NUTS) UKI32
Party 1 › Role buyer
Party 1 › Classification › Description Private utility
Party 2 › Name TRACKWORK LIMITED
Party 2 › Address › Street Sandall Lane, Kirk Sandall Industrial Estate
Party 2 › Address › Town / city Doncaster
Party 2 › Address › Postcode DN3 1LL
Party 2 › Address › Country GB
Party 2 › Address › Country United Kingdom
Party 2 › Address › Region (NUTS) UKE31
Party 2 › Role supplier
Party 2 › Link http://WWW.trackwork.co.uk
Party 2 › Business size large
Party 2 › VCSEs No
Party 2 › Public service mission organisation No
Party 2 › Sheltered workshop No

Buyer

Name LONDON GATEWAY PORT LIMITED

Tender

Title London Gateway - Second Rail Terminal Phase 2
Status complete
Procedure type open
Procedure Competitive flexible procedure
Special regime utilities
Lot › Status complete

Awards

Title London Gateway - Second Rail Terminal Phase 2
Status pending
Date 23 Nov 2026
Value › Value incl. VAT £37,199,384.40
Value › Value £30,999,487
Value › Currency GBP
Category works
Above threshold Yes
Supplier › Name TRACKWORK LIMITED
Item › CPV › Description Railway construction works
Item › Delivery › Region (NUTS) UKH32
Item › Delivery › Country GB
Item › Delivery › Country United Kingdom
Standstill period › End 3 Dec 2026
Contract period › Start 4 Dec 2026
Contract period › End 19 Mar 2028
Document › Document type Award notice
Document › Description Contract award notice on Find a Tender
Document › Link https://www.find-tender.service.gov.uk/Notice/110675-2026
Document › Published 23 Nov 2026
Assessment Summaries Date Sent 23 Nov 2026
Milestone › Type Future signature date
Milestone › Due 4 Dec 2026
Milestone › Status scheduled
Track this tender

Track this tender in your bid pipeline and set reminders.

See plans

Never miss a contract you could win

Search every UK public sector tender in one place, and get alerts the morning new ones appear.

Free to search No card needed Cancel any time
WhatsApp us