Back to search
Find a Tender
TENDER
Framework Active Services
Building Services Contractors Framework
Published 1 Apr 2026
1 Apr 2026
Closed 8 May 2026
- Primary CPV
-
50000000 *
Repair and maintenance services
- Location
- 🇬🇧 Inverness & Nairn and Moray, Badenoch & Strathspey, Scotland
- Value
- £15,000,000
- Contract
- Not specified
- Contract Types
-
50 *Repair & maintenance servicesFull CPV Breakdown
- SME suitable
- Not stated
Publisher Address
High Street, Elgin, IV30 1BX, United Kingdom · UKM62
Contact
Award Criteria
- Quality
- Price
Related tenders
Moray Council
All notices from this publisher Same CPV code
50000000 *
All notices with this CPV code
Reference: 18/1269
Moray Council Building Services wishes to put in place a Framework for a period of three years with a possible extension of 12 months, with suitably qualified and experienced Contractors. The Framework will provide professional trade services to assist with Reactive Repairs, Planned Maintenance and Labour Only and will be used to cover the entire Moray region to support the Authority’s owned housing stock of 6,492 properties. A limit of 20 contractors per lot will apply.
Full CPV breakdown
- 50000000 — Repair and maintenance services (primary)
Notice details
- Buyer type
- Local authority · General public services
- Competition
- Open competition (any supplier can bid)
- Contract type
- Services
- Lots
- 29
- Procurement method
- Open procedure
- Main category
- Services
- Legal basis
- CELEX 32014L0024
- Notice status
- Active
- Renewal
- Following expiry
- Framework agreement
- Yes
- Submission method
- http://www.publictendersscotland.publiccontractsscotland.gov.uk
- Award decision expected
- 8 May 2026
- Covered by GPA
- Yes
- Number of lots
- 29
- Language
- EN
- Published
- 01 Apr 2026 16:22
- Deadline
- 08 May 2026 12:00
- OCID
- ocds-h6vhtk-067b15
- Notice ID
- 18/1269
Organisations on this notice
Elgin Sheriff Court
Review Body
Sheriff Courthouse, High Street, Elgin, IV30 1BU, United Kingdom
+44 343542505
Lots (29)
Lot 1: Asbestos Surveying and Removal (HSE licenced)
Asbestos Surveying, testing and Removal (HSE Licenced and non licenced)
· Active
Lot 2: Blacksmith
Metal fabrication and repair of roller shutter doors
· Active
Lot 3: Builder/Mason
Builder is generally used to form the walls and other solid elements of buildings and structures and so on. It may be load bearing, forming an integral part of the structure, or non-load bearing, such as a partition wall or cladding etc.
· Active
Lot 4: Cleaning
Industrial (Commercial Buildings) - remove
Domestic (Residential, Voids, End of tenancy cleans)
Biohazard (contamination with biological fluids, needle sweeps)
Graffiti Removal (pressure washing, chemical removals)
· Active
Lot 5: Drainage & Water Services
Surveying, Camera Inspection and Jetting, Drainage Installation, maintenance and repairs, Septic Tank Emptying, Mains water connections and repairs
· Active
Lot 6: Electrical
Repair, maintenance, installation and certification of domestic, commercial and industrial electrical works complying with the current version of BS 7671
EICR reports and remedial works complying with the current version of BS 7671,Repair, maintenance, installation and certification of domestic firealarm systems compl...
· Active
Lot 7: Renewables
Installation, repairs, maintenance and servicing of Solar Panels
Battery backup and invertors
Thermal Panels
Solar Water Heating
PV
Heating Control Systems
SMART Heating Controls
Wind Generation
· Active
Lot 8: Fire Alarms/Equipment
Install, service & maintenance of Fire alarms, Intruder alarms, Access control and CCTV systems.
· Active
Lot 9: Groundworks
Excavation, Earthworks, Drainage,. Hard Landscaping, Fencing (timber and metal), Tarring and re-surfacing, Landscaping (grass cutting, pruning) Demolition
· Active
Lot 10: Joiner
Joinery and Locksmiths
· Active
Lot 11: Mechanical and Electrical Services
Ventilation Systems (inc dust extraction)
Heat Recovery Systems
Sprinkler Systems
· Active
Lot 12: Heating
Gas Heating - Repairs and servicing of all types of gas boilers and appliances
Gas Heating - Full heating installations
Oil Heating - Repairs and servicing of all types of oil heating systems
Solid Fuel Heating - Repairs and servicing of all types of soild fuel heating systems
Multi-Fuel Stoves - Repairs, servicing and...
· Active
Lot 13: Painting & Decorating
All painting works to include but not limited to the preparation of surfaces, all decoration works including painting/taping/papering/tiling/damp and mould treatments, external painting.
· Active
Lot 14: Pest Control
Control of unwanted creatures, such as, rats, ants, bedbugs, and termites from homes, buildings, and surrounding areas. They typically inspect buildings for signs of pests, determine the treatment needed
· Active
Lot 15: Plastering
Plastering only
· Active
Lot 16: Plumbing
Installation, refurbishment, maintenance/repair of all systems of pipes, tanks, fittings, and other apparatus required for the water supply, drainage, heating, and sanitation in domestic properties
· Active
Lot 17: Removal & Storage
Removal and Storage, House clearances, Garden Clearances
· Active
Lot 18: Roofing
Cleaning and Treatment (inc gutter cleaning and replacement)
Flat Roofing (various roof coatings)
Tiling
Slating
Cladding (profile sheeting)
Gutter Cleaning and Moss Removal
Emergency response (flooding)
· Active
Lot 19: Fittings and Fixures
Floor coverings (carpets and vinyl)
Curtains & Blinds
· Active
Lot 20: Damp, mould and preservation treatment
Damp, mould and rot surveying
Damp, mould and rot remedial works and reinstatement
Damp and mould installation (PIV)
· Active
Lot 21: External Wall Finishes
Roughcasting (wet, dry and rendering), external wall insulation
· Active
Lot 22: Scaffolding
Erection of a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings and structures. Scaffolds are widely used on site to get access to heights and areas that would be otherwise hard to get to.
· Active
Lot 23: Signage
Maintenance, supply and erection
· Active
Lot 24: Specialist Trades
Automated Doors and Entry Systems (Domestic)
Doors (Industrial & Roller)
TV, Aerial and Satellite (supply and repair)
Data cabling (supply and repair)
Chimney sweeps and solid fuel maintenance
EPC Surveying
· Active
Lot 25: Workshop Machinery
Repair and servicing of workshop machinery, LEV maintenance
· Active
Lot 26: Windows and Doors
Replacement Glazing - Measure and replace broken single, double and triple glazed units in various locations, types, and finishes to meet current regulations
Replacement Windows (timber/UPVC) - Measure, supply, and fit replacement windows to match existing, with full internal and external finishes
Replacement external...
· Active
Lot 27: Multi-Trade
Including but not limited to Builder, Electrician, Plumbers, Painter, Joiner, Landscaping and heating (gas, solid fuel, electric and renewables). Examples would be kitchen and bathroom upgrades, major disabled adaptations, whole house refurbishment
· Active
Lot 28: Labour Only
Labour only - Contractors may be required to support our ‘in house’ Building Services ’ team during peak periods where key trade (e.g. Joiner, Plumber, Electrician, Painter, Slater) support is required to deliver planned/cyclical maintenance.
· Active
Lot 29: Gull Control
Licensed Contractor - all proactive Gull Control Activity Preventative Measures. Supply, installation and maintenance of sonic scarer devices. Lasers deterrents, debris, nest and egg removal and dead bird removal
· Active
Full notice record
500 detailsEverything the publisher included in this notice, organised by section.
Tender
| Title | Building Services Contractors Framework |
| Status | active |
| CPV › Description | Repair and maintenance services |
| Category | services |
| Description | Moray Council Building Services wishes to put in place a Framework for a period of three years with a possible extension of 12 months, with suitably qualified and experienced Contractors. The Framework will provide professional trade services to assist with Reactive Repairs, Planned Maintenance and Labour Only and will be used to cover the entire Moray region to support the Authority’s owned housing stock of 6,492 properties. A limit of 20 contractors per lot will apply. |
| Value › Value | £15,000,000 |
| Value › Currency | GBP |
| Lot Details › Maximum Lots Bid Per Supplier | 29 |
| Lot › Lot 1 › Title | Asbestos Surveying and Removal (HSE licenced) |
| Lot › Lot 1 › Description | Asbestos Surveying, testing and Removal (HSE Licenced and non licenced) |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 1 › Contract period › Duration In Days | 1440 |
| Lot › Lot 1 › Can be renewed | Yes |
| Lot › Lot 1 › Renewal › Description | Following expiry |
| Lot › Lot 1 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 1 › Has options | No |
| Lot › Lot 1 › Status | active |
| Lot › Lot 2 › Title | Blacksmith |
| Lot › Lot 2 › Description | Metal fabrication and repair of roller shutter doors |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 2 › Contract period › Duration In Days | 1440 |
| Lot › Lot 2 › Can be renewed | Yes |
| Lot › Lot 2 › Renewal › Description | Following expiry |
| Lot › Lot 2 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 2 › Has options | No |
| Lot › Lot 2 › Status | active |
| Lot › Lot 3 › Title | Builder/Mason |
| Lot › Lot 3 › Description | Builder is generally used to form the walls and other solid elements of buildings and structures and so on. It may be load bearing, forming an integral part of the structure, or non-load bearing, such as a partition wall or cladding etc. |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 3 › Contract period › Duration In Days | 1440 |
| Lot › Lot 3 › Can be renewed | Yes |
| Lot › Lot 3 › Renewal › Description | Following expiry |
| Lot › Lot 3 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 3 › Has options | No |
| Lot › Lot 3 › Status | active |
| Lot › Lot 4 › Title | Cleaning |
| Lot › Lot 4 › Description | Industrial (Commercial Buildings) - remove Domestic (Residential, Voids, End of tenancy cleans) Biohazard (contamination with biological fluids, needle sweeps) Graffiti Removal (pressure washing, chemical removals) |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 4 › Contract period › Duration In Days | 1440 |
| Lot › Lot 4 › Can be renewed | Yes |
| Lot › Lot 4 › Renewal › Description | Following expiry |
| Lot › Lot 4 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 4 › Has options | No |
| Lot › Lot 4 › Status | active |
| Lot › Lot 5 › Title | Drainage & Water Services |
| Lot › Lot 5 › Description | Surveying, Camera Inspection and Jetting, Drainage Installation, maintenance and repairs, Septic Tank Emptying, Mains water connections and repairs |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 5 › Contract period › Duration In Days | 1440 |
| Lot › Lot 5 › Can be renewed | Yes |
| Lot › Lot 5 › Renewal › Description | Following expiry |
| Lot › Lot 5 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 5 › Has options | No |
| Lot › Lot 5 › Status | active |
| Lot › Lot 6 › Title | Electrical |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 6 › Contract period › Duration In Days | 1440 |
| Lot › Lot 6 › Can be renewed | Yes |
| Lot › Lot 6 › Renewal › Description | Following expiry |
| Lot › Lot 6 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 6 › Has options | No |
| Lot › Lot 6 › Status | active |
| Lot › Lot 7 › Title | Renewables |
| Lot › Lot 7 › Description | Installation, repairs, maintenance and servicing of Solar Panels Battery backup and invertors Thermal Panels Solar Water Heating PV Heating Control Systems SMART Heating Controls Wind Generation |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 7 › Contract period › Duration In Days | 1440 |
| Lot › Lot 7 › Can be renewed | Yes |
| Lot › Lot 7 › Renewal › Description | Following expiry |
| Lot › Lot 7 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 7 › Has options | No |
| Lot › Lot 7 › Status | active |
| Lot › Lot 8 › Title | Fire Alarms/Equipment |
| Lot › Lot 8 › Description | Install, service & maintenance of Fire alarms, Intruder alarms, Access control and CCTV systems. |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 8 › Contract period › Duration In Days | 1440 |
| Lot › Lot 8 › Can be renewed | Yes |
| Lot › Lot 8 › Renewal › Description | Following expiry |
| Lot › Lot 8 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 8 › Has options | No |
| Lot › Lot 8 › Status | active |
| Lot › Lot 9 › Title | Groundworks |
| Lot › Lot 9 › Description | Excavation, Earthworks, Drainage,. Hard Landscaping, Fencing (timber and metal), Tarring and re-surfacing, Landscaping (grass cutting, pruning) Demolition |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 9 › Contract period › Duration In Days | 1440 |
| Lot › Lot 9 › Can be renewed | Yes |
| Lot › Lot 9 › Renewal › Description | Following expiry |
| Lot › Lot 9 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 9 › Has options | No |
| Lot › Lot 9 › Status | active |
| Lot › Lot 10 › Title | Joiner |
| Lot › Lot 10 › Description | Joinery and Locksmiths |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 10 › Contract period › Duration In Days | 1440 |
| Lot › Lot 10 › Can be renewed | Yes |
| Lot › Lot 10 › Renewal › Description | Following expiry |
| Lot › Lot 10 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 10 › Has options | No |
| Lot › Lot 10 › Status | active |
| Lot › Lot 11 › Title | Mechanical and Electrical Services |
| Lot › Lot 11 › Description | Ventilation Systems (inc dust extraction) Heat Recovery Systems Sprinkler Systems |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 11 › Contract period › Duration In Days | 1440 |
| Lot › Lot 11 › Can be renewed | Yes |
| Lot › Lot 11 › Renewal › Description | Following expiry |
| Lot › Lot 11 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 11 › Has options | No |
| Lot › Lot 11 › Status | active |
| Lot › Lot 12 › Title | Heating |
| Lot › Lot 12 › Description | Gas Heating - Repairs and servicing of all types of gas boilers and appliances Gas Heating - Full heating installations Oil Heating - Repairs and servicing of all types of oil heating systems Solid Fuel Heating - Repairs and servicing of all types of soild fuel heating systems Multi-Fuel Stoves - Repairs, servicing and installation of multi-fuel stoves, flues and all other stove maintenance requirements. |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 12 › Contract period › Duration In Days | 1440 |
| Lot › Lot 12 › Can be renewed | Yes |
| Lot › Lot 12 › Renewal › Description | Following expiry |
| Lot › Lot 12 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 12 › Has options | No |
| Lot › Lot 12 › Status | active |
| Lot › Lot 13 › Title | Painting & Decorating |
| Lot › Lot 13 › Description | All painting works to include but not limited to the preparation of surfaces, all decoration works including painting/taping/papering/tiling/damp and mould treatments, external painting. |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 13 › Contract period › Duration In Days | 1440 |
| Lot › Lot 13 › Can be renewed | Yes |
| Lot › Lot 13 › Renewal › Description | Following expiry |
| Lot › Lot 13 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 13 › Has options | No |
| Lot › Lot 13 › Status | active |
| Lot › Lot 14 › Title | Pest Control |
| Lot › Lot 14 › Description | Control of unwanted creatures, such as, rats, ants, bedbugs, and termites from homes, buildings, and surrounding areas. They typically inspect buildings for signs of pests, determine the treatment needed |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 14 › Contract period › Duration In Days | 1440 |
| Lot › Lot 14 › Can be renewed | Yes |
| Lot › Lot 14 › Renewal › Description | Following expiry |
| Lot › Lot 14 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 14 › Has options | No |
| Lot › Lot 14 › Status | active |
| Lot › Lot 15 › Title | Plastering |
| Lot › Lot 15 › Description | Plastering only |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 15 › Contract period › Duration In Days | 1440 |
| Lot › Lot 15 › Can be renewed | Yes |
| Lot › Lot 15 › Renewal › Description | Following expiry |
| Lot › Lot 15 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 15 › Has options | No |
| Lot › Lot 15 › Status | active |
| Lot › Lot 16 › Title | Plumbing |
| Lot › Lot 16 › Description | Installation, refurbishment, maintenance/repair of all systems of pipes, tanks, fittings, and other apparatus required for the water supply, drainage, heating, and sanitation in domestic properties |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 16 › Contract period › Duration In Days | 1440 |
| Lot › Lot 16 › Can be renewed | Yes |
| Lot › Lot 16 › Renewal › Description | Following expiry |
| Lot › Lot 16 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 16 › Has options | No |
| Lot › Lot 16 › Status | active |
| Lot › Lot 17 › Title | Removal & Storage |
| Lot › Lot 17 › Description | Removal and Storage, House clearances, Garden Clearances |
| Lot › Lot 17 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 17 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 17 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 17 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 17 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 17 › Contract period › Duration In Days | 1440 |
| Lot › Lot 17 › Can be renewed | Yes |
| Lot › Lot 17 › Renewal › Description | Following expiry |
| Lot › Lot 17 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 17 › Has options | No |
| Lot › Lot 17 › Status | active |
| Lot › Lot 18 › Title | Roofing |
| Lot › Lot 18 › Description | Cleaning and Treatment (inc gutter cleaning and replacement) Flat Roofing (various roof coatings) Tiling Slating Cladding (profile sheeting) Gutter Cleaning and Moss Removal Emergency response (flooding) |
| Lot › Lot 18 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 18 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 18 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 18 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 18 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 18 › Contract period › Duration In Days | 1440 |
| Lot › Lot 18 › Can be renewed | Yes |
| Lot › Lot 18 › Renewal › Description | Following expiry |
| Lot › Lot 18 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 18 › Has options | No |
| Lot › Lot 18 › Status | active |
| Lot › Lot 19 › Title | Fittings and Fixures |
| Lot › Lot 19 › Description | Floor coverings (carpets and vinyl) Curtains & Blinds |
| Lot › Lot 19 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 19 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 19 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 19 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 19 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 19 › Contract period › Duration In Days | 1440 |
| Lot › Lot 19 › Can be renewed | Yes |
| Lot › Lot 19 › Renewal › Description | Following expiry |
| Lot › Lot 19 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 19 › Has options | No |
| Lot › Lot 19 › Status | active |
| Lot › Lot 20 › Title | Damp, mould and preservation treatment |
| Lot › Lot 20 › Description | Damp, mould and rot surveying Damp, mould and rot remedial works and reinstatement Damp and mould installation (PIV) |
| Lot › Lot 20 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 20 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 20 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 20 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 20 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 20 › Contract period › Duration In Days | 1440 |
| Lot › Lot 20 › Can be renewed | Yes |
| Lot › Lot 20 › Renewal › Description | Following expiry |
| Lot › Lot 20 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 20 › Has options | No |
| Lot › Lot 20 › Status | active |
| Lot › Lot 21 › Title | External Wall Finishes |
| Lot › Lot 21 › Description | Roughcasting (wet, dry and rendering), external wall insulation |
| Lot › Lot 21 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 21 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 21 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 21 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 21 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 21 › Contract period › Duration In Days | 1440 |
| Lot › Lot 21 › Can be renewed | Yes |
| Lot › Lot 21 › Renewal › Description | Following expiry |
| Lot › Lot 21 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 21 › Has options | No |
| Lot › Lot 21 › Status | active |
| Lot › Lot 22 › Title | Scaffolding |
| Lot › Lot 22 › Description | Erection of a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings and structures. Scaffolds are widely used on site to get access to heights and areas that would be otherwise hard to get to. |
| Lot › Lot 22 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 22 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 22 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 22 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 22 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 22 › Contract period › Duration In Days | 1440 |
| Lot › Lot 22 › Can be renewed | Yes |
| Lot › Lot 22 › Renewal › Description | Following expiry |
| Lot › Lot 22 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 22 › Has options | No |
| Lot › Lot 22 › Status | active |
| Lot › Lot 23 › Title | Signage |
| Lot › Lot 23 › Description | Maintenance, supply and erection |
| Lot › Lot 23 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 23 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 23 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 23 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 23 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 23 › Contract period › Duration In Days | 1440 |
| Lot › Lot 23 › Can be renewed | Yes |
| Lot › Lot 23 › Renewal › Description | Following expiry |
| Lot › Lot 23 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 23 › Has options | No |
| Lot › Lot 23 › Status | active |
| Lot › Lot 24 › Title | Specialist Trades |
| Lot › Lot 24 › Description | Automated Doors and Entry Systems (Domestic) Doors (Industrial & Roller) TV, Aerial and Satellite (supply and repair) Data cabling (supply and repair) Chimney sweeps and solid fuel maintenance EPC Surveying |
| Lot › Lot 24 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 24 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 24 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 24 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 24 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 24 › Contract period › Duration In Days | 1440 |
| Lot › Lot 24 › Can be renewed | Yes |
| Lot › Lot 24 › Renewal › Description | Following expiry |
| Lot › Lot 24 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 24 › Has options | No |
| Lot › Lot 24 › Status | active |
| Lot › Lot 25 › Title | Workshop Machinery |
| Lot › Lot 25 › Description | Repair and servicing of workshop machinery, LEV maintenance |
| Lot › Lot 25 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 25 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 25 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 25 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 25 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 25 › Contract period › Duration In Days | 1440 |
| Lot › Lot 25 › Can be renewed | Yes |
| Lot › Lot 25 › Renewal › Description | Following expiry |
| Lot › Lot 25 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 25 › Has options | No |
| Lot › Lot 25 › Status | active |
| Lot › Lot 26 › Title | Windows and Doors |
| Lot › Lot 26 › Description | Replacement Glazing - Measure and replace broken single, double and triple glazed units in various locations, types, and finishes to meet current regulations Replacement Windows (timber/UPVC) - Measure, supply, and fit replacement windows to match existing, with full internal and external finishes Replacement external door sets - Measure, supply, and fit replacement UPVC and composite door sets to match existing, including all side lights, fan lights and all internal and external finishing's |
| Lot › Lot 26 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 26 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 26 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 26 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 26 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 26 › Contract period › Duration In Days | 1440 |
| Lot › Lot 26 › Can be renewed | Yes |
| Lot › Lot 26 › Renewal › Description | Following expiry |
| Lot › Lot 26 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 26 › Has options | No |
| Lot › Lot 26 › Status | active |
| Lot › Lot 27 › Title | Multi-Trade |
| Lot › Lot 27 › Description | Including but not limited to Builder, Electrician, Plumbers, Painter, Joiner, Landscaping and heating (gas, solid fuel, electric and renewables). Examples would be kitchen and bathroom upgrades, major disabled adaptations, whole house refurbishment |
| Lot › Lot 27 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 27 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 27 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 27 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 27 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 27 › Contract period › Duration In Days | 1440 |
| Lot › Lot 27 › Can be renewed | Yes |
| Lot › Lot 27 › Renewal › Description | Following expiry |
| Lot › Lot 27 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 27 › Has options | No |
| Lot › Lot 27 › Status | active |
| Lot › Lot 28 › Title | Labour Only |
| Lot › Lot 28 › Description | Labour only - Contractors may be required to support our ‘in house’ Building Services ’ team during peak periods where key trade (e.g. Joiner, Plumber, Electrician, Painter, Slater) support is required to deliver planned/cyclical maintenance. |
| Lot › Lot 28 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 28 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 28 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 28 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 28 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 28 › Contract period › Duration In Days | 1440 |
| Lot › Lot 28 › Can be renewed | Yes |
| Lot › Lot 28 › Renewal › Description | Following expiry |
| Lot › Lot 28 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 28 › Has options | No |
| Lot › Lot 28 › Status | active |
| Lot › Lot 29 › Title | Gull Control |
| Lot › Lot 29 › Description | Licensed Contractor - all proactive Gull Control Activity Preventative Measures. Supply, installation and maintenance of sonic scarer devices. Lasers deterrents, debris, nest and egg removal and dead bird removal |
| Lot › Lot 29 › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Lot 29 › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Lot 29 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 29 › Award criteria › Criterion › Criterion 2 › Type | price |
| Lot › Lot 29 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 29 › Contract period › Duration In Days | 1440 |
| Lot › Lot 29 › Can be renewed | Yes |
| Lot › Lot 29 › Renewal › Description | After expiry |
| Lot › Lot 29 › Submission Terms › Variant Policy | Not allowed |
| Lot › Lot 29 › Has options | No |
| Lot › Lot 29 › Status | active |
| Item › Item 1 › CPV › CPV 1 › Description | Asbestos-removal work |
| Item › Item 1 › CPV › CPV 2 › Description | Asbestos removal services |
| Item › Item 1 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 1 › Delivery Location › Description | Moray wide. |
| Item › Item 2 › CPV › Description | Blacksmith services |
| Item › Item 2 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 2 › Delivery Location › Description | Moray wide. |
| Item › Item 3 › CPV › CPV 1 › Description | Builders' joinery |
| Item › Item 3 › CPV › CPV 2 › Description | Builders' carpentry |
| Item › Item 3 › CPV › CPV 3 › Description | Masonry work |
| Item › Item 3 › CPV › CPV 4 › Description | Masonry and bricklaying work |
| Item › Item 3 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 3 › Delivery Location › Description | Moray Wide. |
| Item › Item 4 › CPV › CPV 1 › Description | Exterior cleaning work for buildings |
| Item › Item 4 › CPV › CPV 2 › Description | Cleaning and sanitation services |
| Item › Item 4 › CPV › CPV 3 › Description | Cleaning services |
| Item › Item 4 › CPV › CPV 4 › Description | Accommodation, building and window cleaning services |
| Item › Item 4 › CPV › CPV 5 › Description | Accommodation cleaning services |
| Item › Item 4 › CPV › CPV 6 › Description | Building-cleaning services |
| Item › Item 4 › CPV › CPV 7 › Description | Office cleaning services |
| Item › Item 4 › CPV › CPV 8 › Description | School cleaning services |
| Item › Item 4 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 4 › Delivery Location › Description | Moray Wide. |
| Item › Item 5 › CPV › CPV 1 › Description | Ground-drainage work |
| Item › Item 5 › CPV › CPV 2 › Description | Drainage system |
| Item › Item 5 › CPV › CPV 3 › Description | Drainage works |
| Item › Item 5 › CPV › CPV 4 › Description | Drainage and surface works |
| Item › Item 5 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 5 › Delivery Location › Description | Moray Wide. |
| Item › Item 6 › CPV › CPV 1 › Description | Electrical installation work |
| Item › Item 6 › CPV › CPV 2 › Description | Electrical wiring and fitting work |
| Item › Item 6 › CPV › CPV 3 › Description | Electrical wiring work |
| Item › Item 6 › CPV › CPV 4 › Description | Electrical fitting work |
| Item › Item 6 › CPV › CPV 5 › Description | Electrical installation work of heating and other electrical building-equipment |
| Item › Item 6 › CPV › CPV 6 › Description | Electrical engineering installation works |
| Item › Item 6 › CPV › CPV 7 › Description | Other electrical installation work |
| Item › Item 6 › CPV › CPV 8 › Description | Electrical-system repair services |
| Item › Item 6 › CPV › CPV 9 › Description | Repair and maintenance services of electrical machinery, apparatus and associated equipment |
| Item › Item 6 › CPV › CPV 10 › Description | Repair and maintenance services of electrical and mechanical building installations |
| Item › Item 6 › CPV › CPV 11 › Description | Repair and maintenance services of electrical building installations |
| Item › Item 6 › CPV › CPV 12 › Description | Electrical services |
| Item › Item 6 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 6 › Delivery Location › Description | Moray Wide. |
| Item › Item 7 › CPV › CPV 1 › Description | Solar panel roof-covering work |
| Item › Item 7 › CPV › CPV 2 › Description | Thermal insulation work |
| Item › Item 7 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 7 › Delivery Location › Description | Moray Wide. |
| Item › Item 8 › CPV › CPV 1 › Description | Burglar and fire alarms |
| Item › Item 8 › CPV › CPV 2 › Description | Fire-alarm systems |
| Item › Item 8 › CPV › CPV 3 › Description | Fire-alarm system installation work |
| Item › Item 8 › CPV › CPV 4 › Description | Firefighting equipment installation work |
| Item › Item 8 › CPV › CPV 5 › Description | Fire-extinguishers installation work |
| Item › Item 8 › CPV › CPV 6 › Description | CO2 fire-extinguishing equipment installation work |
| Item › Item 8 › CPV › CPV 7 › Description | Repair and maintenance services of firefighting equipment |
| Item › Item 8 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 8 › Delivery Location › Description | Moray Wide. |
| Item › Item 9 › CPV › CPV 1 › Description | Resurfacing works |
| Item › Item 9 › CPV › CPV 2 › Description | Landscaping work |
| Item › Item 9 › CPV › CPV 3 › Description | Drainage works |
| Item › Item 9 › CPV › CPV 4 › Description | Demolition work |
| Item › Item 9 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 9 › Delivery Location › Description | Moray Wide. |
| Item › Item 10 › CPV › CPV 1 › Description | Joinery work |
| Item › Item 10 › CPV › CPV 2 › Description | Locksmith services |
| Item › Item 10 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 10 › Delivery Location › Description | Moray Wide. |
| Item › Item 11 › CPV › CPV 1 › Description | Installation work of refrigeration equipment |
| Item › Item 11 › CPV › CPV 2 › Description | Ventilation installation work |
| Item › Item 11 › CPV › CPV 3 › Description | Solid fuels |
| Item › Item 11 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 11 › Delivery Location › Description | Moray Wide. |
| Item › Item 12 › CPV › Description | Heating works |
| Item › Item 12 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 13 › CPV › CPV 1 › Description | Painting work |
| Item › Item 13 › CPV › CPV 2 › Description | Painting work of buildings |
| Item › Item 13 › CPV › CPV 3 › Description | Repainting work |
| Item › Item 13 › CPV › CPV 4 › Description | Painting work of structures |
| Item › Item 13 › CPV › CPV 5 › Description | Painting and protective-coating work of structures |
| Item › Item 13 › CPV › CPV 6 › Description | Interior decorating services |
| Item › Item 13 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 13 › Delivery Location › Description | Moray Wide. |
| Item › Item 14 › CPV › Description | Pest-control services |
| Item › Item 14 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 14 › Delivery Location › Description | Moray Wide. |
| Item › Item 15 › CPV › CPV 1 › Description | Plastering work |
| Item › Item 15 › CPV › CPV 2 › Description | Tiling work |
| Item › Item 15 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 15 › Delivery Location › Description | Moray Wide. |
| Item › Item 16 › CPV › CPV 1 › Description | Plumbing and sanitary works |
| Item › Item 16 › CPV › CPV 2 › Description | Plumbing and drain-laying work |
| Item › Item 16 › CPV › CPV 3 › Description | Water plumbing work |
| Item › Item 16 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 16 › Delivery Location › Description | Moray Wide. |
| Item › Item 17 › CPV › Description | Storage services |
| Item › Item 17 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 17 › Delivery Location › Description | Moray Wide. |
| Item › Item 18 › CPV › CPV 1 › Description | Roofing materials |
| Item › Item 18 › CPV › CPV 2 › Description | Roof |
| Item › Item 18 › CPV › CPV 3 › Description | Roof works and other special trade construction works |
| Item › Item 18 › CPV › CPV 4 › Description | Roof-covering and roof-painting work |
| Item › Item 18 › CPV › CPV 5 › Description | Roof-tiling work |
| Item › Item 18 › CPV › CPV 6 › Description | Roof-slating work |
| Item › Item 18 › CPV › CPV 7 › Description | Roof-covering work |
| Item › Item 18 › CPV › CPV 8 › Description | Metal roof-covering work |
| Item › Item 18 › CPV › CPV 9 › Description | Roof insulation work |
| Item › Item 18 › CPV › CPV 10 › Description | Roof repair and maintenance work |
| Item › Item 18 › CPV › CPV 11 › Description | Roof repair |
| Item › Item 18 › CPV › CPV 12 › Description | Roof maintenance work |
| Item › Item 18 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 18 › Delivery Location › Description | Moray Wide. |
| Item › Item 19 › CPV › CPV 1 › Description | Carpeting |
| Item › Item 19 › CPV › CPV 2 › Description | Curtains, drapes, valances and textile blinds |
| Item › Item 19 › Delivery › Region (NUTS) | UKM62 |
| Item › Item 19 › Delivery Location › Description | Moray Wide. |
| Item › Item 20 › CPV › Description | Repair and maintenance services |
| Item › Item 20 › Delivery › Region (NUTS) | UKM62 |