Back to search
Find a Tender
AWARD
Framework Complete Works
London Construction Programme General Works Framework MW25-GW
Published 19 Mar 2026
19 Mar 2026
- Primary CPV
-
45000000 *
Construction work
- Location
- 🇬🇧 North East
- Value
- £3,000,000,000
- Contract
- Not specified
- Contract Types
-
45 *Construction workFull CPV Breakdown
- SME suitable
- Not stated
Publisher Address
7th Floor Alexandra House, 10 Station Road, Wood Green, London, N227TR, United Kingdom · UKC
Contact
Award Criteria
- Price
- Quality
Related tenders
London Borough of Haringey
All notices from this publisher Same CPV code
45000000 *
All notices with this CPV code
Reference: MW25-GW
The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multiple types of buildings including individual, multiple occupancy, residential, commercial, heritage, community and those operated by the public sector on a 24 hour basis (i.e. police, health, fire and rescue, care homes etc.). The scope of the works will include (but not limited to), new buildings, MMC, planned and preventative maintenance, refurbishment, retrofit, fire safety works, heritage related works, remediations, mechanical and engineering services, renewable energy systems and adaptations.
The Framework will be established for a period of 5 years and will be available to any public sector body in London and the Home Counties. It is anticipated the framework will commence in September 2025.
The London Construction Programme was established in 2012 by Haringey Council was, encouraged and supported by other London Local Authorities through London Councils, to develop a pan-London strategy to improve construction related procurement and establish a suite of collaborative contractual vehicles which public sector organisations can utilise. The LCP currently has a total membership of over 60 Public Sector organisations in London and Home County. The LCP is a 'virtual organisation' currently hosted and operated by Haringey Council.
The current LCP Framework (MW19) expired in October 2024. This new Framework is to provide General Works construction and General Works construction related activities for new build developments, building related planned component replacement, fire safety, remediations, retrofit and refurbishments according to the Lot Categories.
The services will be procured in 16 lots:
Lot GN1 New Build up to £7.5m contract value
Lot GN2 New Build £6m - £15m contract value
Lot GN3 New Build £14m+ contract value
Lot GNPS New Build £1+ (i.e.no minimum contract value)
Lot GF1 Fire Safety Works up to £7.5m contract value
Lot GF2 Fire Safety Works £6m - £15m contract value
Lot GF3 Fire Safety Works £14m+ contract value
Lot GFPS Fire Safety Works £1+ (i.e.no minimum contract value)
Lot GR1 Refurbishment and Retrofit up to £7.5m contract value
Lot GR2 Refurbishment and Retrofit £6m - £15m contract value
Lot GR3 Refurbishment and Retrofit £14m+ contract value
Lot GRPS Refurbishment and Retrofit £1+ (i.e.no minimum contract value)
Lot GP1 Planned Preventative Maintenance up to £7.5m contract value
Lot GP2 Planned Preventative Maintenance £6m - £15m contract value
Lot GP3 Planned Preventative Maintenance £14m+ contract value
Lot GPPS Planned Preventative Maintenance £1+ (i.e.no minimum contract value)
Tenderers are restricted to applying for a maximum of two sub lots, plus the PS sub lot in each of the primary Lots (i.e. New Build, Fire Safety Works, refurbishment and retrofit, Planned Preventative Maintenance).
There are reserved places for micro and small enterprises on different Lots in order to encourage SMEs and provide choice for its Clients.
A Reserve List will also be used for this framework for those Tenderers who are unsuccessful in being awarded a place on the primary Lots.
The framework will be established with four main objectives in mind:-
1. To support its Clients to deliver on their net zero commitments in the following areas:-
• Biodiversity assets
• Climate Change adaptation
• Zero Carbon Supply Chain
• Low Carbon Transportation
• Operational Low Carbon
2. To provide a fast and efficient route to market for education schemes across London and the Home Counties that offers value for money.
3. To drive positive changes in mental health and equality, diversity and inclusion in the construction sector.
4. To apply best practice, unlock innovation and work collaboratively with its Client and the Supply Chain.
Awarded to
Advanced Interior Solutions Ltd.
Alcema Ltd
Arte Construction Limited
Axis Europe
Ark Build PLC
BOOM CONSTRUCTION LIMITED
Built Fitout and Refurbishment Limited
CITYAXIS LIMITED
CURO CONSTRUCTION LIMITED
Devcon Limited
E&C CONSTRUCTION LTD
Ensigna Construction Ltd
Equans Regeneration Ltd
Ermine Construction Services Ltd
Etec Contract Services Ltd
FORMATION DESIGN & BUILD LIMITED
Galliford Try Construction Limited
Glenman Corporation Ltd
Guildmore Limited
Highview Group Ltd
Indecon Building Limited
Isoler Limted
J Murphy and Sons Limited
John Graham Construction Ltd
JOHNSONS 1871 LIMITED
Kind & Company (Builders ltd)
Kirkman & Jourdain Ltd
Landmark Facades Ltd
LIFE Build Solutions Limited
MCLAREN CONSTRUCTION LIMITED
MP Building Ltd
Neilcott Construction Limited
RAAM Construction Ltd
Reds10 (UK) Ltd
ROOFF CONSTRUCTION LTD
SKAFFTEC LTD T/A R&B REFURBISHMENT
Spacemaker Developments ltd
Surecast Limited
T & B (CONTRACTORS) LIMITED
THOMAS SINDEN LIMITED
Vallectric Ltd
Vision Built Structures Ltd
WOODNUT CONSTRUCTION & DEVELOPMENTS LTD
ZED PODS LIMITED
Full CPV breakdown
- 45000000 — Construction work (primary)
Notice details
- Buyer type
- Local authority · General public services
- Competition
- Open competition (any supplier can bid)
- Contract type
- Works
- Bids received
- 2,904
- Winning supplier
- SME
- Lots
- 16
- Procurement method
- Open procedure
- Main category
- Works
- Legal basis
- CELEX 32014L0024
- Notice status
- Complete
- Award status
- Active
- Options
- Initial contract is for a period of 60 months
- Number of lots
- 16
- Language
- EN
- Published
- 19 Mar 2026 09:28
- OCID
- ocds-h6vhtk-04e6d8
- Notice ID
- MW25-GW
Competition
2,904
Bids received
Organisations on this notice
Supplier SME
St. Paul's House 10 Warwick Lane, London, United Kingdom
GB-COH 1431977
Supplier SME
No. 7A The Courtyard Furlong Rd Bourne End SL8 5AU, Bourne End, United Kingdom
GB-COH 10063038
Supplier SME
34-35 Berwick Street Soho, London, United Kingdom
GB-COH 12262724
Supplier SME
Tramway House 3 Tramway Avenue, Stratford, United Kingdom
GB-COH 1991637
Supplier SME
Langston Road, Loughton, United Kingdom
GB-COH 3864842
Boom Construction Limited
Supplier SME
Rose Farm Chiswell Green Lane, St. Albans, United Kingdom
GB-COH 7989022
Supplier SME
Level 4 1 Berry Street, London, United Kingdom
GB-COH 11645768
CityAxis Limited
Supplier SME
346 Kensington High Street, London, United Kingdom
GB-COH 2748683
Curo Construction Limited
Supplier Large
3-4 New Street EC2M 4TP, London, United Kingdom
GB-COH 8807474
Supplier SME
6 Minster Court Tuscam Way, Cambeley, United Kingdom
GB-COH 8621605
Supplier SME
Unit 1E Barking Business Centre Thames Road, Barking, United Kingdom
GB-COH 8841731
Ensigna Construction ltd
Supplier SME
37-39b Freelands Road, Bromley, United Kingdom
GB-COH 5771179
Supplier Large
Titan Court 3 Bishops Square Hatfield Hertfordshire, Hertfordshire, United Kingdom
GB-COH 1738371
Ermine Construction Services Ltd.
Supplier SME
Unit 4 St. Georges Tower Hatley St. George, Sandy, United Kingdom
GB-COH 9534978
ETEC CONTRACT SERVICES LTD
Supplier SME
Suite 7, Elmhurst, 98-106 High Road South Woodford, London, United Kingdom
GB-COH 5392794
Formation Design & Build Limited
Supplier Large
Unit 1 38 Wembley Hill Road, Wembley, United Kingdom
GB-COH 3536763
Supplier Large
Wonersh House The Guildway, Old Portsmouth Road, Surrey, United Kingdom
GB-COH 02472080
Supplier SME
8 Power Road Chiswick, London, United Kingdom
GB-COH 05385076
Supplier Large
Ertosun House 61 Widmore Road, Bromley, United Kingdom
GB-COH 3517348
Highview Group LTD
Supplier SME
Quay House Battlesbridge Harbour Chelmsford Road, Wickford, United Kingdom
GB-COH 10349320
Supplier SME
South Hanningfield Road, Wickford, United Kingdom
GB-COH 1414461
Supplier SME
Unit 1 North Point Belmont Industrial Estate, Durham, United Kingdom
GB-COH 2766783
Supplier SME
Hiview House Highgate Road, London, United Kingdom
GB-COH 492042
Supplier SME
5 Ballygowan Road, Hillsborough, United Kingdom
GB-COH NI003503
Johnsons 1871 Limited
Supplier SME
King Edward Court King Edward Road, Knutsford, United Kingdom
GB-COH 02372641
Supplier SME
Bridge House 530 High Road, Leytonstone, United Kingdom
GB-COH 00387371
Kirkman and Jourdain Ltd
Supplier SME
150 Brooker Road Waltham Abbey, Essex, United Kingdom
GB-COH 1766240
Supplier Large
6 Wharf Studios 28, Wharf Road, London, United Kingdom
GB-COH 11894523
Supplier Large
40 Oxford Road High Wycombe, Buckinghamshire, United Kingdom
GB-COH 05372315
McLaren Construction Limited
Supplier Large
11th Floor 20 Churchill Place, London, United Kingdom
GB-COH 05377750
Supplier SME
2 Shaftsbury Centre Icknield Way, Letchworth, United Kingdom
GB-COH 05166608
Supplier Large
Excel House Cray Avenue, Orpington, United Kingdom
GB-COH 01151561
Supplier SME
Unit 8 Peerglow Estate Queensway, London, United Kingdom
GB-COH 05934914
Supplier Large
129-131 Metal Box Factory 30 Great Guildford street, London, United Kingdom
GB-COH 05934862
ROOFF CONSTRUCTION LTD
Supplier SME
The Granary 80 Abbey Road, Barking, United Kingdom
GB-COH 13135401
Supplier SME
4 Abbey Trading Estate Bell Green Lane, London, United Kingdom
GB-COH 04428308
Spacemaker Developments ltd
Supplier SME
Suite 1 Xenus House Sandpiper Court, Eaton Socon, United Kingdom
GB-COH 10859210
Supplier SME
Second Floor Suite 10 Regent Gate High Street, Waltham Cross, United Kingdom
GB-COH 0388026 1
T&B Contractors Limited
Supplier SME
Riverside House Place Farm Wheathampstead, Herts, United Kingdom
GB-COH 1667869
Thomas Sinden Limited
Supplier SME
137-145 Church Road Harold Wood, Essex, United Kingdom
GB-COH 03308698
Lots (16)
Lot GN1
Lot GN1 New Build up to £7.5m contract value
· Cancelled
Lot GN2
GN2 (New Build £6m to £15m)
· Cancelled
Lot GN3
GN3 (New Build £14m and above)
· Cancelled
Lot GNPS
GNPS (New Build £1 and above)
· Cancelled
Lot GF1
GF1 (Fire Safety Works up to £7.5million)
· Cancelled
Lot GF2
GF2 (Fire Safety Works £6m to £15m)
· Cancelled
Lot GF3
Initial contract is for a period of 60 months
· Cancelled
Lot GFPS
GFPS (Fire Safety Works £1 and above)
· Cancelled
Lot GR1
GR1 (Refurbishment and Retrofit up to £7.5million)
· Cancelled
Lot GR2
GR2 (Refurbishment and Retrofit £6m to £15m)
· Cancelled
Lot GR3
GR3 (Refurbishment and Retrofit £14m and above
· Cancelled
Lot GRPS
GRPS (Refurbishment and Retrofit £1 and above)
· Cancelled
Lot GP1
GP1 (Planned Preventative Maintenance up to £7.5million)
· Cancelled
Lot GP2
GP2 (Planned Preventative Maintenance £6m to £15m)
· Cancelled
Lot GP3
GP3 (Planned Preventative Maintenance £14m and above)
· Cancelled
Lot GPPS
GPPS (Planned Preventative Maintenance £1 and above)
· Cancelled
Full notice record
497 detailsEverything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see
Tender
| Title | London Construction Programme General Works Framework MW25-GW |
| Status | complete |
| CPV › Description | Construction work |
| Category | works |
| Lot › Lot 1 › Description | Lot GN1 New Build up to £7.5m contract value |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 1 › Has options | Yes |
| Lot › Lot 1 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 1 › Status | cancelled |
| Lot › Lot 2 › Description | GN2 (New Build £6m to £15m) |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 2 › Has options | Yes |
| Lot › Lot 2 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 2 › Status | cancelled |
| Lot › Lot 3 › Description | GN3 (New Build £14m and above) |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 3 › Has options | Yes |
| Lot › Lot 3 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 3 › Status | cancelled |
| Lot › Lot 4 › Description | GNPS (New Build £1 and above) |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 4 › Has options | Yes |
| Lot › Lot 4 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 4 › Status | cancelled |
| Lot › Lot 5 › Description | GF1 (Fire Safety Works up to £7.5million) |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Description | 70 |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 5 › Has options | Yes |
| Lot › Lot 5 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 5 › Status | cancelled |
| Lot › Lot 6 › Description | GF2 (Fire Safety Works £6m to £15m) |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 6 › Has options | Yes |
| Lot › Lot 6 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 6 › Status | cancelled |
| Lot › Lot 7 › Description | Initial contract is for a period of 60 months |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 7 › Has options | Yes |
| Lot › Lot 7 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 7 › Status | cancelled |
| Lot › Lot 8 › Description | GFPS (Fire Safety Works £1 and above) |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 8 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 8 › Has options | Yes |
| Lot › Lot 8 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 8 › Status | cancelled |
| Lot › Lot 9 › Description | GR1 (Refurbishment and Retrofit up to £7.5million) |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 9 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 9 › Has options | Yes |
| Lot › Lot 9 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 9 › Status | cancelled |
| Lot › Lot 10 › Description | GR2 (Refurbishment and Retrofit £6m to £15m) |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 10 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 10 › Has options | Yes |
| Lot › Lot 10 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 10 › Status | cancelled |
| Lot › Lot 11 › Description | GR3 (Refurbishment and Retrofit £14m and above |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 11 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 11 › Has options | Yes |
| Lot › Lot 11 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 11 › Status | cancelled |
| Lot › Lot 12 › Description | GRPS (Refurbishment and Retrofit £1 and above) |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 12 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 12 › Has options | Yes |
| Lot › Lot 12 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 12 › Status | cancelled |
| Lot › Lot 13 › Description | GP1 (Planned Preventative Maintenance up to £7.5million) |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 13 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 13 › Has options | Yes |
| Lot › Lot 13 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 13 › Status | cancelled |
| Lot › Lot 14 › Description | GP2 (Planned Preventative Maintenance £6m to £15m) |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 14 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 14 › Has options | Yes |
| Lot › Lot 14 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 14 › Status | cancelled |
| Lot › Lot 15 › Description | GP3 (Planned Preventative Maintenance £14m and above) |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 15 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 15 › Has options | Yes |
| Lot › Lot 15 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 15 › Status | cancelled |
| Lot › Lot 16 › Description | GPPS (Planned Preventative Maintenance £1 and above) |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 1 › Name | Price |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 1 › Type | cost |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 1 › Description | 30 |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 2 › Name | Quality |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Lot 16 › Award criteria › Criterion › Criterion 2 › Description | 70 |
| Lot › Lot 16 › Has options | Yes |
| Lot › Lot 16 › Options › Description | Initial contract is for a period of 60 months |
| Lot › Lot 16 › Status | cancelled |
| Item › Item 1 › CPV › Description | Construction work |
| Item › Item 1 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 1 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 1 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 1 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 1 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 1 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 1 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 1 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 1 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 2 › CPV › Description | Construction work |
| Item › Item 2 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 2 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 2 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 2 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 2 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 2 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 2 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 2 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 2 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 3 › CPV › Description | Construction work |
| Item › Item 3 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 3 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 3 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 3 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 3 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 3 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 3 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 3 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 3 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 4 › CPV › Description | Construction work |
| Item › Item 4 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 4 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 4 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 4 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 4 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 4 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 4 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 4 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 4 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 5 › CPV › Description | Construction work |
| Item › Item 5 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 5 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 5 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 5 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 5 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 5 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 5 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 5 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 5 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 6 › CPV › Description | Construction work |
| Item › Item 6 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 6 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 6 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 6 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 6 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 6 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 6 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 6 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 6 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 7 › CPV › Description | Construction work |
| Item › Item 7 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 7 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 7 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 7 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 7 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 7 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 7 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 7 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 7 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 8 › CPV › Description | Construction work |
| Item › Item 8 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 8 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 8 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 8 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 8 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 8 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 8 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 8 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 8 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 9 › CPV › Description | Construction work |
| Item › Item 9 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 9 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 9 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 9 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 9 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 9 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 9 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 9 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 9 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 10 › CPV › Description | Construction work |
| Item › Item 10 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 10 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 10 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 10 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 10 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 10 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 10 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 10 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 10 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 11 › CPV › Description | Construction work |
| Item › Item 11 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 11 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 11 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 11 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 11 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 11 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 11 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 11 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 11 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 12 › CPV › Description | Construction work |
| Item › Item 12 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 12 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 12 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 12 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 12 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 12 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 12 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 12 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 12 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 13 › CPV › Description | Construction work |
| Item › Item 13 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 13 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 13 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 13 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 13 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 13 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 13 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 13 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 13 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 14 › CPV › Description | Construction work |
| Item › Item 14 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 14 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 14 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 14 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 14 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 14 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 14 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 14 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 14 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 15 › CPV › Description | Construction work |
| Item › Item 15 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 15 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 15 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 15 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 15 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 15 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 15 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 15 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 15 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Item › Item 16 › CPV › Description | Construction work |
| Item › Item 16 › Delivery › Delivery 1 › Region (NUTS) | UKC |
| Item › Item 16 › Delivery › Delivery 2 › Region (NUTS) | UKD |
| Item › Item 16 › Delivery › Delivery 3 › Region (NUTS) | UKE |
| Item › Item 16 › Delivery › Delivery 4 › Region (NUTS) | UKF |
| Item › Item 16 › Delivery › Delivery 5 › Region (NUTS) | UKG |
| Item › Item 16 › Delivery › Delivery 6 › Region (NUTS) | UKH |
| Item › Item 16 › Delivery › Delivery 7 › Region (NUTS) | UKI |
| Item › Item 16 › Delivery › Delivery 8 › Region (NUTS) | UKJ |
| Item › Item 16 › Delivery › Delivery 9 › Region (NUTS) | UKK |
| Procedure type | open |
| Procedure | Open procedure |
Awards
| Award 1 › Status | active |
| Award 1 › Supplier › Name | Advanced Interior Solutions Ltd. |
| Award 2 › Status | active |
| Award 2 › Supplier › Name | Alcema Ltd |
| Award 3 › Status | active |
| Award 3 › Supplier › Name | Arte Construction Limited |
| Award 4 › Status | active |
| Award 4 › Supplier › Name | Axis Europe |
| Award 5 › Status | active |
| Award 5 › Supplier › Name | Ark Build PLC |
| Award 6 › Status | active |
| Award 6 › Supplier › Name | Boom Construction Limited |
| Award 7 › Status | active |
| Award 7 › Supplier › Name | Built Fitout and Refurbishment Limited |
| Award 8 › Status | active |
| Award 8 › Supplier › Name | CityAxis Limited |
| Award 9 › Status | active |
| Award 9 › Supplier › Name | Curo Construction Limited |
| Award 10 › Status | active |
| Award 10 › Supplier › Name | Devcon Limited |
| Award 11 › Status | active |
| Award 11 › Supplier › Name | E&C CONSTRUCTION LTD |
| Award 12 › Status | active |
| Award 12 › Supplier › Name | Ensigna Construction ltd |
| Award 13 › Status | active |
| Award 13 › Supplier › Name | Equans Regeneration Ltd |
| Award 14 › Status | active |
| Award 14 › Supplier › Name | Ermine Construction Services Ltd. |
| Award 15 › Status | active |
| Award 15 › Supplier › Name | ETEC CONTRACT SERVICES LTD |
| Award 16 › Status | active |
| Award 16 › Supplier › Name | Formation Design & Build Limited |
| Award 17 › Status | active |
| Award 17 › Supplier › Name | Galliford Try Construction Limited |
| Award 18 › Status | active |
| Award 18 › Supplier › Name | Glenman Corporation Ltd |
| Award 19 › Status | active |
| Award 19 › Supplier › Name | Guildmore Limited |
| Award 20 › Status | active |
| Award 20 › Supplier › Name | Highview Group LTD |
| Award 21 › Status | active |
| Award 21 › Supplier › Name | Indecon Building Limited |
| Award 22 › Status | active |
| Award 22 › Supplier › Name | Isoler Limted |
| Award 23 › Status | active |
| Award 23 › Supplier › Name | J Murphy and Sons Limited |
| Award 24 › Status | active |
| Award 24 › Supplier › Name | John Graham Construction Ltd |
| Award 25 › Status | active |
| Award 25 › Supplier › Name | Johnsons 1871 Limited |
| Award 26 › Status | active |
| Award 26 › Supplier › Name | Kind & Company (Builders ltd) |
| Award 27 › Status | active |
| Award 27 › Supplier › Name | Kirkman and Jourdain Ltd |
| Award 28 › Status | active |
| Award 28 › Supplier › Name | Landmark Facades Ltd |
| Award 29 › Status | active |
| Award 29 › Supplier › Name | LIFE Build Solutions Limited |
| Award 30 › Status | active |
| Award 30 › Supplier › Name | McLaren Construction Limited |
| Award 31 › Status | active |
| Award 31 › Supplier › Name | MP Building Ltd |
| Award 32 › Status | active |
| Award 32 › Supplier › Name | Neilcott Construction Limited |
| Award 33 › Status | active |
| Award 33 › Supplier › Name | RAAM Construction Ltd |
| Award 34 › Status | active |
| Award 34 › Supplier › Name | Reds10 (UK) Ltd |
| Award 35 › Status | active |
| Award 35 › Supplier › Name | ROOFF CONSTRUCTION LTD |
| Award 36 › Status | active |
| Award 36 › Supplier › Name | SKAFFTEC LTD T/A R&B REFURBISHMENT |
| Award 37 › Status | active |
| Award 37 › Supplier › Name | Spacemaker Developments ltd |
| Award 38 › Status | active |
| Award 38 › Supplier › Name | Surecast Limited |
| Award 39 › Status | active |
| Award 39 › Supplier › Name | T&B Contractors Limited |
| Award 40 › Status | active |
| Award 40 › Supplier › Name | Thomas Sinden Limited |
| Award 41 › Status | active |
| Award 41 › Supplier › Name | Vallectric Ltd |
| Award 42 › Status | active |
| Award 42 › Supplier › Name | Vision Built Structures Ltd |
| Award 43 › Status | active |
| Award 43 › Supplier › Name | Woodnut Construction and Developments Ltd |
| Award 44 › Status | active |
| Award 44 › Supplier › Name | ZED PODS LIMITED |
Organisations
| Party 1 › Name | London Borough of Haringey |
| Party 1 › Identifier › Legal Name | London Borough of Haringey |
| Party 1 › Identifier › No Identifier Rationale | Not on any register |
| Party 1 › Address › Street | 7th Floor Alexandra House, 10 Station Road, Wood Green |
| Party 1 › Address › Town / city | London |
| Party 1 › Address › Region (NUTS) | UKI43 |
| Party 1 › Address › Postcode | N227TR |
| Party 1 › Address › Country | United Kingdom |
| Party 1 › Role | buyer |
| Party 1 › Link | https://www.haringey.gov.uk |
| Party 1 › Classification › Classification 1 › Description | Regional or local authority |
| Party 1 › Classification › Classification 2 › Description | General public services |
| Party 2 › Name | Advanced Interior Solutions Ltd. |
| Party 2 › Identifier › Legal Name | Advanced Interior Solutions Ltd. |
| Party 2 › Address › Street | St. Paul's House 10 Warwick Lane |
| Party 2 › Address › Town / city | London |
| Party 2 › Address › Region (NUTS) | UK |
| Party 2 › Address › Country | United Kingdom |
| Party 2 › Role | supplier |
| Party 2 › Business size | sme |
| Party 3 › Name | Alcema Ltd |
| Party 3 › Identifier › Legal Name | Alcema Ltd |
| Party 3 › Address › Street | No. 7A The Courtyard Furlong Rd Bourne End SL8 5AU |
| Party 3 › Address › Town / city | Bourne End |
| Party 3 › Address › Region (NUTS) | UK |
| Party 3 › Address › Country | United Kingdom |
| Party 3 › Role | supplier |
| Party 3 › Business size | sme |
| Party 4 › Name | Arte Construction Limited |
| Party 4 › Identifier › Legal Name | Arte Construction Limited |
| Party 4 › Address › Street | 34-35 Berwick Street Soho |
| Party 4 › Address › Town / city | London |
| Party 4 › Address › Region (NUTS) | UK |
| Party 4 › Address › Country | United Kingdom |
| Party 4 › Role | supplier |
| Party 4 › Business size | sme |
| Party 5 › Name | Axis Europe |
| Party 5 › Identifier › Legal Name | Axis Europe |
| Party 5 › Address › Street | Tramway House 3 Tramway Avenue |
| Party 5 › Address › Town / city | Stratford |
| Party 5 › Address › Region (NUTS) | UK |
| Party 5 › Address › Country | United Kingdom |
| Party 5 › Role | supplier |
| Party 5 › Business size | sme |
| Party 6 › Name | Ark Build PLC |
| Party 6 › Identifier › Legal Name | Ark Build PLC |
| Party 6 › Address › Street | Langston Road |
| Party 6 › Address › Town / city | Loughton |
| Party 6 › Address › Region (NUTS) | UK |
| Party 6 › Address › Country | United Kingdom |
| Party 6 › Role | supplier |
| Party 6 › Business size | sme |
| Party 7 › Name | Boom Construction Limited |
| Party 7 › Identifier › Legal Name | Boom Construction Limited |
| Party 7 › Address › Street | Rose Farm Chiswell Green Lane |
| Party 7 › Address › Town / city | St. Albans |
| Party 7 › Address › Region (NUTS) | UK |
| Party 7 › Address › Country | United Kingdom |
| Party 7 › Role | supplier |
| Party 7 › Business size | sme |
| Party 8 › Name | Built Fitout and Refurbishment Limited |
| Party 8 › Identifier › Legal Name | Built Fitout and Refurbishment Limited |
| Party 8 › Address › Street | Level 4 1 Berry Street |
| Party 8 › Address › Town / city | London |
| Party 8 › Address › Region (NUTS) | UK |
| Party 8 › Address › Country | United Kingdom |
| Party 8 › Role | supplier |
| Party 8 › Business size | sme |
| Party 9 › Name | CityAxis Limited |
| Party 9 › Identifier › Legal Name | CityAxis Limited |
| Party 9 › Address › Street | 346 Kensington High Street |
| Party 9 › Address › Town / city | London |
| Party 9 › Address › Region (NUTS) | UK |
| Party 9 › Address › Country | United Kingdom |
| Party 9 › Role | supplier |
| Party 9 › Business size | sme |
| Party 10 › Name | Curo Construction Limited |
| Party 10 › Identifier › Legal Name | Curo Construction Limited |
| Party 10 › Address › Street | 3-4 New Street EC2M 4TP |
| Party 10 › Address › Town / city | London |
| Party 10 › Address › Region (NUTS) | UK |
| Party 10 › Address › Country | United Kingdom |
| Party 10 › Role | supplier |