AWARD Framework Complete Works

London Construction Programme General Works Framework MW25-GW

Published 19 Mar 2026
19 Mar 2026


Reference: MW25-GW
The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multiple types of buildings including individual, multiple occupancy, residential, commercial, heritage, community and those operated by the public sector on a 24 hour basis (i.e. police, health, fire and rescue, care homes etc.). The scope of the works will include (but not limited to), new buildings, MMC, planned and preventative maintenance, refurbishment, retrofit, fire safety works, heritage related works, remediations, mechanical and engineering services, renewable energy systems and adaptations. The Framework will be established for a period of 5 years and will be available to any public sector body in London and the Home Counties. It is anticipated the framework will commence in September 2025. The London Construction Programme was established in 2012 by Haringey Council was, encouraged and supported by other London Local Authorities through London Councils, to develop a pan-London strategy to improve construction related procurement and establish a suite of collaborative contractual vehicles which public sector organisations can utilise. The LCP currently has a total membership of over 60 Public Sector organisations in London and Home County. The LCP is a 'virtual organisation' currently hosted and operated by Haringey Council. The current LCP Framework (MW19) expired in October 2024. This new Framework is to provide General Works construction and General Works construction related activities for new build developments, building related planned component replacement, fire safety, remediations, retrofit and refurbishments according to the Lot Categories. The services will be procured in 16 lots: Lot GN1 New Build up to £7.5m contract value Lot GN2 New Build £6m - £15m contract value Lot GN3 New Build £14m+ contract value Lot GNPS New Build £1+ (i.e.no minimum contract value) Lot GF1 Fire Safety Works up to £7.5m contract value Lot GF2 Fire Safety Works £6m - £15m contract value Lot GF3 Fire Safety Works £14m+ contract value Lot GFPS Fire Safety Works £1+ (i.e.no minimum contract value) Lot GR1 Refurbishment and Retrofit up to £7.5m contract value Lot GR2 Refurbishment and Retrofit £6m - £15m contract value Lot GR3 Refurbishment and Retrofit £14m+ contract value Lot GRPS Refurbishment and Retrofit £1+ (i.e.no minimum contract value) Lot GP1 Planned Preventative Maintenance up to £7.5m contract value Lot GP2 Planned Preventative Maintenance £6m - £15m contract value Lot GP3 Planned Preventative Maintenance £14m+ contract value Lot GPPS Planned Preventative Maintenance £1+ (i.e.no minimum contract value) Tenderers are restricted to applying for a maximum of two sub lots, plus the PS sub lot in each of the primary Lots (i.e. New Build, Fire Safety Works, refurbishment and retrofit, Planned Preventative Maintenance). There are reserved places for micro and small enterprises on different Lots in order to encourage SMEs and provide choice for its Clients. A Reserve List will also be used for this framework for those Tenderers who are unsuccessful in being awarded a place on the primary Lots. The framework will be established with four main objectives in mind:- 1. To support its Clients to deliver on their net zero commitments in the following areas:- • Biodiversity assets • Climate Change adaptation • Zero Carbon Supply Chain • Low Carbon Transportation • Operational Low Carbon 2. To provide a fast and efficient route to market for education schemes across London and the Home Counties that offers value for money. 3. To drive positive changes in mental health and equality, diversity and inclusion in the construction sector. 4. To apply best practice, unlock innovation and work collaboratively with its Client and the Supply Chain.

Full CPV breakdown

  • 45000000 — Construction work (primary)

Notice details

Buyer type
Local authority · General public services
Competition
Open competition (any supplier can bid)
Contract type
Works
Bids received
2,904
Winning supplier
SME
Lots
16
Procurement method
Open procedure
Main category
Works
Legal basis
CELEX 32014L0024
Notice status
Complete
Award status
Active
Options
Initial contract is for a period of 60 months
Number of lots
16
Language
EN
Published
19 Mar 2026 09:28
OCID
ocds-h6vhtk-04e6d8
Notice ID
MW25-GW

Competition

2,904
Bids received

Organisations on this notice

St. Paul's House 10 Warwick Lane, London, United Kingdom
GB-COH 1431977
Supplier SME
No. 7A The Courtyard Furlong Rd Bourne End SL8 5AU, Bourne End, United Kingdom
GB-COH 10063038
34-35 Berwick Street Soho, London, United Kingdom
GB-COH 12262724
Supplier SME
Tramway House 3 Tramway Avenue, Stratford, United Kingdom
GB-COH 1991637
Supplier SME
Langston Road, Loughton, United Kingdom
GB-COH 3864842
Boom Construction Limited
Supplier SME
Rose Farm Chiswell Green Lane, St. Albans, United Kingdom
GB-COH 7989022
Level 4 1 Berry Street, London, United Kingdom
GB-COH 11645768
CityAxis Limited
Supplier SME
346 Kensington High Street, London, United Kingdom
GB-COH 2748683
Curo Construction Limited
Supplier Large
3-4 New Street EC2M 4TP, London, United Kingdom
GB-COH 8807474
Supplier SME
6 Minster Court Tuscam Way, Cambeley, United Kingdom
GB-COH 8621605
Supplier SME
Unit 1E Barking Business Centre Thames Road, Barking, United Kingdom
GB-COH 8841731
Ensigna Construction ltd
Supplier SME
37-39b Freelands Road, Bromley, United Kingdom
GB-COH 5771179
Supplier Large
Titan Court 3 Bishops Square Hatfield Hertfordshire, Hertfordshire, United Kingdom
GB-COH 1738371
Ermine Construction Services Ltd.
Supplier SME
Unit 4 St. Georges Tower Hatley St. George, Sandy, United Kingdom
GB-COH 9534978
ETEC CONTRACT SERVICES LTD
Supplier SME
Suite 7, Elmhurst, 98-106 High Road South Woodford, London, United Kingdom
GB-COH 5392794
Formation Design & Build Limited
Supplier Large
Unit 1 38 Wembley Hill Road, Wembley, United Kingdom
GB-COH 3536763
Wonersh House The Guildway, Old Portsmouth Road, Surrey, United Kingdom
GB-COH 02472080
8 Power Road Chiswick, London, United Kingdom
GB-COH 05385076
Supplier Large
Ertosun House 61 Widmore Road, Bromley, United Kingdom
GB-COH 3517348
Highview Group LTD
Supplier SME
Quay House Battlesbridge Harbour Chelmsford Road, Wickford, United Kingdom
GB-COH 10349320
South Hanningfield Road, Wickford, United Kingdom
GB-COH 1414461
Supplier SME
Unit 1 North Point Belmont Industrial Estate, Durham, United Kingdom
GB-COH 2766783
Hiview House Highgate Road, London, United Kingdom
GB-COH 492042
5 Ballygowan Road, Hillsborough, United Kingdom
GB-COH NI003503
Johnsons 1871 Limited
Supplier SME
King Edward Court King Edward Road, Knutsford, United Kingdom
GB-COH 02372641
Bridge House 530 High Road, Leytonstone, United Kingdom
GB-COH 00387371
Kirkman and Jourdain Ltd
Supplier SME
150 Brooker Road Waltham Abbey, Essex, United Kingdom
GB-COH 1766240
Supplier Large
6 Wharf Studios 28, Wharf Road, London, United Kingdom
GB-COH 11894523
40 Oxford Road High Wycombe, Buckinghamshire, United Kingdom
GB-COH 05372315
McLaren Construction Limited
Supplier Large
11th Floor 20 Churchill Place, London, United Kingdom
GB-COH 05377750
Supplier SME
2 Shaftsbury Centre Icknield Way, Letchworth, United Kingdom
GB-COH 05166608
Excel House Cray Avenue, Orpington, United Kingdom
GB-COH 01151561
Supplier SME
Unit 8 Peerglow Estate Queensway, London, United Kingdom
GB-COH 05934914
Supplier Large
129-131 Metal Box Factory 30 Great Guildford street, London, United Kingdom
GB-COH 05934862
ROOFF CONSTRUCTION LTD
Supplier SME
The Granary 80 Abbey Road, Barking, United Kingdom
GB-COH 13135401
4 Abbey Trading Estate Bell Green Lane, London, United Kingdom
GB-COH 04428308
Spacemaker Developments ltd
Supplier SME
Suite 1 Xenus House Sandpiper Court, Eaton Socon, United Kingdom
GB-COH 10859210
Supplier SME
Second Floor Suite 10 Regent Gate High Street, Waltham Cross, United Kingdom
GB-COH 0388026 1
T&B Contractors Limited
Supplier SME
Riverside House Place Farm Wheathampstead, Herts, United Kingdom
GB-COH 1667869
Thomas Sinden Limited
Supplier SME
137-145 Church Road Harold Wood, Essex, United Kingdom
GB-COH 03308698

Lots (16)

Lot GN1
Lot GN1 New Build up to £7.5m contract value
· Cancelled
Lot GN2
GN2 (New Build £6m to £15m)
· Cancelled
Lot GN3
GN3 (New Build £14m and above)
· Cancelled
Lot GNPS
GNPS (New Build £1 and above)
· Cancelled
Lot GF1
GF1 (Fire Safety Works up to £7.5million)
· Cancelled
Lot GF2
GF2 (Fire Safety Works £6m to £15m)
· Cancelled
Lot GF3
Initial contract is for a period of 60 months
· Cancelled
Lot GFPS
GFPS (Fire Safety Works £1 and above)
· Cancelled
Lot GR1
GR1 (Refurbishment and Retrofit up to £7.5million)
· Cancelled
Lot GR2
GR2 (Refurbishment and Retrofit £6m to £15m)
· Cancelled
Lot GR3
GR3 (Refurbishment and Retrofit £14m and above
· Cancelled
Lot GRPS
GRPS (Refurbishment and Retrofit £1 and above)
· Cancelled
Lot GP1
GP1 (Planned Preventative Maintenance up to £7.5million)
· Cancelled
Lot GP2
GP2 (Planned Preventative Maintenance £6m to £15m)
· Cancelled
Lot GP3
GP3 (Planned Preventative Maintenance £14m and above)
· Cancelled
Lot GPPS
GPPS (Planned Preventative Maintenance £1 and above)
· Cancelled

Everything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see

Tender

Title London Construction Programme General Works Framework MW25-GW
Status complete
CPV › Description Construction work
Category works
Lot › Lot 1 › Description Lot GN1 New Build up to £7.5m contract value
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 1 › Has options Yes
Lot › Lot 1 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 1 › Status cancelled
Lot › Lot 2 › Description GN2 (New Build £6m to £15m)
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 2 › Has options Yes
Lot › Lot 2 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 2 › Status cancelled
Lot › Lot 3 › Description GN3 (New Build £14m and above)
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 3 › Has options Yes
Lot › Lot 3 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 3 › Status cancelled
Lot › Lot 4 › Description GNPS (New Build £1 and above)
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 4 › Has options Yes
Lot › Lot 4 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 4 › Status cancelled
Lot › Lot 5 › Description GF1 (Fire Safety Works up to £7.5million)
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Description 70
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 5 › Has options Yes
Lot › Lot 5 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 5 › Status cancelled
Lot › Lot 6 › Description GF2 (Fire Safety Works £6m to £15m)
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 6 › Has options Yes
Lot › Lot 6 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 6 › Status cancelled
Lot › Lot 7 › Description Initial contract is for a period of 60 months
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 7 › Has options Yes
Lot › Lot 7 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 7 › Status cancelled
Lot › Lot 8 › Description GFPS (Fire Safety Works £1 and above)
Lot › Lot 8 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 8 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 8 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 8 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 8 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 8 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 8 › Has options Yes
Lot › Lot 8 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 8 › Status cancelled
Lot › Lot 9 › Description GR1 (Refurbishment and Retrofit up to £7.5million)
Lot › Lot 9 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 9 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 9 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 9 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 9 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 9 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 9 › Has options Yes
Lot › Lot 9 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 9 › Status cancelled
Lot › Lot 10 › Description GR2 (Refurbishment and Retrofit £6m to £15m)
Lot › Lot 10 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 10 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 10 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 10 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 10 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 10 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 10 › Has options Yes
Lot › Lot 10 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 10 › Status cancelled
Lot › Lot 11 › Description GR3 (Refurbishment and Retrofit £14m and above
Lot › Lot 11 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 11 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 11 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 11 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 11 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 11 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 11 › Has options Yes
Lot › Lot 11 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 11 › Status cancelled
Lot › Lot 12 › Description GRPS (Refurbishment and Retrofit £1 and above)
Lot › Lot 12 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 12 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 12 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 12 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 12 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 12 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 12 › Has options Yes
Lot › Lot 12 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 12 › Status cancelled
Lot › Lot 13 › Description GP1 (Planned Preventative Maintenance up to £7.5million)
Lot › Lot 13 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 13 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 13 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 13 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 13 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 13 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 13 › Has options Yes
Lot › Lot 13 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 13 › Status cancelled
Lot › Lot 14 › Description GP2 (Planned Preventative Maintenance £6m to £15m)
Lot › Lot 14 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 14 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 14 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 14 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 14 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 14 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 14 › Has options Yes
Lot › Lot 14 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 14 › Status cancelled
Lot › Lot 15 › Description GP3 (Planned Preventative Maintenance £14m and above)
Lot › Lot 15 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 15 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 15 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 15 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 15 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 15 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 15 › Has options Yes
Lot › Lot 15 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 15 › Status cancelled
Lot › Lot 16 › Description GPPS (Planned Preventative Maintenance £1 and above)
Lot › Lot 16 › Award criteria › Criterion › Criterion 1 › Name Price
Lot › Lot 16 › Award criteria › Criterion › Criterion 1 › Type cost
Lot › Lot 16 › Award criteria › Criterion › Criterion 1 › Description 30
Lot › Lot 16 › Award criteria › Criterion › Criterion 2 › Name Quality
Lot › Lot 16 › Award criteria › Criterion › Criterion 2 › Type cost
Lot › Lot 16 › Award criteria › Criterion › Criterion 2 › Description 70
Lot › Lot 16 › Has options Yes
Lot › Lot 16 › Options › Description Initial contract is for a period of 60 months
Lot › Lot 16 › Status cancelled
Item › Item 1 › CPV › Description Construction work
Item › Item 1 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 1 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 1 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 1 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 1 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 1 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 1 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 1 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 1 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 2 › CPV › Description Construction work
Item › Item 2 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 2 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 2 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 2 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 2 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 2 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 2 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 2 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 2 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 3 › CPV › Description Construction work
Item › Item 3 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 3 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 3 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 3 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 3 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 3 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 3 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 3 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 3 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 4 › CPV › Description Construction work
Item › Item 4 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 4 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 4 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 4 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 4 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 4 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 4 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 4 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 4 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 5 › CPV › Description Construction work
Item › Item 5 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 5 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 5 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 5 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 5 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 5 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 5 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 5 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 5 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 6 › CPV › Description Construction work
Item › Item 6 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 6 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 6 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 6 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 6 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 6 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 6 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 6 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 6 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 7 › CPV › Description Construction work
Item › Item 7 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 7 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 7 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 7 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 7 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 7 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 7 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 7 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 7 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 8 › CPV › Description Construction work
Item › Item 8 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 8 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 8 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 8 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 8 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 8 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 8 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 8 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 8 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 9 › CPV › Description Construction work
Item › Item 9 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 9 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 9 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 9 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 9 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 9 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 9 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 9 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 9 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 10 › CPV › Description Construction work
Item › Item 10 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 10 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 10 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 10 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 10 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 10 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 10 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 10 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 10 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 11 › CPV › Description Construction work
Item › Item 11 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 11 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 11 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 11 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 11 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 11 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 11 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 11 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 11 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 12 › CPV › Description Construction work
Item › Item 12 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 12 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 12 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 12 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 12 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 12 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 12 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 12 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 12 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 13 › CPV › Description Construction work
Item › Item 13 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 13 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 13 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 13 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 13 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 13 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 13 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 13 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 13 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 14 › CPV › Description Construction work
Item › Item 14 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 14 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 14 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 14 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 14 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 14 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 14 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 14 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 14 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 15 › CPV › Description Construction work
Item › Item 15 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 15 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 15 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 15 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 15 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 15 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 15 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 15 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 15 › Delivery › Delivery 9 › Region (NUTS) UKK
Item › Item 16 › CPV › Description Construction work
Item › Item 16 › Delivery › Delivery 1 › Region (NUTS) UKC
Item › Item 16 › Delivery › Delivery 2 › Region (NUTS) UKD
Item › Item 16 › Delivery › Delivery 3 › Region (NUTS) UKE
Item › Item 16 › Delivery › Delivery 4 › Region (NUTS) UKF
Item › Item 16 › Delivery › Delivery 5 › Region (NUTS) UKG
Item › Item 16 › Delivery › Delivery 6 › Region (NUTS) UKH
Item › Item 16 › Delivery › Delivery 7 › Region (NUTS) UKI
Item › Item 16 › Delivery › Delivery 8 › Region (NUTS) UKJ
Item › Item 16 › Delivery › Delivery 9 › Region (NUTS) UKK
Procedure type open
Procedure Open procedure

Awards

Award 1 › Status active
Award 1 › Supplier › Name Advanced Interior Solutions Ltd.
Award 2 › Status active
Award 2 › Supplier › Name Alcema Ltd
Award 3 › Status active
Award 3 › Supplier › Name Arte Construction Limited
Award 4 › Status active
Award 4 › Supplier › Name Axis Europe
Award 5 › Status active
Award 5 › Supplier › Name Ark Build PLC
Award 6 › Status active
Award 6 › Supplier › Name Boom Construction Limited
Award 7 › Status active
Award 7 › Supplier › Name Built Fitout and Refurbishment Limited
Award 8 › Status active
Award 8 › Supplier › Name CityAxis Limited
Award 9 › Status active
Award 9 › Supplier › Name Curo Construction Limited
Award 10 › Status active
Award 10 › Supplier › Name Devcon Limited
Award 11 › Status active
Award 11 › Supplier › Name E&C CONSTRUCTION LTD
Award 12 › Status active
Award 12 › Supplier › Name Ensigna Construction ltd
Award 13 › Status active
Award 13 › Supplier › Name Equans Regeneration Ltd
Award 14 › Status active
Award 14 › Supplier › Name Ermine Construction Services Ltd.
Award 15 › Status active
Award 15 › Supplier › Name ETEC CONTRACT SERVICES LTD
Award 16 › Status active
Award 16 › Supplier › Name Formation Design & Build Limited
Award 17 › Status active
Award 17 › Supplier › Name Galliford Try Construction Limited
Award 18 › Status active
Award 18 › Supplier › Name Glenman Corporation Ltd
Award 19 › Status active
Award 19 › Supplier › Name Guildmore Limited
Award 20 › Status active
Award 20 › Supplier › Name Highview Group LTD
Award 21 › Status active
Award 21 › Supplier › Name Indecon Building Limited
Award 22 › Status active
Award 22 › Supplier › Name Isoler Limted
Award 23 › Status active
Award 23 › Supplier › Name J Murphy and Sons Limited
Award 24 › Status active
Award 24 › Supplier › Name John Graham Construction Ltd
Award 25 › Status active
Award 25 › Supplier › Name Johnsons 1871 Limited
Award 26 › Status active
Award 26 › Supplier › Name Kind & Company (Builders ltd)
Award 27 › Status active
Award 27 › Supplier › Name Kirkman and Jourdain Ltd
Award 28 › Status active
Award 28 › Supplier › Name Landmark Facades Ltd
Award 29 › Status active
Award 29 › Supplier › Name LIFE Build Solutions Limited
Award 30 › Status active
Award 30 › Supplier › Name McLaren Construction Limited
Award 31 › Status active
Award 31 › Supplier › Name MP Building Ltd
Award 32 › Status active
Award 32 › Supplier › Name Neilcott Construction Limited
Award 33 › Status active
Award 33 › Supplier › Name RAAM Construction Ltd
Award 34 › Status active
Award 34 › Supplier › Name Reds10 (UK) Ltd
Award 35 › Status active
Award 35 › Supplier › Name ROOFF CONSTRUCTION LTD
Award 36 › Status active
Award 36 › Supplier › Name SKAFFTEC LTD T/A R&B REFURBISHMENT
Award 37 › Status active
Award 37 › Supplier › Name Spacemaker Developments ltd
Award 38 › Status active
Award 38 › Supplier › Name Surecast Limited
Award 39 › Status active
Award 39 › Supplier › Name T&B Contractors Limited
Award 40 › Status active
Award 40 › Supplier › Name Thomas Sinden Limited
Award 41 › Status active
Award 41 › Supplier › Name Vallectric Ltd
Award 42 › Status active
Award 42 › Supplier › Name Vision Built Structures Ltd
Award 43 › Status active
Award 43 › Supplier › Name Woodnut Construction and Developments Ltd
Award 44 › Status active
Award 44 › Supplier › Name ZED PODS LIMITED

Organisations

Party 1 › Name London Borough of Haringey
Party 1 › Identifier › Legal Name London Borough of Haringey
Party 1 › Identifier › No Identifier Rationale Not on any register
Party 1 › Address › Street 7th Floor Alexandra House, 10 Station Road, Wood Green
Party 1 › Address › Town / city London
Party 1 › Address › Region (NUTS) UKI43
Party 1 › Address › Postcode N227TR
Party 1 › Address › Country United Kingdom
Party 1 › Role buyer
Party 1 › Link https://www.haringey.gov.uk
Party 1 › Classification › Classification 1 › Description Regional or local authority
Party 1 › Classification › Classification 2 › Description General public services
Party 2 › Name Advanced Interior Solutions Ltd.
Party 2 › Identifier › Legal Name Advanced Interior Solutions Ltd.
Party 2 › Address › Street St. Paul's House 10 Warwick Lane
Party 2 › Address › Town / city London
Party 2 › Address › Region (NUTS) UK
Party 2 › Address › Country United Kingdom
Party 2 › Role supplier
Party 2 › Business size sme
Party 3 › Name Alcema Ltd
Party 3 › Identifier › Legal Name Alcema Ltd
Party 3 › Address › Street No. 7A The Courtyard Furlong Rd Bourne End SL8 5AU
Party 3 › Address › Town / city Bourne End
Party 3 › Address › Region (NUTS) UK
Party 3 › Address › Country United Kingdom
Party 3 › Role supplier
Party 3 › Business size sme
Party 4 › Name Arte Construction Limited
Party 4 › Identifier › Legal Name Arte Construction Limited
Party 4 › Address › Street 34-35 Berwick Street Soho
Party 4 › Address › Town / city London
Party 4 › Address › Region (NUTS) UK
Party 4 › Address › Country United Kingdom
Party 4 › Role supplier
Party 4 › Business size sme
Party 5 › Name Axis Europe
Party 5 › Identifier › Legal Name Axis Europe
Party 5 › Address › Street Tramway House 3 Tramway Avenue
Party 5 › Address › Town / city Stratford
Party 5 › Address › Region (NUTS) UK
Party 5 › Address › Country United Kingdom
Party 5 › Role supplier
Party 5 › Business size sme
Party 6 › Name Ark Build PLC
Party 6 › Identifier › Legal Name Ark Build PLC
Party 6 › Address › Street Langston Road
Party 6 › Address › Town / city Loughton
Party 6 › Address › Region (NUTS) UK
Party 6 › Address › Country United Kingdom
Party 6 › Role supplier
Party 6 › Business size sme
Party 7 › Name Boom Construction Limited
Party 7 › Identifier › Legal Name Boom Construction Limited
Party 7 › Address › Street Rose Farm Chiswell Green Lane
Party 7 › Address › Town / city St. Albans
Party 7 › Address › Region (NUTS) UK
Party 7 › Address › Country United Kingdom
Party 7 › Role supplier
Party 7 › Business size sme
Party 8 › Name Built Fitout and Refurbishment Limited
Party 8 › Identifier › Legal Name Built Fitout and Refurbishment Limited
Party 8 › Address › Street Level 4 1 Berry Street
Party 8 › Address › Town / city London
Party 8 › Address › Region (NUTS) UK
Party 8 › Address › Country United Kingdom
Party 8 › Role supplier
Party 8 › Business size sme
Party 9 › Name CityAxis Limited
Party 9 › Identifier › Legal Name CityAxis Limited
Party 9 › Address › Street 346 Kensington High Street
Party 9 › Address › Town / city London
Party 9 › Address › Region (NUTS) UK
Party 9 › Address › Country United Kingdom
Party 9 › Role supplier
Party 9 › Business size sme
Party 10 › Name Curo Construction Limited
Party 10 › Identifier › Legal Name Curo Construction Limited
Party 10 › Address › Street 3-4 New Street EC2M 4TP
Party 10 › Address › Town / city London
Party 10 › Address › Region (NUTS) UK
Party 10 › Address › Country United Kingdom
Party 10 › Role supplier
Track this tender

Track this tender in your bid pipeline and set reminders.

See plans

Never miss a contract you could win

Search every UK public sector tender in one place, and get alerts the morning new ones appear.

Free to search No card needed Cancel any time
WhatsApp us