Back to search
Find a Tender
TENDER
Active Services
Courtauld Strand Campus - Construction Management SQ stage
Published 16 Jan 2026
16 Jan 2026
Closed 16 Feb 2026
- Primary CPV
-
71540000 *
Construction management services
- Location
- 🇬🇧 London
- Value
- £4,905,000
- Contract
-
1.8 years Duration
18/05/2026 20/03/2028
- Contract Types
-
71 *Architectural, engineering & inspection...Full CPV Breakdown
- SME suitable
- Not stated
Publisher Address
Somerset House, London, WC2R 0RN, United Kingdom · UKI
Contact
Award Criteria
- Quality (60%)
- Cost (30%)
- Social Value (10%)
- As previously noted, e-portal is being changed and new link... · Technical Specifications
- Bidding Documents (find-tender.service.gov.uk) · Bidding Documents
Related tenders
COURTAULD INSTITUTE OF ART
All notices from this publisher Same CPV code
71540000 *
All notices with this CPV code
Reference: ocds-h6vhtk-05fae4
The Courtauld is planning to redevelop the East Wing of its current campus linking it to additional buildings at 152 - 158 The Strand.
Accordingly the Courtauld intends to seek competitive proposals for a Construction Manager to amongst other services provide:
Pre-construction advice and methodology
Procure on behalf of the employer Trade Contractors to undertake the works. Trades likely to include:
Demolition including forming complex openings and Façade retention
Substructure works
Steel frame
Concrete works
Carpentry
Traditional roofing
Balustrading
Fine decorations
Mechanical & Electrical Services
Lift installations
Security systems
Cranage
Scaffold
Management of works by Trade Contractors including rectification of defects
Financial management to ensure project delivered within budget.
The client is procuring a soft strip package separately and it is intended this will commence in April 2025.
CM will commence services at approximately same time with intention of commencing hard demolition from August 2026. Completion of Construction 2028.
Anticipated value of works excluding services provided by CM approximately £42m exc VAT
Applicants need to be able to demonstrate experience of proposed staff working within Grade I and II* partially occupied premises in a busy city centre site.
Full CPV breakdown
- 71540000 — Construction management services (primary)
Notice details
- Buyer type
- Local authority
- Competition
- Open competition (any supplier can bid)
- Contract type
- Services
- Procurement method
- Competitive flexible procedure
- Main category
- Services
- Above threshold
- Yes
- Legal basis
- UKPGA 2023/54
- Notice status
- Active
- Options
- Change control procedure will be run throughout the contract allowing for additional scope to be instructed if necessary.
- Submission method
- The Courtauld is currently changing e-tendering portals. Once the new system is live the URL will be published ahead of the submission date. http://www.example.com/
- Enquiries close
- 2 Feb 2026
- Award decision expected
- 4 May 2026
- Language
- EN
- Published
- 16 Jan 2026 16:30
- Deadline
- 16 Feb 2026 23:59
- OCID
- ocds-h6vhtk-05fae4
- Notice ID
- ocds-h6vhtk-05fae4
Organisations on this notice
Procuring Entity, Process Contact Point
Procuring Entity
Full notice record
80 detailsEverything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see
Organisations
| Party 1 › Name | COURTAULD INSTITUTE OF ART |
| Party 1 › Address › Street | Somerset House |
| Party 1 › Address › Town / city | London |
| Party 1 › Address › Postcode | WC2R 0RN |
| Party 1 › Address › Country | GB |
| Party 1 › Address › Country | United Kingdom |
| Party 1 › Address › Region (NUTS) | UKI32 |
| Party 1 › Role | buyer |
| Party 1 › Classification › Description | Public authority - sub-central government |
| Party 2 › Name | GARDINER & THEOBALD LLP |
| Party 2 › Address › Street | 10 South Crescent |
| Party 2 › Address › Town / city | London |
| Party 2 › Address › Postcode | WC1E 7BD |
| Party 2 › Address › Country | GB |
| Party 2 › Address › Country | United Kingdom |
| Party 2 › Address › Region (NUTS) | UKI31 |
| Party 2 › Role › Role 1 | Procuring entity |
| Party 2 › Role › Role 2 | Process contact point |
| Party 2 › Role Details | Project Manager |
| Party 3 › Name | AECOM LIMITED |
| Party 3 › Address › Street | Aldgate Tower |
| Party 3 › Address › Town / city | London |
| Party 3 › Address › Postcode | E1 8FA |
| Party 3 › Address › Country | GB |
| Party 3 › Address › Country | United Kingdom |
| Party 3 › Address › Region (NUTS) | UKI42 |
| Party 3 › Role | Procuring entity |
| Party 3 › Role Details | Cost Consultant |
| Party 3 › Link | http://www.aecom.com |
Buyer
| Name | COURTAULD INSTITUTE OF ART |
Tender
| Title | Courtauld Strand Campus - Construction Management SQ stage |
| Status | active |
| Item › CPV › Description | Construction management services |
| Item › Delivery › Region (NUTS) | UKI |
| Item › Delivery › Country | GB |
| Item › Delivery › Country | United Kingdom |
| Value › Value incl. VAT | £5,886,000 |
| Value › Value | £4,905,000 |
| Value › Currency | GBP |
| Procedure type | open |
| Procedure | Competitive flexible procedure |
| Procedure › Features | Selection will be undertaken using a Selection Questionnaire. Certain questions will be assessed on a pass/fail basis and others will be qualitatively scored for the purpose of shortlisting, as outlined in the SQ instructions and response document. Selection assessment does not constitute an award of the contract. SQ process will be followed by shortlisting. Then a restricted ITT stage will take place, followed by evaluation, selection and award. The award criteria set out in this notice are for the ITT stage to follow. |
| Category | services |
| Above threshold | Yes |
| How to submit | The Courtauld is currently changing e-tendering portals. Once the new system is live the URL will be published ahead of the submission date. http://www.example.com/ |
| Submission Terms › Electronic submission | allowed |
| Submission Terms › Languages | en |
| Bidding period › End | 16 Feb 2026 |
| Questions period › End | 2 Feb 2026 |
| Award decision period › End | 4 May 2026 |
| Lot › Status | active |
| Lot › Value › Value incl. VAT | £5,886,000 |
| Lot › Value › Value | £4,905,000 |
| Lot › Value › Currency | GBP |
| Lot › Award criteria › Criterion › Criterion 1 › Type | quality |
| Lot › Award criteria › Criterion › Criterion 1 › Name | Quality |
| Lot › Award criteria › Criterion › Criterion 1 › Weighting › Weight | 60 |
| Lot › Award criteria › Criterion › Criterion 1 › Weighting › Weight type | Percentage exact |
| Lot › Award criteria › Criterion › Criterion 2 › Type | cost |
| Lot › Award criteria › Criterion › Criterion 2 › Name | Cost |
| Lot › Award criteria › Criterion › Criterion 2 › Weighting › Weight | 30 |
| Lot › Award criteria › Criterion › Criterion 2 › Weighting › Weight type | Percentage exact |
| Lot › Award criteria › Criterion › Criterion 3 › Type | quality |
| Lot › Award criteria › Criterion › Criterion 3 › Name | Social Value |
| Lot › Award criteria › Criterion › Criterion 3 › Weighting › Weight | 10 |
| Lot › Award criteria › Criterion › Criterion 3 › Weighting › Weight type | Percentage exact |
| Lot › Contract period › Start | 18 May 2026 |
| Lot › Contract period › End | 20 Mar 2028 |
| Lot › Has options | Yes |
| Lot › Options › Description | Change control procedure will be run throughout the contract allowing for additional scope to be instructed if necessary. |
| Document › Document 1 › Document type | Conflict of interest |
| Document › Document 1 › Description | Not published |
| Document › Document 2 › Document type | Technical specifications |
| Document › Document 2 › Link | https://www.example.com/abc123/specification.pdf |
| Document › Document 3 › Document type | Bidding documents |
| Document › Document 3 › Link | https://www.find-tender.service.gov.uk/Notice/Attachment/A-10444 |
| Document › Document 4 › Document type | Tender notice |
| Document › Document 4 › Description | Tender notice on Find a Tender |
| Document › Document 4 › Link | https://www.find-tender.service.gov.uk/Notice/004070-2026 |
| Document › Document 4 › Published | 16 Jan 2026 |