Updated hourly from UK government portals and TED (EU) WhatsApp contact@tendernotify.co.uk
Back to search Find a Tender
TENDER Framework Active Works

Buckinghamshire Highways Works Open Framework

Published 21 Nov 2026
21 Nov 2026


Reference: BC/0002075
The provision of highway related construction works and associated services comprising capital-funded maintenance and improvement schemes, delivered in accordance with Buckinghamshire Council's asset management strategy to enhance the operation and maintain the serviceability of the highway asset and include, without limitation: This Procurement is being conducted to establish an Open Framework Scheme in accordance with Section 49 of the Procurement Act 2023. The maximum total duration of this Open Framework Scheme—including all successive framework agreements awarded under it—shall be eight (8) years from the commencement date of the initial framework agreement. The Framework is divided into seven (7) discrete Lots. It is the Contracting Authority’s intention to appoint a maximum of four (4) suppliers to each individual Lot at any given time.

Full CPV breakdown

  • 34922100 — Road markings (primary)

Notice details

Buyer type
Local authority
Competition
Restricted / competitive (suppliers are shortlisted first)
Contract type
Works
Lots
7
Procurement method
Competitive flexible procedure
Main category
Works
Above threshold
Yes
Legal basis
UKPGA 2023/54
Notice status
Active
Renewal
The Framework will operate through a series of successive framework agreements: • The initial Framework awarded at Year 0 shall have a maximum duration of three (3) years. • Any successive Framework awarded following a reopening window shall have a maximum duration of up to five (5) years, subject always to the overarching eight (8) year limit. The initial framework phase Contract will start on 01/04/2027 and the initial term will end on 31/03/2030. The Council will reopen the Framework to competition at least once during the first three (3) years of the scheme’s life, and at least once every five (5) years thereafter. The Council explicitly reserves the right, at its absolute discretion, to reopen the scheme earlier than Year 3, or more frequently than the minimums, if it determines that a market refresh, supplementary capacity, or a change in requirements is required.
Framework agreement
Yes
Framework details
The Council operates a robust performance management framework to ensure high-quality delivery across the lifespan of this Framework. Performance on individual call-off contracts will be actively monitored using five (5) core Key Performance Indicators (KPIs). Further operational ‘Call-off KPIs’ will be agreed with successful bidders. Full details of the five core KPIs – including specific targets, data collection methodologies, and reporting frequencies – will be provided to shortlisted bidders within the Stage 2 Invitation to Tender (ITT) documentation. The Council reserves the right to apply all or a proportionate subset of these five KPI’s to individual call-off contracts, depending on the complexity and scope of the specific project package.
Submission method
All suppliers wishing to participate will be required to be registered on our In-tend e-procurement portal. If you are not already registered, please ensure you: 1. Visit the portal at https://in-tendhost.co.uk/buckinghamshire-council/aspx/Home 2. Complete the supplier registration process. Once registered, the reference for this procurement is BC/0002075.
Enquiries close
15 Dec 2026
Award decision expected
22 Mar 2027
Number of lots
7
Language
EN
Published
21 Nov 2026 11:09
OCID
ocds-h6vhtk-06cc4e
Notice ID
BC/0002075

Lots (7)

Lot 1: Lot 1: Highways Works: Minor works (up to £1M) £25,055,000
• Civil engineering works • Electrical works, including those associated with pedestrian crossings (e.g. signals, lighting columns, and Belisha beacons) • Safety Fencing • Traffic Signal modifications • Lighting schemes • Footway maintenance and improvement schemes
1 Apr 2027 to 31 Mar 2030 · Active
Lot 2: Lot 2: Specialist minor works: Traffic Signs, Lining & Studs £2,000,000
• Road markings • Road studs • Pre surveys/design • Traffic signs
1 Apr 2027 to 31 Mar 2030 · Active
Lot 3: Lot 3: Drainage installation/ Improvement Schemes £5,600,000
• Soakaway / borehole installers • Drainage improvement Schemes • Greening and drainage works, including Sustainable Drainage Systems (SuDS)
1 Apr 2027 to 31 Mar 2030 · Active
Lot 4: Lot 4: Bridges & Structures: Structural works (up to £1M) £11,400,000
The provision of structural maintenance and improvement works
1 Apr 2027 to 31 Mar 2030 · Active
Lot 5: Buckinghamshire Highways Works Open Framework - Lot 5: Conventional Surfacing £46,400,000
• Carriageway inlay • Carriageway overlay • Carriageway reconstruction • Carriageway strengthening /reinforcement • Prep Work for Surface Treatments
1 Apr 2027 to 31 Mar 2030 · Active
Lot 6: Buckinghamshire Highways Works Open Framework - Lot 6: Specialist treatments £23,575,000
• Micro surfacing • Thin surfacing systems • Surface dressing • High friction surfacing • Joint repair and reinstatement • Coloured and decorative surfacing • Retexturing • Slurry Sealing on footways
1 Apr 2027 to 31 Mar 2030 · Active
Lot 7: Buckinghamshire Highways Works Open Framework - Lot 7: Pavement rehabilitation £12,000,000
• Grouted macadam and the like • In situ recycling • In situ recycling (cold or hot) • Full depth reclamation (FDR) • Pulverisation and stabilisation
1 Apr 2027 to 31 Mar 2030 · Active

Everything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see

Organisations

Name Buckinghamshire Council
Address › Street The Gateway, Gatehouse Road
Address › Town / city Aylesbury
Address › Postcode HP198FF
Address › Country GB
Address › Country United Kingdom
Address › Region (NUTS) UKJ13
Role buyer
Link https://www.buckinghamshire.gov.uk/
Classification › Description Public authority - sub-central government

Buyer

Name Buckinghamshire Council

Tender

Title Buckinghamshire Highways Works Open Framework
Status active
Item › Item 1 › CPV › CPV 1 › Description Road markings
Item › Item 1 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 1 › CPV › CPV 3 › Description Drainage works
Item › Item 1 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 1 › CPV › CPV 5 › Description Construction work for highways
Item › Item 1 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 1 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 1 › CPV › CPV 8 › Description Surface work for highways
Item › Item 1 › CPV › CPV 9 › Description Surface work for roads
Item › Item 1 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 1 › Delivery › Region (NUTS) UKJ13
Item › Item 1 › Delivery › Country GB
Item › Item 1 › Delivery › Country United Kingdom
Item › Item 2 › CPV › CPV 1 › Description Road markings
Item › Item 2 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 2 › CPV › CPV 3 › Description Drainage works
Item › Item 2 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 2 › CPV › CPV 5 › Description Construction work for highways
Item › Item 2 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 2 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 2 › CPV › CPV 8 › Description Surface work for highways
Item › Item 2 › CPV › CPV 9 › Description Surface work for roads
Item › Item 2 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 2 › Delivery › Region (NUTS) UKJ13
Item › Item 2 › Delivery › Country GB
Item › Item 2 › Delivery › Country United Kingdom
Item › Item 3 › CPV › CPV 1 › Description Road markings
Item › Item 3 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 3 › CPV › CPV 3 › Description Drainage works
Item › Item 3 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 3 › CPV › CPV 5 › Description Construction work for highways
Item › Item 3 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 3 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 3 › CPV › CPV 8 › Description Surface work for highways
Item › Item 3 › CPV › CPV 9 › Description Surface work for roads
Item › Item 3 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 3 › Delivery › Region (NUTS) UKJ13
Item › Item 3 › Delivery › Country GB
Item › Item 3 › Delivery › Country United Kingdom
Item › Item 4 › CPV › CPV 1 › Description Road markings
Item › Item 4 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 4 › CPV › CPV 3 › Description Drainage works
Item › Item 4 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 4 › CPV › CPV 5 › Description Construction work for highways
Item › Item 4 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 4 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 4 › CPV › CPV 8 › Description Surface work for highways
Item › Item 4 › CPV › CPV 9 › Description Surface work for roads
Item › Item 4 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 4 › Delivery › Region (NUTS) UKJ13
Item › Item 4 › Delivery › Country GB
Item › Item 4 › Delivery › Country United Kingdom
Item › Item 5 › CPV › CPV 1 › Description Road markings
Item › Item 5 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 5 › CPV › CPV 3 › Description Drainage works
Item › Item 5 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 5 › CPV › CPV 5 › Description Construction work for highways
Item › Item 5 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 5 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 5 › CPV › CPV 8 › Description Surface work for highways
Item › Item 5 › CPV › CPV 9 › Description Surface work for roads
Item › Item 5 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 5 › Delivery › Region (NUTS) UKJ13
Item › Item 5 › Delivery › Country GB
Item › Item 5 › Delivery › Country United Kingdom
Item › Item 6 › CPV › CPV 1 › Description Road markings
Item › Item 6 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 6 › CPV › CPV 3 › Description Drainage works
Item › Item 6 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 6 › CPV › CPV 5 › Description Construction work for highways
Item › Item 6 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 6 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 6 › CPV › CPV 8 › Description Surface work for highways
Item › Item 6 › CPV › CPV 9 › Description Surface work for roads
Item › Item 6 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 6 › Delivery › Region (NUTS) UKJ13
Item › Item 6 › Delivery › Country GB
Item › Item 6 › Delivery › Country United Kingdom
Item › Item 7 › CPV › CPV 1 › Description Road markings
Item › Item 7 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 7 › CPV › CPV 3 › Description Drainage works
Item › Item 7 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 7 › CPV › CPV 5 › Description Construction work for highways
Item › Item 7 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 7 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 7 › CPV › CPV 8 › Description Surface work for highways
Item › Item 7 › CPV › CPV 9 › Description Surface work for roads
Item › Item 7 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 7 › Delivery › Region (NUTS) UKJ13
Item › Item 7 › Delivery › Country GB
Item › Item 7 › Delivery › Country United Kingdom
Value › Value incl. VAT £151,236,000
Value › Value £126,030,000
Value › Currency GBP
Procedure type selective
Procedure Competitive flexible procedure
Category works
Above threshold Yes
Techniques › Framework agreement Yes
Techniques › Framework agreement › Is Open Framework Scheme Yes
Techniques › Framework agreement › Method With reopening competition
Techniques › Framework agreement › Type closed
Techniques › Framework agreement › Open Framework Scheme End Date 31 Mar 2035
How to submit All suppliers wishing to participate will be required to be registered on our In-tend e-procurement portal. If you are not already registered, please ensure you: 1. Visit the portal at https://in-tendhost.co.uk/buckinghamshire-council/aspx/Home 2. Complete the supplier registration process. Once registered, the reference for this procurement is BC/0002075.
Submission Terms › Electronic submission allowed
Submission Terms › Languages en
Expression Of Interest Deadline 23 Dec 2026
Questions period › End 15 Dec 2026
Award decision period › End 22 Mar 2027
Lot › Lot 1 › Title Lot 1: Highways Works: Minor works (up to £1M)
Lot › Lot 1 › Description • Civil engineering works • Electrical works, including those associated with pedestrian crossings (e.g. signals, lighting columns, and Belisha beacons) • Safety Fencing • Traffic Signal modifications • Lighting schemes • Footway maintenance and improvement schemes
Lot › Lot 1 › Status active
Lot › Lot 1 › Value › Value incl. VAT £30,066,000
Lot › Lot 1 › Value › Value £25,055,000
Lot › Lot 1 › Value › Currency GBP
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 1 › Second Stage › Minimum Candidates 1
Lot › Lot 1 › Second Stage › Maximum Candidates 6
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 1 › Suitable for › SMEs Yes
Lot › Lot 1 › Contract period › Start 1 Apr 2027
Lot › Lot 1 › Contract period › End 31 Mar 2030
Lot › Lot 1 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 1 › Can be renewed Yes
Lot › Lot 2 › Title Lot 2: Specialist minor works: Traffic Signs, Lining & Studs
Lot › Lot 2 › Description • Road markings • Road studs • Pre surveys/design • Traffic signs
Lot › Lot 2 › Status active
Lot › Lot 2 › Value › Value incl. VAT £2,400,000
Lot › Lot 2 › Value › Value £2,000,000
Lot › Lot 2 › Value › Currency GBP
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 2 › Second Stage › Minimum Candidates 1
Lot › Lot 2 › Second Stage › Maximum Candidates 6
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 2 › Suitable for › SMEs Yes
Lot › Lot 2 › Contract period › Start 1 Apr 2027
Lot › Lot 2 › Contract period › End 31 Mar 2030
Lot › Lot 2 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 2 › Can be renewed Yes
Lot › Lot 3 › Title Lot 3: Drainage installation/ Improvement Schemes
Lot › Lot 3 › Description • Soakaway / borehole installers • Drainage improvement Schemes • Greening and drainage works, including Sustainable Drainage Systems (SuDS)
Lot › Lot 3 › Status active
Lot › Lot 3 › Value › Value incl. VAT £6,720,000
Lot › Lot 3 › Value › Value £5,600,000
Lot › Lot 3 › Value › Currency GBP
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 3 › Second Stage › Minimum Candidates 1
Lot › Lot 3 › Second Stage › Maximum Candidates 6
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 3 › Suitable for › SMEs Yes
Lot › Lot 3 › Contract period › Start 1 Apr 2027
Lot › Lot 3 › Contract period › End 31 Mar 2030
Lot › Lot 3 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 3 › Can be renewed Yes
Lot › Lot 4 › Title Lot 4: Bridges & Structures: Structural works (up to £1M)
Lot › Lot 4 › Description The provision of structural maintenance and improvement works
Lot › Lot 4 › Status active
Lot › Lot 4 › Value › Value incl. VAT £13,680,000
Lot › Lot 4 › Value › Value £11,400,000
Lot › Lot 4 › Value › Currency GBP
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 4 › Second Stage › Minimum Candidates 1
Lot › Lot 4 › Second Stage › Maximum Candidates 6
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 4 › Suitable for › SMEs Yes
Lot › Lot 4 › Contract period › Start 1 Apr 2027
Lot › Lot 4 › Contract period › End 31 Mar 2030
Lot › Lot 4 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 4 › Can be renewed Yes
Lot › Lot 5 › Title Buckinghamshire Highways Works Open Framework - Lot 5: Conventional Surfacing
Lot › Lot 5 › Description • Carriageway inlay • Carriageway overlay • Carriageway reconstruction • Carriageway strengthening /reinforcement • Prep Work for Surface Treatments
Lot › Lot 5 › Status active
Lot › Lot 5 › Value › Value incl. VAT £55,679,999
Lot › Lot 5 › Value › Value £46,400,000
Lot › Lot 5 › Value › Currency GBP
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 5 › Second Stage › Minimum Candidates 1
Lot › Lot 5 › Second Stage › Maximum Candidates 6
Lot › Lot 5 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 5 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 5 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 5 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 5 › Suitable for › SMEs Yes
Lot › Lot 5 › Contract period › Start 1 Apr 2027
Lot › Lot 5 › Contract period › End 31 Mar 2030
Lot › Lot 5 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 5 › Can be renewed Yes
Lot › Lot 6 › Title Buckinghamshire Highways Works Open Framework - Lot 6: Specialist treatments
Lot › Lot 6 › Description • Micro surfacing • Thin surfacing systems • Surface dressing • High friction surfacing • Joint repair and reinstatement • Coloured and decorative surfacing • Retexturing • Slurry Sealing on footways
Lot › Lot 6 › Status active
Lot › Lot 6 › Value › Value incl. VAT £28,290,000
Lot › Lot 6 › Value › Value £23,575,000
Lot › Lot 6 › Value › Currency GBP
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 6 › Second Stage › Minimum Candidates 1
Lot › Lot 6 › Second Stage › Maximum Candidates 6
Lot › Lot 6 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 6 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 6 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 6 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 6 › Suitable for › SMEs Yes
Lot › Lot 6 › Contract period › Start 1 Apr 2027
Lot › Lot 6 › Contract period › End 31 Mar 2030
Lot › Lot 6 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 6 › Can be renewed Yes
Lot › Lot 7 › Title Buckinghamshire Highways Works Open Framework - Lot 7: Pavement rehabilitation
Lot › Lot 7 › Description • Grouted macadam and the like • In situ recycling • In situ recycling (cold or hot) • Full depth reclamation (FDR) • Pulverisation and stabilisation
Lot › Lot 7 › Status active
Lot › Lot 7 › Value › Value incl. VAT £14,400,000
Lot › Lot 7 › Value › Value £12,000,000
Lot › Lot 7 › Value › Currency GBP
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 7 › Second Stage › Minimum Candidates 1
Lot › Lot 7 › Second Stage › Maximum Candidates 6
Lot › Lot 7 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 7 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 7 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 7 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 7 › Suitable for › SMEs Yes
Lot › Lot 7 › Contract period › Start 1 Apr 2027
Lot › Lot 7 › Contract period › End 31 Mar 2030
Lot › Lot 7 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 7 › Can be renewed Yes
Document › Document 1 › Document type Bidding documents
Document › Document 1 › Link https://www.find-tender.service.gov.uk/Notice/Attachment/A-26177
Document › Document 2 › Document type Conflict of interest
Document › Document 2 › Description Not published
Document › Document 3 › Document type Tender notice
Document › Document 3 › Description Tender notice on Find a Tender
Document › Document 3 › Link https://www.find-tender.service.gov.uk/Notice/110379-2026
Document › Document 3 › Published 21 Nov 2026
Track this tender

Track this tender in your bid pipeline and set reminders.

See plans

Never miss a contract you could win

Search every UK public sector tender in one place, and get alerts the morning new ones appear.

Free to search No card needed Cancel any time
WhatsApp us