The provision of highway related construction works and associated services comprising capital-funded maintenance and improvement schemes, delivered in accordance with Buckinghamshire Council's asset management strategy to enhance the operation and maintain the serviceability of the highway asset and include, without limitation: This Procurement is being conducted to establish an Open Framework Scheme in accordance with Section 49 of the Procurement Act 2023. The maximum total duration of this Open Framework Scheme—including all successive framework agreements awarded under it—shall be eight (8) years from the commencement date of the initial framework agreement. The Framework is divided into seven (7) discrete Lots, with sub-lots for Lots 2, 6, and 7 as detailed below: Lot 1: Minor works (up to £1M) • Civil engineering works • Safety Fencing • Footway maintenance and improvement schemes Lot 2: Specialist minor works: Sub-lot 2A • Lining and Studs (HFS) Sub-lot 2B • Traffic Signs Lot 3: Drainage installation / Improvement Schemes • Soakaway / borehole installers • Drainage improvement Schemes • Greening and drainage works, including Sustainable Drainage Systems (SuDS) Lot 4: Bridges & Structures: Structural works (up to £1M) • Structural maintenance & improvement works Lot 5: Conventional surfacing • Carriageway inlay • Carriageway overlay • Carriageway reconstruction • Carriageway strengthening /reinforcement • Preparatory works for Surface Treatments Lot 6: Specialist treatments Sub-lot 6A • Surface dressing Sub-lot 6B • Micro surfacing Sub-lot 6C • Joint sealing Sub-lot 6D • High friction surfacing (HFS) Sub-lot 6E • Rejuvenation Lot 7: Pavement rehabilitation Sub-lot 7A • In-situ recycling Sub-lot 7B • Grouted macadam It is the Contracting Authority’s intention to appoint a maximum of four (4) suppliers to each individual Lot at any given time.

Full CPV breakdown

  • 34922100 — Road markings (primary)

Notice details

Buyer type
Local authority
Competition
Restricted / competitive (suppliers are shortlisted first)
Contract type
Works
Lots
7
Procurement method
Competitive flexible procedure
Main category
Works
Above threshold
Yes
Legal basis
UKPGA 2023/54
Notice status
Active
Renewal
The Framework will operate through a series of successive framework agreements: • The initial Framework awarded at Year 0 shall have a maximum duration of three (3) years. • Any successive Framework awarded following a reopening window shall have a maximum duration of up to five (5) years, subject always to the overarching eight (8) year limit. The initial framework phase Contract will start on 01/04/2027 and the initial term will end on 31/03/2030. The Council will reopen the Framework to competition at least once during the first three (3) years of the scheme’s life, and at least once every five (5) years thereafter. The Council explicitly reserves the right, at its absolute discretion, to reopen the scheme earlier than Year 3, or more frequently than the minimums, if it determines that a market refresh, supplementary capacity, or a change in requirements is required.
Framework agreement
Yes
Framework details
1) Pricing Bidders are required to provide a Framework Price List to be used in the development and pricing of individual Work Orders as detailed within the 3.0 FW1 - Vol 3 - Pricing Document Rev 1.0. The sample schemes provided as part of the tender evaluation process are included solely for tender evaluation purposes and do not represent, imply or establish any minimum, maximum or anticipated volume, value, type or frequency of Work Orders under the Framework Contract. The Framework Price List has been developed using the principles, structure and item descriptions contained within the current Manual of Contract Documents for Highway Works (MCHW) and associated contract-specific amendments. The Supplier is deemed to have allowed for compliance with the latest edition of the MCHW and Method of Measurement for Highway Works (MMHW), Framework Information, Framework Information, Scope and other Contract Documents applicable to the relevant Work Order. The rates tendered shall reflect the range, nature and complexity of the works anticipated under the Framework Contract. These may range from small-scale highway improvements and maintenance activities through to major highway, public realm and infrastructure schemes. Specific attention is drawn to the relevant Preambles, item coverage rules and pricing assumptions. The Supplier is deemed to have satisfied itself as to the extent of the work, services, obligations, risks and constraints included within each item and to have reflected these within its tendered rates and prices. The rates included within Volume 3 Annex 3A shall be used in the pricing of Work Orders. The Supplier shall not be entitled to propose, seek or require revised rates for items already included within the Framework Price List solely due to the size, complexity, location, duration, sequencing or characteristics of a particular Work Order. Where a required activity cannot reasonably be valued using an existing item contained within Volume 3 Annex 3A, a new item and rate may be proposed in accordance with the New Items and Prices provisions of this Volume 3. 2) Selection Procedure - see Volume 4 Framework Information The Council retains the right to determine the selection of Suppliers and the selection procedure for every Order. Option 1 – Direct Award A single Supplier is instructed to submit a quotation for a Work Order or Time Charge Order through a direct award Option 2 –Mini-competition A selection of some or all Supplier’s are instructed to submit a quotation for a Work Order or Time Charge Order through a mini-competition 3) Performance Management The Council operates a robust performance management framework to ensure high-quality delivery across the lifespan of this Framework. Performance on individual call-off contracts will be actively monitored using five (5) core Key Performance Indicators (KPIs). Further operational ‘Call-off KPIs’ will be agreed with successful bidders. Full details of the five core KPIs – including specific targets, data collection methodologies, and reporting frequencies – will be provided to shortlisted bidders within the Stage 2 Invitation to Tender (ITT) documentation. The Council reserves the right to apply all or a proportionate subset of these five KPI’s to individual call-off contracts, depending on the complexity and scope of the specific project package.
Submission method
All suppliers wishing to participate will be required to be registered on our In-tend e-procurement portal. If you are not already registered, please ensure you: 1. Visit the portal at https://in-tendhost.co.uk/buckinghamshire-council/aspx/Home 2. Complete the supplier registration process. Once registered, the reference for this procurement is BC/0002075.
Enquiries close
15 Dec 2026
Award decision expected
22 Mar 2027
Number of lots
7
Language
EN
Published
21 Nov 2026 14:33
OCID
ocds-h6vhtk-06cc4e
Notice ID
BC/0002075

Lots (7)

Lot 1: Lot 1: Highways Works: Minor works (up to £1M) £25,055,000
• Civil engineering works • Electrical works, including those associated with pedestrian crossings (e.g. signals, lighting columns, and Belisha beacons) • Safety Fencing • Traffic Signal modifications • Lighting schemes • Footway maintenance and improvement schemes 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification...
1 Apr 2027 to 31 Mar 2030 · Active
Lot 2: Lot 2: Specialist minor works - split into two (2) sub-lots £2,000,000
Lot 2 Specialist minor works is split into two sub-lots as follows: Sub-lot 2A • Lining and Studs (HFS) Sub-lot 2B • Traffic Signs 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
1 Apr 2027 to 31 Mar 2030 · Active
Lot 3: Lot 3: Drainage installation/ Improvement Schemes £5,600,000
• Soakaway / borehole installers • Drainage improvement Schemes • Greening and drainage works, including Sustainable Drainage Systems (SuDS) 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
1 Apr 2027 to 31 Mar 2030 · Active
Lot 4: Lot 4: Bridges & Structures: Structural works (up to £1M) £11,400,000
The provision of structural maintenance and improvement works for bridges and structures. Please refer to 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft].
1 Apr 2027 to 31 Mar 2030 · Active
Lot 5: Lot 5: Conventional Surfacing £46,400,000
• Carriageway inlay • Carriageway overlay • Carriageway reconstruction • Carriageway strengthening /reinforcement • Prep Work for Surface Treatments 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
1 Apr 2027 to 31 Mar 2030 · Active
Lot 6: Lot 6: Specialist treatments - split into five (5) sub lots £23,575,000
Sub-lot 6A • Surface dressing Sub-lot 6B • Micro surfacing Sub-lot 6C • Joint sealing Sub-lot 6D • High friction surfacing (HFS) Sub-lot 6E • Rejuvenation 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
1 Apr 2027 to 31 Mar 2030 · Active
Lot 7: Lot 7: Pavement rehabilitation - split into two (2) sub-lots £12,000,000
Sub-lot 7A • In-situ recycling Sub-lot 7B • Grouted macadam 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
1 Apr 2027 to 31 Mar 2030 · Active

Everything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see

Organisations

Name Buckinghamshire Council
Address › Street The Gateway, Gatehouse Road
Address › Town / city Aylesbury
Address › Postcode HP198FF
Address › Country GB
Address › Country United Kingdom
Address › Region (NUTS) UKJ13
Role buyer
Link https://www.buckinghamshire.gov.uk/
Classification › Description Public authority - sub-central government

Buyer

Name Buckinghamshire Council

Tender

Title Buckinghamshire Highways Works Open Framework
Status active
Item › Item 1 › CPV › CPV 1 › Description Road markings
Item › Item 1 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 1 › CPV › CPV 3 › Description Drainage works
Item › Item 1 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 1 › CPV › CPV 5 › Description Construction work for highways
Item › Item 1 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 1 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 1 › CPV › CPV 8 › Description Surface work for highways
Item › Item 1 › CPV › CPV 9 › Description Surface work for roads
Item › Item 1 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 1 › Delivery › Region (NUTS) UKJ13
Item › Item 1 › Delivery › Country GB
Item › Item 1 › Delivery › Country United Kingdom
Item › Item 2 › CPV › CPV 1 › Description Road markings
Item › Item 2 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 2 › CPV › CPV 3 › Description Drainage works
Item › Item 2 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 2 › CPV › CPV 5 › Description Construction work for highways
Item › Item 2 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 2 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 2 › CPV › CPV 8 › Description Surface work for highways
Item › Item 2 › CPV › CPV 9 › Description Surface work for roads
Item › Item 2 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 2 › Delivery › Region (NUTS) UKJ13
Item › Item 2 › Delivery › Country GB
Item › Item 2 › Delivery › Country United Kingdom
Item › Item 3 › CPV › CPV 1 › Description Road markings
Item › Item 3 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 3 › CPV › CPV 3 › Description Drainage works
Item › Item 3 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 3 › CPV › CPV 5 › Description Construction work for highways
Item › Item 3 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 3 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 3 › CPV › CPV 8 › Description Surface work for highways
Item › Item 3 › CPV › CPV 9 › Description Surface work for roads
Item › Item 3 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 3 › Delivery › Region (NUTS) UKJ13
Item › Item 3 › Delivery › Country GB
Item › Item 3 › Delivery › Country United Kingdom
Item › Item 4 › CPV › CPV 1 › Description Road markings
Item › Item 4 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 4 › CPV › CPV 3 › Description Drainage works
Item › Item 4 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 4 › CPV › CPV 5 › Description Construction work for highways
Item › Item 4 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 4 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 4 › CPV › CPV 8 › Description Surface work for highways
Item › Item 4 › CPV › CPV 9 › Description Surface work for roads
Item › Item 4 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 4 › Delivery › Region (NUTS) UKJ13
Item › Item 4 › Delivery › Country GB
Item › Item 4 › Delivery › Country United Kingdom
Item › Item 5 › CPV › CPV 1 › Description Road markings
Item › Item 5 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 5 › CPV › CPV 3 › Description Drainage works
Item › Item 5 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 5 › CPV › CPV 5 › Description Construction work for highways
Item › Item 5 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 5 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 5 › CPV › CPV 8 › Description Surface work for highways
Item › Item 5 › CPV › CPV 9 › Description Surface work for roads
Item › Item 5 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 5 › Delivery › Region (NUTS) UKJ13
Item › Item 5 › Delivery › Country GB
Item › Item 5 › Delivery › Country United Kingdom
Item › Item 6 › CPV › CPV 1 › Description Road markings
Item › Item 6 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 6 › CPV › CPV 3 › Description Drainage works
Item › Item 6 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 6 › CPV › CPV 5 › Description Construction work for highways
Item › Item 6 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 6 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 6 › CPV › CPV 8 › Description Surface work for highways
Item › Item 6 › CPV › CPV 9 › Description Surface work for roads
Item › Item 6 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 6 › Delivery › Region (NUTS) UKJ13
Item › Item 6 › Delivery › Country GB
Item › Item 6 › Delivery › Country United Kingdom
Item › Item 7 › CPV › CPV 1 › Description Road markings
Item › Item 7 › CPV › CPV 2 › Description Ground-drainage work
Item › Item 7 › CPV › CPV 3 › Description Drainage works
Item › Item 7 › CPV › CPV 4 › Description Construction work for highways, roads
Item › Item 7 › CPV › CPV 5 › Description Construction work for highways
Item › Item 7 › CPV › CPV 6 › Description Construction work for elevated highways
Item › Item 7 › CPV › CPV 7 › Description Road-maintenance works
Item › Item 7 › CPV › CPV 8 › Description Surface work for highways
Item › Item 7 › CPV › CPV 9 › Description Surface work for roads
Item › Item 7 › CPV › CPV 10 › Description Foundation work for highways, roads, streets and footpaths
Item › Item 7 › Delivery › Region (NUTS) UKJ13
Item › Item 7 › Delivery › Country GB
Item › Item 7 › Delivery › Country United Kingdom
Value › Value incl. VAT £151,236,000
Value › Value £126,030,000
Value › Currency GBP
Procedure type selective
Procedure Competitive flexible procedure
Category works
Above threshold Yes
Techniques › Framework agreement Yes
Techniques › Framework agreement › Is Open Framework Scheme Yes
Techniques › Framework agreement › Method With reopening competition
Techniques › Framework agreement › Type closed
Techniques › Framework agreement › Open Framework Scheme End Date 31 Mar 2035
How to submit All suppliers wishing to participate will be required to be registered on our In-tend e-procurement portal. If you are not already registered, please ensure you: 1. Visit the portal at https://in-tendhost.co.uk/buckinghamshire-council/aspx/Home 2. Complete the supplier registration process. Once registered, the reference for this procurement is BC/0002075.
Submission Terms › Electronic submission allowed
Submission Terms › Languages en
Expression Of Interest Deadline 23 Dec 2026
Questions period › End 15 Dec 2026
Award decision period › End 22 Mar 2027
Lot › Lot 1 › Title Lot 1: Highways Works: Minor works (up to £1M)
Lot › Lot 1 › Description • Civil engineering works • Electrical works, including those associated with pedestrian crossings (e.g. signals, lighting columns, and Belisha beacons) • Safety Fencing • Traffic Signal modifications • Lighting schemes • Footway maintenance and improvement schemes 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
Lot › Lot 1 › Status active
Lot › Lot 1 › Value › Value incl. VAT £30,066,000
Lot › Lot 1 › Value › Value £25,055,000
Lot › Lot 1 › Value › Currency GBP
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 1 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 1 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 1 › Second Stage › Minimum Candidates 4
Lot › Lot 1 › Second Stage › Maximum Candidates 6
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 1 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 1 › Suitable for › SMEs Yes
Lot › Lot 1 › Contract period › Start 1 Apr 2027
Lot › Lot 1 › Contract period › End 31 Mar 2030
Lot › Lot 1 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 1 › Can be renewed Yes
Lot › Lot 2 › Title Lot 2: Specialist minor works - split into two (2) sub-lots
Lot › Lot 2 › Description Lot 2 Specialist minor works is split into two sub-lots as follows: Sub-lot 2A • Lining and Studs (HFS) Sub-lot 2B • Traffic Signs 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
Lot › Lot 2 › Status active
Lot › Lot 2 › Value › Value incl. VAT £2,400,000
Lot › Lot 2 › Value › Value £2,000,000
Lot › Lot 2 › Value › Currency GBP
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 2 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 2 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 2 › Second Stage › Minimum Candidates 4
Lot › Lot 2 › Second Stage › Maximum Candidates 6
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 2 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 2 › Suitable for › SMEs Yes
Lot › Lot 2 › Contract period › Start 1 Apr 2027
Lot › Lot 2 › Contract period › End 31 Mar 2030
Lot › Lot 2 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 2 › Can be renewed Yes
Lot › Lot 3 › Title Lot 3: Drainage installation/ Improvement Schemes
Lot › Lot 3 › Description • Soakaway / borehole installers • Drainage improvement Schemes • Greening and drainage works, including Sustainable Drainage Systems (SuDS) 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
Lot › Lot 3 › Status active
Lot › Lot 3 › Value › Value incl. VAT £6,720,000
Lot › Lot 3 › Value › Value £5,600,000
Lot › Lot 3 › Value › Currency GBP
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 3 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 3 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 3 › Second Stage › Minimum Candidates 4
Lot › Lot 3 › Second Stage › Maximum Candidates 6
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 3 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 3 › Suitable for › SMEs Yes
Lot › Lot 3 › Contract period › Start 1 Apr 2027
Lot › Lot 3 › Contract period › End 31 Mar 2030
Lot › Lot 3 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 3 › Can be renewed Yes
Lot › Lot 4 › Title Lot 4: Bridges & Structures: Structural works (up to £1M)
Lot › Lot 4 › Description The provision of structural maintenance and improvement works for bridges and structures. Please refer to 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft].
Lot › Lot 4 › Status active
Lot › Lot 4 › Value › Value incl. VAT £13,680,000
Lot › Lot 4 › Value › Value £11,400,000
Lot › Lot 4 › Value › Currency GBP
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 4 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 4 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 4 › Second Stage › Minimum Candidates 4
Lot › Lot 4 › Second Stage › Maximum Candidates 6
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 4 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 4 › Suitable for › SMEs Yes
Lot › Lot 4 › Contract period › Start 1 Apr 2027
Lot › Lot 4 › Contract period › End 31 Mar 2030
Lot › Lot 4 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 4 › Can be renewed Yes
Lot › Lot 5 › Title Lot 5: Conventional Surfacing
Lot › Lot 5 › Description • Carriageway inlay • Carriageway overlay • Carriageway reconstruction • Carriageway strengthening /reinforcement • Prep Work for Surface Treatments 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
Lot › Lot 5 › Status active
Lot › Lot 5 › Value › Value incl. VAT £55,679,999
Lot › Lot 5 › Value › Value £46,400,000
Lot › Lot 5 › Value › Currency GBP
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 5 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 5 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 5 › Second Stage › Minimum Candidates 4
Lot › Lot 5 › Second Stage › Maximum Candidates 6
Lot › Lot 5 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 5 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 5 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 5 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 5 › Suitable for › SMEs Yes
Lot › Lot 5 › Contract period › Start 1 Apr 2027
Lot › Lot 5 › Contract period › End 31 Mar 2030
Lot › Lot 5 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 5 › Can be renewed Yes
Lot › Lot 6 › Title Lot 6: Specialist treatments - split into five (5) sub lots
Lot › Lot 6 › Description Sub-lot 6A • Surface dressing Sub-lot 6B • Micro surfacing Sub-lot 6C • Joint sealing Sub-lot 6D • High friction surfacing (HFS) Sub-lot 6E • Rejuvenation 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
Lot › Lot 6 › Status active
Lot › Lot 6 › Value › Value incl. VAT £28,290,000
Lot › Lot 6 › Value › Value £23,575,000
Lot › Lot 6 › Value › Currency GBP
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 6 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 6 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 6 › Second Stage › Minimum Candidates 4
Lot › Lot 6 › Second Stage › Maximum Candidates 6
Lot › Lot 6 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 6 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 6 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 6 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 6 › Suitable for › SMEs Yes
Lot › Lot 6 › Contract period › Start 1 Apr 2027
Lot › Lot 6 › Contract period › End 31 Mar 2030
Lot › Lot 6 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 6 › Can be renewed Yes
Lot › Lot 7 › Title Lot 7: Pavement rehabilitation - split into two (2) sub-lots
Lot › Lot 7 › Description Sub-lot 7A • In-situ recycling Sub-lot 7B • Grouted macadam 4.1 FW1 - Vol 4 - Annex 4A - Technical Specification [Draft]
Lot › Lot 7 › Status active
Lot › Lot 7 › Value › Value incl. VAT £14,400,000
Lot › Lot 7 › Value › Value £12,000,000
Lot › Lot 7 › Value › Currency GBP
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Type quality
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Name Quality assessment criteria
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Weighting › Weight 40
Lot › Lot 7 › Award criteria › Criterion › Criterion 1 › Weighting › Weight type Percentage exact
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Type price
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Name Price Assessment Criteria
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Description The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below. Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Weighting › Weight 60
Lot › Lot 7 › Award criteria › Criterion › Criterion 2 › Weighting › Weight type Percentage exact
Lot › Lot 7 › Second Stage › Minimum Candidates 4
Lot › Lot 7 › Second Stage › Maximum Candidates 6
Lot › Lot 7 › Selection Criteria › Criterion › Criterion 1 › Type economic
Lot › Lot 7 › Selection Criteria › Criterion › Criterion 2 › Type technical
Lot › Lot 7 › Selection Criteria › Criterion › Criterion 2 › Description As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form: Q21 and Q22: Relevant experience and contract examples Q23: Key Personnel & Delivery Team Q24: Health & Safety Policy Q25: General Data Protection Q26: Net Zero 2050
Lot › Lot 7 › Selection Criteria › Criterion › Criterion 3 › For Reduction Yes
Lot › Lot 7 › Suitable for › SMEs Yes
Lot › Lot 7 › Contract period › Start 1 Apr 2027
Lot › Lot 7 › Contract period › End 31 Mar 2030
Lot › Lot 7 › Contract period › Can be extended to 31 Mar 2035
Lot › Lot 7 › Can be renewed Yes
Document › Document 1 › Document type Bidding documents
Document › Document 1 › Link https://www.find-tender.service.gov.uk/Notice/Attachment/A-26177
Document › Document 2 › Document type Conflict of interest
Document › Document 2 › Description Not published
Document › Document 3 › Document type Tender notice
Document › Document 3 › Description Tender notice on Find a Tender
Document › Document 3 › Link https://www.find-tender.service.gov.uk/Notice/110382-2026
Document › Document 3 › Published 21 Nov 2026
Amendment › Description 1) Identification and details of sub-lots for Lots 2, 6, 7. 2) Pricing and mini competition information.
Track this tender

Track this tender in your bid pipeline and set reminders.

See plans

Never miss a contract you could win

Search every UK public sector tender in one place, and get alerts the morning new ones appear.

Free to search No card needed Cancel any time
WhatsApp us