Back to search
Find a Tender
AWARD
Framework Complete
Delivery of Stairlift and Specialist Lift Adaptations
Published 16 Apr 2026
16 Apr 2026
- Primary CPV
-
44115600 *
Stairlifts
- Location
- 🇬🇧 Leeds, Yorkshire & the Humber
- Value
- £1,900,000
- Contract
-
3 years Duration
05/01/2026 04/01/2029
- Contract Types
-
44 *Construction structures & materialsFull CPV Breakdown
- SME suitable
- Not stated
Publisher Address
Civic Hall, Calverley Street, Leeds, LS1 1UR, United Kingdom · UKE42
Contact
Award Criteria
Not specified
- Contract Signed (find-tender.service.gov.uk) · Contract Signed
- Contract Signed (find-tender.service.gov.uk) · Contract Signed
- Contract Signed (find-tender.service.gov.uk) · Contract Signed
- Contract Signed (find-tender.service.gov.uk) · Contract Signed
- Contract Signed (find-tender.service.gov.uk) · Contract Signed
Related tenders
Leeds City Council
All notices from this publisher Same CPV code
44115600 *
All notices with this CPV code
Reference: 99775
Below-threshold open competitive procedure to appoint contractors to deliver stairlift and specialist lift adaptations to the Council's domestic and non-housing properties. The procurement will be divided into the following two lots: Lot 1 - Stairlifts: Manufacture, Installation, Maintenance & Recycle (estimated value £475,000 per annum) and Lot 2 - Specialist Lifts: Manufacture, Supply, Installation, Maintenance & Recycle (£195,000 per annum).
Awarded to
Full CPV breakdown
- 44115600 — Stairlifts (primary)
Notice details
- Buyer type
- Local authority
- Contract type
- Works
- Winning supplier
- SME
- Procurement method
- Below threshold - unknown
- Main category
- Works
- Legal basis
- UKPGA 2023/54
- Notice status
- Complete
- Award status
- Active
- Framework agreement
- Yes
- Framework details
- Lot 1: Manufacture, Supply, Installation and Recycling Stairlifts: work will be allocated on a ranked basis, meaning that the organisation identified as the most advantageous tenderer will be offered work in the first instance, with the second contractor approached only where the first ranked contractor is unable to deliver the requirement. Due to the nature of this provision, there is no guarantee of any volume of works throughout the framework term. Lot 2 - Manufacture, Supply, Installation and Recycling Specialist Lifts: Work will be allocated on a ranked basis, meaning that the organisation identified as the most advantageous tenderer will be offered work in the first instance, with the second contractor approached only where the first ranked contractor is unable to deliver the requirement and so on. Due to the nature of this provision, there is no guarantee of any volume of works throughout the framework term.
- Language
- EN
- Published
- 16 Apr 2026 11:03
- OCID
- ocds-h6vhtk-0683e4
- Notice ID
- 99775
Organisations on this notice
Supplier Large
Watt Close, East Portway Industrial Estate, Andover, SP103SD, United Kingdom
sa•••••
Upgrade to Pro to see
GB-COH 1189799
Supplier SME
214 - 216 Widmore road, Bromley, BR1 2RH, United Kingdom
ja•••••
Upgrade to Pro to see
GB-PPON PPDR-7497-MQNC
Supplier SME
1 Longridge Trading Estate, Cheshire, WA16 8PR, United Kingdom
te•••••
Upgrade to Pro to see
GB-COH 01683339
Supplier SME
No 38 The Maltings No 38 The Malting Business Centre, Stanstead Abbotts, SG12 8HG, United Kingdom
te•••••
Upgrade to Pro to see
GB-COH 01269836
Supplier SME
1 Sloefield Drive, Carrickfergus, BT38 8GX, United Kingdom
lc•••••
Upgrade to Pro to see
GB-COH NI018971
Full notice record
157 detailsEverything the publisher included in this notice, organised by section. Contact details hidden: upgrade to Pro to see
Organisations
| Party 1 › Name | Leeds City Council |
| Party 1 › Address › Street | Civic Hall, Calverley Street |
| Party 1 › Address › Town / city | Leeds |
| Party 1 › Address › Postcode | LS1 1UR |
| Party 1 › Address › Country | GB |
| Party 1 › Address › Country | United Kingdom |
| Party 1 › Address › Region (NUTS) | UKE42 |
| Party 1 › Role | buyer |
| Party 1 › Link | http://www.leeds.gov.uk |
| Party 1 › Classification › Description | Public authority - sub-central government |
| Party 2 › Name | Stannah Lift Services Limited |
| Party 2 › Address › Street | Watt Close, East Portway Industrial Estate |
| Party 2 › Address › Town / city | Andover |
| Party 2 › Address › Postcode | SP103SD |
| Party 2 › Address › Country | GB |
| Party 2 › Address › Country | United Kingdom |
| Party 2 › Address › Region (NUTS) | UKJ36 |
| Party 2 › Role | supplier |
| Party 2 › Link | http://www.stannah.co.uk |
| Party 2 › Business size | large |
| Party 2 › VCSEs | No |
| Party 3 › Name | Ammcass Construction Engineering Group |
| Party 3 › Address › Street | 214 - 216 Widmore road |
| Party 3 › Address › Town / city | Bromley |
| Party 3 › Address › Postcode | BR1 2RH |
| Party 3 › Address › Country | GB |
| Party 3 › Address › Country | United Kingdom |
| Party 3 › Address › Region (NUTS) | UKI61 |
| Party 3 › Role | supplier |
| Party 3 › Business size | sme |
| Party 3 › VCSEs | No |
| Party 4 › Name | TERRY GROUP LIMITED |
| Party 4 › Address › Street | 1 Longridge Trading Estate |
| Party 4 › Address › Town / city | Cheshire |
| Party 4 › Address › Postcode | WA16 8PR |
| Party 4 › Address › Country | GB |
| Party 4 › Address › Country | United Kingdom |
| Party 4 › Address › Region (NUTS) | UKD62 |
| Party 4 › Role | supplier |
| Party 4 › Link | http://www.terrylifts.co.uk |
| Party 4 › Business size | sme |
| Party 4 › VCSEs | No |
| Party 5 › Name | WESSEX LIFT CO LTD |
| Party 5 › Address › Street | No 38 The Maltings No 38 The Malting Business Centre |
| Party 5 › Address › Town / city | Stanstead Abbotts |
| Party 5 › Address › Postcode | SG12 8HG |
| Party 5 › Address › Country | GB |
| Party 5 › Address › Country | United Kingdom |
| Party 5 › Address › Region (NUTS) | UKH23 |
| Party 5 › Role | supplier |
| Party 5 › Link | http://www.wessexlifts.co.uk |
| Party 5 › Business size | sme |
| Party 5 › VCSEs | No |
| Party 6 › Name | POLLOCK LIFTS LIMITED |
| Party 6 › Address › Street | 1 Sloefield Drive |
| Party 6 › Address › Town / city | Carrickfergus |
| Party 6 › Address › Postcode | BT38 8GX |
| Party 6 › Address › Country | GB |
| Party 6 › Address › Country | United Kingdom |
| Party 6 › Address › Region (NUTS) | UKN0F |
| Party 6 › Role | supplier |
| Party 6 › Link | http://www.pollocklifts.co.uk |
| Party 6 › Business size | sme |
| Party 6 › VCSEs | No |
Buyer
| Name | Leeds City Council |
Tender
| Title | Delivery of Stairlift and Specialist Lift Adaptations |
| Description | Below-threshold open competitive procedure to appoint contractors to deliver stairlift and specialist lift adaptations to the Council's domestic and non-housing properties. The procurement will be divided into the following two lots: Lot 1 - Stairlifts: Manufacture, Installation, Maintenance & Recycle (estimated value £475,000 per annum) and Lot 2 - Specialist Lifts: Manufacture, Supply, Installation, Maintenance & Recycle (£195,000 per annum). |
| Status | complete |
| Procedure | Below threshold - unknown |
| Techniques › Framework agreement | Yes |
| Techniques › Framework agreement › Method | Without reopening competition |
| Techniques › Framework agreement › Type | closed |
| Lot › Status | complete |
Awards
| Award 1 › Status | active |
| Award 1 › Category | works |
| Award 1 › Supplier › Supplier 1 › Name | Stannah Lift Services Limited |
| Award 1 › Supplier › Supplier 2 › Name | Ammcass Construction Engineering Group |
| Award 1 › Item › CPV › CPV 1 › Description | Stairlifts |
| Award 1 › Item › CPV › CPV 2 › Description | Construction work for chair lifts |
| Award 1 › Item › Delivery › Region (NUTS) | UKE42 |
| Award 1 › Item › Delivery › Country | GB |
| Award 1 › Item › Delivery › Country | United Kingdom |
| Award 2 › Status | active |
| Award 2 › Category | works |
| Award 2 › Supplier › Supplier 1 › Name | TERRY GROUP LIMITED |
| Award 2 › Supplier › Supplier 2 › Name | WESSEX LIFT CO LTD |
| Award 2 › Supplier › Supplier 3 › Name | POLLOCK LIFTS LIMITED |
| Award 2 › Item › CPV › Description | Construction work for chair lifts |
| Award 2 › Item › Delivery › Region (NUTS) | UKE42 |
| Award 2 › Item › Delivery › Country | GB |
| Award 2 › Item › Delivery › Country | United Kingdom |
Contracts
| Contract 1 › Title | Lot 1 Stairlifts |
| Contract 1 › Status | active |
| Contract 1 › Contract period › Start | 5 Jan 2026 |
| Contract 1 › Contract period › End | 4 Jan 2029 |
| Contract 1 › Contract period › Can be extended to | 4 Jan 2030 |
| Contract 1 › Can be renewed | Yes |
| Contract 1 › Renewal › Description | There is the option to extend for one further period of 12 months at the discretion of Leeds City Council. |
| Contract 1 › Value › Value incl. VAT | £2,280,000 |
| Contract 1 › Value › Value | £1,900,000 |
| Contract 1 › Value › Currency | GBP |
| Contract 1 › Above threshold | No |
| Contract 1 › Signed | 5 Jan 2026 |
| Contract 1 › Document › Document 1 › Document type | Contract signed |
| Contract 1 › Document › Document 1 › Link | https://www.find-tender.service.gov.uk/Notice/Attachment/A-14829 |
| Contract 1 › Document › Document 2 › Document type | Contract signed |
| Contract 1 › Document › Document 2 › Link | https://www.find-tender.service.gov.uk/Notice/Attachment/A-14830 |
| Contract 1 › Document › Document 3 › Document type | Contract notice |
| Contract 1 › Document › Document 3 › Description | Contract details notice on Find a Tender |
| Contract 1 › Document › Document 3 › Link | https://www.find-tender.service.gov.uk/Notice/034570-2026 |
| Contract 1 › Document › Document 3 › Published | 16 Apr 2026 |
| Contract 1 › Agreed Metrics › Agreed Metric 1 › Title | Percentage of Major Adaptations Completed within Agreed Completion Date |
| Contract 1 › Agreed Metrics › Agreed Metric 1 › Description | The percentage of all Major Adaptations completed within a specific agreed target. The Contractor should aim to complete the Major Adaptation within the agreed target date wherever possible. |
| Contract 1 › Agreed Metrics › Agreed Metric 1 › Observations › Contract period › Duration In Months | 12 |
| Contract 1 › Agreed Metrics › Agreed Metric 2 › Title | Percentage of Tenants satisfied with the Major Adaptations Service provided by the Contractor |
| Contract 1 › Agreed Metrics › Agreed Metric 2 › Description | The Council will undertake postal and / or telephone surveys on a representative sample of Tenants who have recently had Major Adaptation works carried out. Tenants will be asked how satisfied or dissatisfied they were with the adaptations service provided by the Contractor. |
| Contract 1 › Agreed Metrics › Agreed Metric 2 › Observations › Contract period › Duration In Months | 3 |
| Contract 1 › Agreed Metrics › Agreed Metric 3 › Title | Percentage of Compliant Health and Safety Site Inspections |
| Contract 1 › Agreed Metrics › Agreed Metric 3 › Description | The percentage of all Health and Safety (H&S) site inspections conducted by the Council that achieve compliancy. The Contractor should aim for all sites to meet H&S compliance as a minimum standard. |
| Contract 1 › Agreed Metrics › Agreed Metric 3 › Observations › Contract period › Duration In Months | 12 |
| Contract 1 › Agreed Metrics › Agreed Metric 4 › Title | Number of reported breakdowns/call outs on each unit attended within the first 12 months. Including attendance data. |
| Contract 1 › Agreed Metrics › Agreed Metric 4 › Description | Within the first 12 months following installation, the contractor is to notify the Council of each and every breakdown/call out attended. This is to include Time Reported, Time of Arrival and Time job completed with the result. The contractor is to provide a monthly report to show the number of reported breakdowns/Call Outs attended and provide specific details of findings. Four categories to be reported as follows:- • User Error • Installation Fault • Electrical Fault • Hygiene Issue |
| Contract 1 › Agreed Metrics › Agreed Metric 4 › Observations › Contract period › Duration In Months | 12 |
| Contract 2 › Title | Lot 2 Specialist Lifts |
| Contract 2 › Status | active |
| Contract 2 › Contract period › Start | 5 Jan 2026 |
| Contract 2 › Contract period › End | 4 Jan 2029 |
| Contract 2 › Contract period › Can be extended to | 4 Jan 2030 |
| Contract 2 › Can be renewed | Yes |
| Contract 2 › Renewal › Description | The contract maybe extended by one period of 12 months at the discretion of Leeds City Council. |
| Contract 2 › Value › Value incl. VAT | £936,000 |
| Contract 2 › Value › Value | £780,000 |
| Contract 2 › Value › Currency | GBP |
| Contract 2 › Above threshold | No |
| Contract 2 › Signed | 5 Jan 2026 |
| Contract 2 › Document › Document 1 › Document type | Contract signed |
| Contract 2 › Document › Document 1 › Link | https://www.find-tender.service.gov.uk/Notice/Attachment/A-14833 |
| Contract 2 › Document › Document 2 › Document type | Contract signed |
| Contract 2 › Document › Document 2 › Link | https://www.find-tender.service.gov.uk/Notice/Attachment/A-14834 |
| Contract 2 › Document › Document 3 › Document type | Contract signed |
| Contract 2 › Document › Document 3 › Link | https://www.find-tender.service.gov.uk/Notice/Attachment/A-14835 |
| Contract 2 › Document › Document 4 › Document type | Contract notice |
| Contract 2 › Document › Document 4 › Description | Contract details notice on Find a Tender |
| Contract 2 › Document › Document 4 › Link | https://www.find-tender.service.gov.uk/Notice/034570-2026 |
| Contract 2 › Document › Document 4 › Published | 16 Apr 2026 |
| Contract 2 › Agreed Metrics › Agreed Metric 1 › Title | Percentage of Major Adaptations Completed within Agreed Completion Date |
| Contract 2 › Agreed Metrics › Agreed Metric 1 › Description | The percentage of all Major Adaptations completed within a specific agreed target. The Contractor should aim to complete the Major Adaptation within the agreed target date wherever possible. |
| Contract 2 › Agreed Metrics › Agreed Metric 1 › Observations › Contract period › Duration In Months | 12 |
| Contract 2 › Agreed Metrics › Agreed Metric 2 › Title | Percentage of Tenants satisfied with the Major Adaptations Service provided by the Contractor |
| Contract 2 › Agreed Metrics › Agreed Metric 2 › Description | The Council will undertake postal and / or telephone surveys on a representative sample of Tenants who have recently had Major Adaptation works carried out. Tenants will be asked how satisfied or dissatisfied they were with the adaptations service provided by the Contractor. |
| Contract 2 › Agreed Metrics › Agreed Metric 2 › Observations › Contract period › Duration In Months | 3 |
| Contract 2 › Agreed Metrics › Agreed Metric 3 › Title | Percentage of Compliant Health and Safety Site Inspections |
| Contract 2 › Agreed Metrics › Agreed Metric 3 › Description | The percentage of all Health and Safety (H&S) site inspections conducted by the Council that achieve compliancy. The Contractor should aim for all sites to meet H&S compliance as a minimum standard. |
| Contract 2 › Agreed Metrics › Agreed Metric 3 › Observations › Contract period › Duration In Months | 12 |
| Contract 2 › Agreed Metrics › Agreed Metric 4 › Title | Number of reported breakdowns/call outs on each unit attended within the first 12 months. Including attendance data. |
| Contract 2 › Agreed Metrics › Agreed Metric 4 › Description | Within the first 12 months following installation, the contractor is to notify the Council of each and every breakdown/call out attended. This is to include Time Reported, Time of Arrival and Time job completed with the result. The contractor is to provide a monthly report to show the number of reported breakdowns/Call Outs attended and provide specific details of findings. Four categories to be reported as follows:- • User Error • Installation Fault • Electrical Fault • Hygiene Issue |
| Contract 2 › Agreed Metrics › Agreed Metric 4 › Observations › Contract period › Duration In Months | 12 |